• Title/Summary/Keyword: 초기비용

Search Result 1,234, Processing Time 0.03 seconds

A Study on the Selection of a Bridge Structure Type Using DEA and LCC (DEA기법과 LCC개념을 활용한 교량형식 선정 방법에 관한 연구)

  • Han, Sam-Heui;Kim, Jong-Gil
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.4
    • /
    • pp.101-111
    • /
    • 2013
  • In this study, DEA (Data Envelopment Analysis) was carried out on the four bridges, which have the same extension (L=1,615m), in order to select the most superior, economical method of construction using the LCC concept of each bridge structure in the case of the Ulsan-Pohang double track railway which is scheduled to be constructed. DEA models were analyzed with the CCR model, which was designed for the evaluation of relative efficiency of each model. The initial construction costs, maintenance costs, indirect costs (user costs + indirect loss of social costs), and life cycle costs were used as input variables, and average duration was applied as the output variable. LCC was applied to calculate the input variables, and to get the costs of LCC, 100 years of period and 4.83% of real discount rate were applied, and the costs are classified into initial construction, maintenance, user, and indirect loss of social cost. The analysis results showed that the Method 2 and 3 were evaluated as the most efficient, and the other alternatives were evaluated as the following order; Method 1, the default, and Method 4.

인트라네트 동향과 데이터베이스(1)

  • Lee, Yong-Ho
    • Digital Contents
    • /
    • no.1 s.44
    • /
    • pp.43-48
    • /
    • 1997
  • 1996년을 "인터넷의 해"라고 말한다면 1997년은 "인트라네트의 해"가 될 것이라고 한다. 벌써 미국의 경우 수천개의 기업들이 이미 내부 인트라네트구축에 열을 올리고 있고 기업의 고정 비용을 줄이고 초기비용, 속도, 신뢰성을 높이는 방안으로 인트라네트가 제시되고 있다. 앞으로 기업은 고객과 원자재 공급자등 상호 긴밀히 연계될 수 있어야 고용 효과도 증대되고 생산성도 향상된다고 믿고 있는 것이다. 이처럼 인트라네트는 이제 남의 나라일이 아니며 우리와 같이 고물가, 고임금으로 인한 국가 경쟁력이 떨어지고 있는 국가에서는 필수적으로 검토해야 할 대상이 아닌가 생각한다. 본고는 이러한 기업의 효율적인 관리수단이 될 수 있는 인트라네트의 특징을 살펴보고 기존의 데이터베이스와 웹 연결과 웹 기술의 최근 표준화 관점에서 기술해 보겠다.

  • PDF

Optimum Maintenance and Retrofit Planning for Reliable Seismic Performance of the Bridges (내진성능확보를 위한 교량의 최적유지보수계획법)

  • 고현무;이선영;박관순;김동석
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.6 no.5
    • /
    • pp.29-36
    • /
    • 2002
  • In the maintenance and retrofit planning of a bridge system, the optimal strategy for inspection and repair are suggested by minimizing the expected total life-cycle cost, which includes the initial cost, the costs of inspection, repair, and failure. Degradation of seismic performance is modeled by using a damage function. And failure probability is computed according to the degree of damage detection by random vibration theory and the event tree analysis. As an example to illustrate the proposed approach, a 10-span continuous bridge structure is used. The numerical results show that the optimum number of the inspection and the repair are increased, as the seismic intensity is increased and the soil condition of a site becomes more flexible.

The study on the prediction of the remaining life at the fillet welded joint by using eletric potential method (전위차법에 의한 필렛용접부의 잔여수명 예측에 관한 연구)

  • Um, Tae-Hwan;Chang, Kyong-Ho;Lee, Jae-Sun;Lee, Jin-Hee;Kim, You-Chul
    • Proceedings of the KWS Conference
    • /
    • 2010.05a
    • /
    • pp.56-56
    • /
    • 2010
  • 최근 강구조물의 건설이 지속적으로 증가되어 왔다. 또한 강구조물의 유지관리 및 안전성에 대한 관심이 급증하고 있다. 시설물의 안전성 확보는 대형사고의 사전 예방, 공용 중 갑작스런 가동 중지에 의하여 발생되는 비용증가를 사전에 차단 할 수 있다는 점에서 그 중요성은 매우 크다고 할 수 있다. 또한 각종 구조물은 열악한 사용조건, 고온, 고압, 고속, 대형화됨에 따라 일단 사고가 발생 했을 경우 대형사고의 위험이 예상되므로, 제작시 검사의 강화뿐만이 아니라 공용 중 구조물의 안전성을 진단 할 수 있는 모니터링 체계의 확립이 필요한 시점이다. 현재 국내에서 강구조물들의 균열 모니터링 시스템에 관한 연구는 매우 미흡한 실정이며, 현재 사용되고 있는 비파괴검사 방법은 UT와 RT등이다. 이러한 방법들은 많은 시간과 경비가 소요되며 또한 거대구조물 혹은 사람의 접근이 어려운 곳에는 적용하기가 힘들다. 또한 주기적인 검사 작업으로 인한 막대한 시간과 비용의 손실이 발생되고 있으며 초기 결함을 조기에 인지하지 못함으로써 적절한 보수 보강 대책이 이루어지지 않아 보수 보강 비용의 증대를 초래한다. 더욱이, 결함이 진전된 이후에도 이것을 인지하지 못하여 적절한 대응을 하지 않는다면 대형사고로 이어질 수도 있다. 따라서 강구조물에 대한 효율적인 유지관리가 가능하고, 초기결함으로부터 균열이 진전하여 붕괴되는 사고를 미연에 방지하며 초기에 보수보강 작업을 수행함으로써 보수보강 비용도 절감 할 수 있는 모니터링 시스템의 개발이 요구되고 있다. 이러한 모니터링 시스템의 개발은 기술적 측면에서 강구조물의 효율적인 유지 관리 노하우를 얻을 수 있으며 경제 산업적 측면에서는 보수 보강 비용 및 불필요한 주기적 점검 비용을 절감 할 수 있다. 이 연구에서는 전위차법을 이용하여 강구조물의 필렛 용접부에서의 균열진전양상을 파악하고 정량화를 통해 필렛용접부의 잔여수명을 예측하였다.

