• Title/Summary/Keyword: 철도안전관리

Search Result 275, Processing Time 0.023 seconds

A Study on the Database basic structure of Accident Data Management for the Purpose of Railway Safety Management (철도안전관리를 위한 사고자료관리 D/B구조에 관한 기초연구)

  • Hong Seon Ho;Wang Jong Bae;Kwak Sang Log;Lee Yoo Jun
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.241-246
    • /
    • 2003
  • In this paper, necessity and application scope of the risk-analysis D/B which assesses the railway safety condition has been introduced. In addition, normalization of analysis work, which is one of the DB development procedures has been conducted. And the structure of accident data management has been introduced through the analysis on the classification scheme used in Korea. Also the improvement of railway accident classification and management scheme which is necessary to accident risk assesment has been presented by these procedures.

  • PDF

A Study on the Way of Purchasing Cost Reduction through Streamlining Procurement Tasks: Focusing on Rolling Stock and Components (구매 업무 효율화를 통한 구매비용 절감 방안에 관한 연구: 철도차량 및 차량용품을 중심으로)

  • Lee, Sun-Kwan;Shin, Tack-Hyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.4
    • /
    • pp.557-564
    • /
    • 2009
  • This study compared KORAIL's procurement tasks with that of other companies. after analyzing the institutional and operational problems in procurement tasks especially in the respect of rolling stock and components which are KORAIL's major purchasing items, this study presented the way of purchasing cost Reduction through improving and streamlining procurement tasks.

Cases of applying battery to rolling stock (철도차량용 축전지 적용 사례)

  • Kim, Sang-Woong;Kim, Shin-Gug;Ahn, Hong-Kwan;Kim, Jea-Gi
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.413-422
    • /
    • 2011
  • A battery is an important part of the component, as a power source of the control of rolling stock at starting movement or emergency control. Now widely used batteries are Ni-Cd batteries and lead accumulators, and these are increasingly getting smaller and lighter. In addition, the electric capacity required is increasing, due to the development of electronic control technology of rolling stock. Therefore, various kinds of high-efficiency battery are considered for the new routes' rolling stock, but rolling stock's batteries should be fully tested to prove safety and also have no difficulty in terms of management, so because of the requirement, it is difficult to be in practical application. In this paper, we will survey cases of applying battery to rolling stock and then we will review whether there is any problem about safety and performance, management to discuss future trend of batteries.

  • PDF

A Suggestion of Blasting Patterns of a Mine closed to Railway Line for Securing Safety of High Speed Train (고속철도 안전확보를 위한 노선 인접 광산의 발파패턴 제안)

  • Kim, Hyun-Ki;Lee, Sung-Hyeok;Lee, Jin-Wook;Choi, Chan-Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.5
    • /
    • pp.1-9
    • /
    • 2015
  • Recently Honam high-speed railroad line is constructed in southern part of Korea. This line is for next generation HST named HEMU-430X. But there is a limestone mine near this line and this mine will make a process to dig a passageway under the railway line. In this case, safety of railroad system and stability of mine are crucial problems on both sides. By measuring mine blasting vibration and calculating regression equation, effect of mine blasting to train running is investigated quantitatively. 0.5 kine (cm/sec) is applied as a management specification of vibration based on field measurement. In this study, changes of blasting patterns are suggested to control vibration of mine blasting. And the effect of train vibration to mine is also invesitigated by numerical analysis.

A Study on the Establishment and Application of Evaluation Criteria for Old Railway Station Considering the Level of Railway Service (철도 서비스수준을 고려한 노후철도역사 평가기준 마련 및 적용방안)

  • Kim, Kyung Ho;Kim, Si Gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.44 no.1
    • /
    • pp.101-108
    • /
    • 2024
  • The total number of railroad stations managed in Korea is 322 (including general and wide-area railways), and a considerable number of stations are aging. In terms of the size of the existing railway station and the number of entrances, it has not been possible to secure adequate service capacity, and the demand for station improvement is increasing due to changes in surrounding conditions such as urban development. In the past, railroad stations were focused on the simple function of a connection passage in terms of maintenance or management, but in recent years, railroad stations are also changing to an atmosphere that they should be reborn as a user-centered comfortable, convenient, and safe service provision space. In this study, a case study related to the improvement of the old railway station was conducted to derive an improvement plan that meets the improvement standard of the old station, and the service level evaluation standard was developed. By introducing the concept of service level (LOS) in the development model, station congestion, station movement convenience, and station safety were selected as evaluation indicators. In addition, this development model applied an analytical stratification technique to divide various evaluation elements of each indicator into major and detailed elements and derive the relative importance of the elements by class. Priority for improvement was derived using the ratio of the number of E and F on the LOS for each facility. Based on this study, it is expected to be helpful in using it as an evaluation criterion for improving objective and equitable railway station.

