• Title/Summary/Keyword: 초기강우 유출수

Search Result 210, Processing Time 0.024 seconds

Removal Efficiency of Non-point Source Pollutants through Constructed Wetland: Case Study of Annaecheon Wetland in Daecheong Reservoir (인공습지를 이용한 호소 유입 비점오염물질 제거 효율 평가: 대청호 안내천 습지 사례 분석)

  • Pyeol-Nim Park;Young-Cheol Cho
    • Journal of Environmental Impact Assessment
    • /
    • v.32 no.5
    • /
    • pp.291-304
    • /
    • 2023
  • Harmful algal blooms (HABs) have become an increasing concern in terms of human health risks as well as aesthetic impairment due to their toxicity. The reduction of water pollutants, especially nutrients from non-point sources in a reservoir watershed, is fundamental for HABs prevention. We investigated the pollutant removal efficiencies of a constructed wetland to evaluate its feasibility as a method for controlling non-point sources located in the Annaecheon stream within the Daecheong Reservoir watershed. The overall removal efficiencies of pollutants were as follows: BOD 14.3%, COD 17.9%, SS 50.0%, T-N 19.0%, and T-P 35.4%. These results indicate that constructed wetlands are effective in controlling pollutants from non-point sources. The seasonal variation in removal efficiency depended on the specific pollutants. The removal efficiencies of BOD, COD, and T-N were stable throughout the year, except during winter, which might have been influenced by lower microorganism activity. In contrast, T-P showed a consistent removal efficiency even during the winter season, suggesting that the wetland can reduce external phosphorus loading to the reservoir. Regarding the effects of pollutant loadings on removal efficiency, the effluent concentrations of all pollutants were significantly decreased compared to those in the influent in case of middle and high loadings. This demonstrates that constructed wetlands can handle high pollutant loads, including the initial runoff during rainfall, to prevent reservoir eutrophication. Despite the various strengths of wetland water purification, there are limitations as passive treatment. Therefore, more case studies should be conducted to suggest optimum operational conditions for constructed wetlands, taking into consideration reservoir-specific characteristics.

Determination of EMC and MFFn Rainfall Runoff in Songcheon, Doam Lake Watershed (도암호 유역 송천에서의 강우유출수 분석을 통한 EMC와 초기세척비율 (MFFn) 산정)

  • Kwon, Hyeokjoon;Kim, Jonggun;Lim, Kyoungjae;Kim, Dongjin;Hong, Eunmi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.62 no.4
    • /
    • pp.13-22
    • /
    • 2020
  • The Doam Lake watershed has a significant impact on the downstream water system due to nutrients and sediment outflow during rainfall caused by steep slopes, soil losses, and fertilization. These non-point sources are unclear in the discharge area and are affected by land use patterns, soil characteristics, and topographical features of the watershed. Therefore, this study conducted rainfall monitoring from July to October 2019 in Songcheon upstream of the Doam Lake watershed, one of the non-point pollution source management areas. Then, after analyzing rainfall runoff, Event Mean Concentration (EMC) and Mass First Flush ratio (MFFn) were calculated to compare and analyze the characteristics of rainfall and the non-point pollutant discharge. As a result of the analysis, it showed various non-point pollutant emission characteristics for each rainfall event. In addition, the concentration of EMC and the MFFn were affected by the average rainfall intensity and the maximum rainfall intensity, and were not significantly affected by the number of antecedent drying days. In the future, it is expected that effective non-point source reduction measures and management measures according to rainfall intensity through continuous monitoring and analysis will be needed.

Evaluation of Basic Unit for Non-point Pollutants in Runoff of West Coast Highway - Maesong Area (서해안 고속도로 매송지역 비점오염원 원단위 산정 연구)

  • Park, Seyong;Mo, Kyung;Kim, Leehyung;Kang, Heeman;Kim, Moonil
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.8
    • /
    • pp.33-40
    • /
    • 2010
  • In this study, evaluation of basic unit of non-point pollutant, which is fundamental evaluation of non-point loading, was conducted using both road point and angle of intersection point in Maesong area, West coast highway by utilizing Event Mean Concentrations(EMC). Concentration of pollutants except heavy metals at these two points rapidly decreased in 30 minutes after start of runoff. According to the results of EMC, for both sampling points, it was determined that the concentrations of TSS(Total Suspended Solid), $BOD_5$(Biological Oxygen Demand), and DOC(Dissolved Organic Carbon) were higher than those of wastewater effluent standard in Korea, however, the concentrations of T-N(Total Nitrogen) and T-P(Total Phosphorus) were lower than those of the standard. In terms of heavy metals, Fe, Pb, and Zn showed higher concentrations than others. When compared with the units established by the Ministry of Environment in Korea, the basic units of $BOD_5$ and T-N in this study were lower. On the other hand, when compared with foreign units, Cu, Pb, and Zn showed approximately 10 times higher concentrations. It was estimated that a long term monitoring should be conducted for obtaining additional data and more reliable basic units for the non-point pollutnats based on the results from this study.