  • PDF

Highway Maintenance Cost Optimization Using GSIS (지형정보를 이용한 도로의 최적 유지관리 비용 산정)

  • 강인준;이준석
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.20 no.4
    • /
    • pp.367-374
    • /
    • 2002
  • Maintainability of highways is an important problem that is considered in the planning steps of a highway development process. A number of asset management systems have been developed to precisely predict maintenance and pavement expenditures for better decision making, But these systems are not helpful in reducing maintenance costs. Optimization of some highway design characteristics in the planning phases may reduce maintenance costs over the life cycle of highway. The formulations for initial and maintenance costs have been developed based on which design variables can be chosen to minimize these costs, focusing on the sideslope in cut and fill sections. Maintenance cost has been represented as a function of sideslope, width of highway cross section, and annual average daily traffic. A real geographic database of between Chung joo and Sang joo city in Choong buk was used and it is presented to investigate the sensitivities of maintenance cost and soil characteristics in selecting alignments. In this study, we present that maintenance cost and soil characteristics are important considerations in alignment optimization.

A Development Cost Estimation at Initial Phase for Military Software Using Backfiring Approach (백파이어링을 이용한 군사용 소프트웨어 초기단계 개발비용 산정 기법)

  • Lee Byong-Eun;Kang Sung-Jin
    • The KIPS Transactions:PartD
    • /
    • v.12D no.5 s.101
    • /
    • pp.737-744
    • /
    • 2005
  • As the portion of software cost in construction of the system related to the national defence is getting higher, the required accuracy of cost estimation on defense software in development is also getting higher. The PRICE S is used to estimate the software cost at the first stage in the development of software promptly. However, the PRICE S is appropriate for the American environment not for the Korean circumstances. Thus, we will present a method to compensate the PRICE S with comparing with the model of Korea Software Industry Association. Moreover, we also present another method to estimate software cost based on function point with backfiring approach, which will be used for the software projects planned. Finally, we expect that our works will provide a solution for applying the function point in the future and will increase the accuracy of cost estimation in software development.

The Economic Costs of Newly Diagnosed Lyme Disease (Lyme질환의 경제적 비용분석)

  • Pauly, M. V.;;Madaglia, M.
    • Health Policy and Management
    • /
    • v.4 no.2
    • /
    • pp.126-147
    • /
    • 1994
  • Lyme 질환은 미국 코넷티컷주의 라임지방에서 관절염증상을 보이는 소아과환자에게서 1975년 처음 발견되었다, 사슴, 누루, 개 등에 기생하는 진드기에 의해 전염되며, 발병초기에는 감기증상을 수반한 황소의 눈과 비슷한 붉은 반점이 생긴다. 적기에 치료하지 않으면, 관절염, 심장질환, 안면신경마비 등으로 악화될 수 있다. 본 논문의 목적은 두가지로 나누어 볼 수 있다. 먼저, 진단초기의 Lyme질환과 관련된 의료 및 기타 경제적 비용을 저렴하게 계측할 수 있는 방법론을 개발하고 그 유효성을 검증하는 것이다. 둘째로 lyme질환의 비용에 대한 여러종류의 총괄적 계측치를 제공하고 발병의 위험요인을 색출하는 것이다. 본 논문에서는 차트분석이나 임상연구 등 고가의 비용이 수반되는 분석기법 대신에 Lyme질환 다발지역에 대한 설문조사를 실시하고 그 유효성을 재설문조사를 통해서 검증하는 방법을 사용하였다. 자료분석상의 난점은 조사대상자마다 응답하지 않은 항목(Missing Value)이 다르기 때문에, 총 비용을 계산할 때 모든 항목에 응답한 조사대상자만을 사용한다면 표본의 크기가 너무 작아지는 것이었다. 이에 대한 대안으로 총비용 및 부분별 비용의 합을 계산할 때 표본의 일부가 응답하지 않은 항목에 대해서는 그 항목에 응답한 나머지 조사대상자의 응답치 평균을 대체하는 방법을 사용하였다. 통계적 분석결과, 질환의 증상시작부터 설문조사시기까지 Lyme질환과 관련된 사회적 총비용은 US$ 6400으로 추정되었다. 이중에 200가량은 환자의 보호자와 관련된 비용이고 나머지는 환자와 관련되 것이다. 총의료비용의 평균은 계산방법에 따라서 US$ 3000-4200의 범위를 보였다. 응답되지 않은 항목을 해당항목에 대한 응답치평균으로 대체하였을 때 총의료비평균은 US$ 4108이었다. 시간비용을 생산성손실에 대한 사회적 가치와 실제임금 손실의 두가지 방법에 의해 계산되었다. 실제임금손실은 생산손실의 사회적 가치의 약 30%에 불과하였다. 본 논문의 결과는 의료비용 및 비용과 생산성손실에 대한 정보가 지역보건담당자에 의한 전화설문조사에 의해 경제적이고도 일관성 있게 수집될 수 있다는 근거로 해석될 수 있다.