Autotrophic Nitrite Denitrification Using Sulfur Particles for Treatment of Wastewaters with Low C/N Ratios (Batch Tests) (C/N비가 낮은 하.폐수에서 황입자를 이용한 아질산성질소 탈질 연구(회분식 실험))

  • Yoon, Seung-Joon;Kang, Woo-Chang;Bae, Woo-Keun;Oh, Sang-Eun
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.32 no.9
    • /
    • pp.851-856
    • /
    • 2010
  • A sulfur utilizing nitrite denitrification process could be placed after the shortcut biological nitrogen removal (SBNR) process. In this study, removal of nitrite using sulfur oxidizing denitrifier was characterized in batch tests with granular elemental sulfur as an electron donor and nitrite as an electro acceptor. At sufficient alkalinity, initial nitrite nitrogen concentration of 100 mg/L was almost completely reduced in the batch reactor within a incubation time of 22 h. Sulfate production with nitrite was 4.8 g ${SO_4}^{2-}/g$ ${NO_2}^-$-N, while with nitrate 13.5 g ${SO_4}^{2-}/g$ ${NO_3}^-$-N. Under the conditions of low alkalinity, nitrite removal was over 95% but 15 h of a lag phase was shown. For nitrate with low alkalinity, no denitrification occurred. Sulfate production was 2.6 g ${SO_4}^{2-}/g$ ${NO_2}^-$-N and alkalinity consumption was 1.2 g $CaCO_3/g$ ${NO_2}^-$. The concentration range of organics used in this experiment did not inhibit autotrophic denitrification at both low and high alkalinity. This kind of method may solve the problems of autotrophic nitrate denitrification, i.e. high sulfate production and alkalinity deficiency, to some extent.

Hydraulic Stability Examination of Rainwater Reservoir Pipe Network System on Various Inflow Conditions (유입량 변화에 따른 도심지 내 우수저류조 관망시스템의 안정성 검토)

  • Yoo, Hyung Ju;Kim, Dong Hyun;Maeng, Seung Jin;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.12 no.4
    • /
    • pp.1-13
    • /
    • 2019
  • Recently, as the occurrence frequency of sudden floods due to climate change increased, it is necessary to install the facilities that can cope with the initial stormwater. Most researches have been conducted on the design of facilities applying the Low Impact Development (LID) and the reduction effect on rainfall runoff to examine with 1D or 2D numerical models. However, the studies on the examination about flow characteristics and stability of pipe network systems were relatively insufficient in the literature. In this study, the stability of the pipe network system in rainwater storage tank was examined by using 3D numerical model, FLOW-3D. The changes of velocity and dynamic pressure were examined according to the number of rainwater storage tank and compared with the design criteria to derive the optimal design plan for a rainwater storage tank. As a results of numerical simulation with the design values in the previous study, it was confirmed that the velocity became increased as the number of rainwater storage tank increased. And magnitude of the velocity in pipes was formed within the design criteria. However, the velocity in the additional rainwater storage pipe was about 3.44 m/s exceeding the allowable range of the design criteria, when three or more additional rainwater storage tanks were installed. In the case of turbulence intensity and bottom shear stress, the bottom shear stress was larger than the critical shear stress as the additional rainwater storage was increased. So, the deposition of sediment was unlikely to occur, but it should be considered that the floc was formed by the reduction of the turbulence intensity. In addition, the dynamic pressure was also satisfied with the design criteria when the results were compared with the allowable internal pressure of the pipes generally used in the design of rainwater storage tank. Based on these results, it was suitable to install up to two additional rainwater storage tanks because the drainage becomes well when increasing of the number of storage tank and the velocity in the pipe becomes faster to be vulnerable to damage the pipe. However, this study has a assumption about the specifications of the rainwater storage tanks and the inflow of stormwater and has a limitation such that deriving the suitable rainwater storage tank design by simply adding the storage tank. Therefore, the various storage tank types and stormwater inflow scenarios will be asked to derive more efficient design plans in the future.

Application of Reduce Tillage with a Strip Tiller and its Effect on Soil Erosion Reduction in Chinese Cabbage Cultivation (배추 재배에 있어 경운방법에 따른 작업효율성 및 토양유실 특성 평가)

  • Lee, Jeong-Tae;Lee, Gye-Jun;Ryu, Jong-Soo;Hwang, Seon-Woong;Park, Suk-Hoo;Zhang, Yong-Seon;Jeong, Yeong-Sang
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.44 no.6
    • /
    • pp.970-976
    • /
    • 2011
  • Strip tiller equipment was developed to reduce soil erosion in the slope land for highland agricultural area. The equipment consisted of 4 rows strip tillage device and fertilizer applicator. The field was tilled in 10 cm width and in 10 cm depth by the equipment, of which tilled surface was 16.7% of full-width tillage. The working time and fuel consumption of the equipment were $3.8hours\;ha^{-1}$ and $24.4L\;ha^{-1}$ respectively, which were 59% and 74% less than those of the conventional tillage. Fertilizer efficiency of the equipment in cultivation of Chinese cabbage was 1.7, 1.6 and 1.5 times higher in nitrate, phosphorous and potassium respectively, than conventional tillage. When the equipment was used after covering of rye residue, the quantity of runoff was 49~67% lower than the conventional tillage. And the quantity of soil loss were 1.3 and $0.2Mg\;ha^{-1}$ at right after and 30 days after planting of Chinese cabbage respectively, while 11.5 and $4.1Mg\;ha^{-1}$ in conventional tillage. In conclusion, the strip tillage equipment developed in this study can be applicable to slope land, so that soil loss of 90% can be reduced.

A Prediction Model for Removal of Non-point Source Pollutant Considering Clogging Effect of Sand Filter Layers for Rainwater Recycling (빗물 재활용을 위한 모래 정화층의 폐색특성을 고려한 비점오염원 제거 예측 모델 연구)

  • Ahn, Jaeyoon;Lee, Dongseop;Han, Shinin;Jung, Youngwook;Choi, Hangseok
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.6
    • /
    • pp.23-39
    • /
    • 2014
  • An artificial rainwater reservoir installed in urban areas for recycling rainwater is an eco-friendly facility for reducing storm water effluence. However, in order to recycle the rainwater directly, the artificial rainwater reservoir requires an auxiliary system that can remove non-point source pollutants included in the initial rainfall of urban area. Therefore, the conventional soil filtration technology is adopted to capture non-point source pollutants in an economical and efficient way in the purification system of artificial rainwater reservoirs. In order to satisfy such a demand, clogging characteristics of the sand filter layers with different grain-size distributions were studied with real non-point source pollutants. For this, a series of lab-scale chamber tests were conducted to make a prediction model for removal of non-point source pollutants, based on the clogging theory. The laboratory chamber experiments were carried out by permeating two types of artificially contaminated water through five different types of sand filter layers with different grain-size distributions. The two artificial contaminated waters were made by fine marine-clay particles and real non-point source pollutants collected from motorcar roads of Seoul, Korea. In the laboratory chamber experiments, the concentrations of the artificial contaminated water were measured in terms of TSS (Total Suspended Solids) and COD (Chemical Oxygen Demand) and compared with each other to evaluate the performance of sand filter layers. In addition, the accumulated weight of pollutant particles clogged in the sand filter layers was estimated. This paper suggests a prediction model for removal of non-point source pollutants with theoretical consideration of the physical characteristics such as the grain-size distribution and composition, and change in the hydraulic conductivity and porosity of sand filter layers. The lumped parameter ${\theta}$ related with the clogging property was estimated by comparing the accumulated weight of pollutant particles obtained from the laboratory chamber experiments and calculated from the prediction model based on the clogging theory. It is found that the lumped parameter ${\theta}$ has a significant influence on the amount of the pollutant particles clogged in the pores of sand filter layers. In conclusion, according to the clogging prediction model, a double-sand-filter layer consisting of two separate layers: the upper sand-filter layer with the effective particle size of 1.49 mm and the lower sand-filter layer with the effective particle size of 0.93 mm, is proposed as the optimum system for removing non-point source pollutants in the field-sized artificial rainwater reservoir.