  • PDF

Guide Filter based Cost Optimization Method for Accurate Depth Map Generation (정확한 깊이지도 생성을 위한 가이드 필터기반 비용 최적화 방법)

  • Mun, Ji-Hun;Ho, Yo-Sung
    • Proceedings of the Korean Society of Broadcast Engineers Conference
    • /
    • 2016.06a
    • /
    • pp.1-4
    • /
    • 2016
  • 효율적으로 깊이지도를 획득하기 위해 다양한 방법의 지역 기반스테레오 매칭 방법이 사용된다. 일반적인 지역기반 스테레오 매칭에 사용되는 비용값 계산 방법을 통해 깊이지도를 생성하게 되면 객체의 경계 영역이 무너지거나, 유사한 텍스쳐 정보가 연속적으로 나타나는 영역에서 부정확한 깊이값을 얻는 문제가 발생한다. 본 논문에서는 깊이지도의 정확성을 높이기 위해 2가지 단계를 거쳐 최종 깊이지도를 생성한다. 처음으로, 일반적으로 사용하는 지역기반 스테레오 매칭 비용 함수와 입력 영상의 기울기를 고려한 초기 비용값을 가이드 필터를 이용하여 최적의 비용값을 찾아 초기 변위지도를 생성한다. 스테레오매칭을 수행할 경우, 시점의 차이로 인해 보이지 않는 영역에서 정확한 변위값을 찾지 못하는 문제가 발생한다. 이러한 문제를 해결하기 위해 좌영상과 우영상을 기반으로 획득한 변위지도를 사용하여 교차검사를 함으로써 폐색영역을 찾아낸다. 폐색 영역을 이웃한 화소의 값을 사용하여 채울 경우 실선과 같은 오류가 결과 영상에 나타나게 된다. 이러한 오류 영역을 제거하기 위해 마지막으로 가중치를 적용한 중간값 필터를 적용한다. 실험 결과 제안한 방법을 사용하여 획득한 깊이지도가 기존의 방법보다 정확한 깊이값을 얻는 것을 확인할 수 있었다.

  • PDF

Analysis of the Work and Cost of Supervisor in the Public Construction Corporation (공공발주처의 공사감독 업무영역과 비용 분석)

  • Cho Seong-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.146-152
    • /
    • 2003
  • In the construction project, construction supervisor influences greatly the construction managements such as process management, quality management, safety management, and cost management. Therefore, from the first stage of the project, the managing activities of the supervisor are consistently needed. But the assesment of supervisor's work and cost has not been made enough in the public construction project. And there have been doubts as to whether a supervisor can take a consistent managing activity from the early stage of the project. Accordingly, the works between Korean supervisor and foreign supervisor in their public corporations are analyzed and compared in this paper. And the evaluation is made each of the cost for supervisor and the cost for engineer as a substitute of supervisor in construction project. This study is believed to contribute to improving the supervisor's work and reducing the personnel expenses and construction indirect cost.

A Study on the Optical Image Method in the Extraction of Surface Cover Information for Hydrologic Analysis (수문해석(水文解析)을 위한 지표정보(地表情報) 추출(抽出)의 광학(光學) 이미지법(法)에 관한 연구(硏究))

  • Yang, In Tae;Chun, Byung Dog
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.10 no.3
    • /
    • pp.77-85
    • /
    • 1990
  • This report is a study concerning the classification of the surface cover data applying the data of LANDSAT TM (Thematic Mapper). The purpose of this study was to reduce the cost of use for LANDSAT data and increase the accuracy of land cover classification. Especially, a using mehtod adopted in this paper was a unique optical method using OHP(Over Head Projector). It was found that a unique optical method can have significant effects upon the responses according to the present results in this study.

  • PDF