A Study on the Relation Characteristics between Bubble Size Distribution and Floating Time (버블의 크기별 입도분포와 부상시간과의 상관특성에 관한 연구)

  • Jeon, Gun;Park, Chul-Hwi
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.39 no.5
    • /
    • pp.277-281
    • /
    • 2017
  • Lately rainfall characteristics that it rains a lot in a short space of time often occurs. Because of this meteorological phenomena, the flow rate and concentration of initial rainfall for runoff and combined sewer overflows are changed. In the case of this inlet fluctuation, the flotation method at high surface loading rate is suitable for water quality management. the flotation method is able to meet the removal rate requirements of water public zone in 5 to 10 min which is irelatively short period. For assessment and diagonision of flotation method, A/S ratio is applied until now. But unfortunately, this has some limits for evaluation standard for certification and assessment of technical diagnosis and operation. This is why there is different efficiency in the bubble distribution at the same A/S ratio. The velocity and time of floating is changed by the different bubble distributions. The floating time affects the plant volume because the time factor make size dicision. Therefore the charateristics of bubble distribution and floating time at the same A/S ratio is necessary to apply to evaluation standard for certification and assessment of technical diagnosis and operation. For generalization of the method in certification and assessment, the characteristics of bubble distribution was studied. Until recently, using the optical device and shooting live video, there are some analysis technology of the floating factors. But this kind of technology is influenced by the equipment. with this level of confidence about the results, it is difficult to apply to generalize. According this reasons, this study should be applied on experiment generalization of method about measurement of relation between bubble distribution and floating time.

Determination of Optimal Operation Water Level of Rain Water Pump Station using Optimization Technique (최적화 기법을 이용한 빗물펌프장 최적 운영수위 결정)

  • Sim, Kyu-Bum;Yoo, Do-Guen;Kim, Eung-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.7
    • /
    • pp.337-342
    • /
    • 2018
  • A rain water pumping station is a structural countermeasure to inland flooding of domestic water generated in a urban watershed. In this study, the optimal operation water level of the pump with the minimum overflow was determined based on the opinions of the person in charge of the operation of the rain water pump station. A GA (Genetic Algorithm), which is an optimization technique, was used to estimate the optimal operation water level of the rain water pump station and was linked with SWMM (Ver.5.1) DLL, which is a rainfall-runoff model of an urban watershed. Considering the time required to maximize the efficiency of the pump, the optimal operating water level was estimated. As a result, the overall water level decreased at a lower operating water level than the existing water level. For most pumps, the lowest operating water level was selected for the operating range of each pump unit. The operation of the initial pump could reduce the amount of overflow, and there was no change in the overflow reduction, even after changing the operation condition of the pump. Internal water flooding reduction was calculated to be 1%~2%, and the overflow occurring in the downstream area was reduced. The operating point of the pump was judged to be an effective operation from a mechanical and practical point of view. A consideration of the operating conditions of the pump in future, will be helpful for improving the efficiency of the pump and to reducing inland flooding.

Estimation of Optimal Size of the Treatment Facility for Nonpoint Source Pollution due to Watershed Development (비점오염원의 정량화방안에 따른 적정 설계용량결정)

  • Kim, Jin-Kwan
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.149-153
    • /
    • 2008
  • The pollutant capacity occurred before and after the development of a watershed should be quantitatively estimated and controlled for the minimization of water contamination. The Ministry of Environment suggested a guideline for the legal management of nonpoint source from 2006. However, the rational method for the determination of treatment capacity from nonpoint source proposed in the guideline has the problem in the field application because it does not reflect the project based cases and overestimates the pollutant load to be reduced. So, we perform the standard rainfall analysis by analytical probabilistic method for the estimation of an additional pollutant load occurred by a project and suggest a methodology for the estimation of contaminant capacity instead of a simple rational method. The suggested methodology in this study could determine the reasonable capacity and efficiency of a treatment facility through the estimation of pollutant load from nonpoint source and from this we can manage the watershed appropriately. We applied a suggested methodology to the projects of housing land development and a dam construction in the watersheds. When we determine the treatment capacity by a rational method without consideration of the types of projects we should treat the 90% of pollutant capacity occurred by the development and to do so, about 30% of the total cost for the development should be invested for the treatment facility. This requires too big cost and is not realistic. If we use the suggested method the target pollutant capacity to be reduced will be 10 to 30% of the capacity occurred by the development and about 5 to 10% of the total cost can be used. The control of nonpoint source must be performed for the water resources management. However it is not possible to treat the 90% of pollutant load occurred by the development. The proper pollutant capacity from nonpoint source should be estimated and controlled based on various project types and in reality, this is very important for the watershed management. Therefore the results of this study might be more reasonable than the rational method proposed in the Ministry of Environment.