A Study on Informative ATS (Automatic Train Stop) for Speed Improvement and Increment of Track Capacity on Existing Line (기존선 속도향상과 선로용량 증대를 위한 정보형 ATS 차상장치 개량)

  • Seo Jung-Wook;An Su-Kwan;Kim Bong-Taek
    • Proceedings of the KSR Conference
    • /
    • 2003.05a
    • /
    • pp.456-461
    • /
    • 2003
  • 기존선 속도 향상 및 병목현상 해소와 안전운행을 위해 국내 철도 현황의 주요 분야를 검토한 후, 국내 17년동안 사용으로 안전성이 검증된 신호기술을 바탕으로 국내 실정에 적합하며, 기존의 ATS 장치를 개선한 정보형 ATS(ATPS)를 개발하여 이를 제시하였다. 본 시스템은 운행 중인 열차의 제동특성을 고려하여 구간별 제한속도를 상향 조정하여 운행 효율을 증가 시킬 수 있다. 또, 안전성과 신뢰성 보장을 위해 Fail-Safe 및 이중계(redundancy)로 제작 하였고, 기존의 차상자와 발진기를 통합함으로써 Q factor를 개선하여 무응동 방지 및 기준 응동시간 비교방식을 통해 오동작을 개선하였다. 그리고, 정보기록 장치를 추가함으로써 이미 기록되어있는 차량정보데이터와 지상정보데이터를 연산하여 운전정보를 제공하고 기록한다. 또한, 이 운전정보는 정보 분석용 PC 및 프로그램에 의해 쉽게 분석, 관리가 가능하다. 무엇보다도 기존 ATS 구간과의 겸용사용으로 영업 운전시 안전한 연속 운행 보장 및 지상설비 개량 없이 안전을 확보할 수 있다. 다양한 종류의 동력차에 설치, 인터페이스 및 지상설비 개량이 용이하다. 향후 틸팅 시스템과 연계하여 틸팅 제어/감시 신호를 제공하는 기능을 갖는다.

  • PDF

Reliability-Optimal Design Method of High-Speed Railway Bridges Based upon Expected Life-Cycle Cost (기대생애주기비용에 기초한 고속철도교량의 신뢰성-최적설계 방안)

  • Lee, Woo-Sang;Bang, Myung-Seok;Han, Sung-Ho;Lee, Chin-Ok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.4
    • /
    • pp.102-110
    • /
    • 2010
  • The reliability evaluation may be a efficient method for estimating of the quantitative structural safety considering the effect of uncertainties included in high-speed railway bridges. The expected life-cycle cost(LCC) based upon the reliability evaluation will reasonably offer the safety level and design criteria of high-speed railway bridges. Therefore, this study determined the expected life-cycle cost and optimal design method of high-speed railway bridges on the basis of the result of the numerical analysis and reliability evaluation. For this, after creating various design method based upon the standard design of high-speed railway bridges, the numerical analysis is conducted on each of the alternative design methods. The reliability evaluation by the design strength limit state function is conducted considering the effect of external uncertainties on the basis of the numerical analysis result. The expected life-cycle cost of high-speed railway bridges is calculated on the basis of the reliability evaluation result by each of the alternative design methods. Also, the optimal design method is determined using the calculated expected life-cycle cost. In addition, The result of reliability evaluation and expected life-cycle cost of optimal design method are examined considering the effect of internal uncertainties. It is expected that the result of this study can be used as a basic information for the systematic safety evaluation and optimal structure design of high-speed railway bridges.

Comparative Study of Foreign Countries on Management Rules on Rail Defects (각국의 레일결함 관리 기준 비교)

  • Yun, Kyung Min;Song, Myeong Gyu;Lee, Chin Ok;Lim, Nam Hyoung
    • 한국방재학회:학술대회논문집
    • /
    • 2011.02a
    • /
    • pp.184-184
    • /
    • 2011
  • 선로의 레일은 재료적인 특성과 현장의 많은 주변 요소에 의한 불확실성이 매우 높은 시스템으로 결함의 위험이 상존한다. 결함 발생과 조치에 따라 영업손실로 이어지므로 레일 결함 발생과 동시에 적절한 조치가 요구된다. 따라서 레일결함 발생 시 레일교환시기를 파악하는 것이 선로관리비용을 줄일 수 있으며 레일교환에 대한 신속한 판단을 위함 관리기준을 정립하는 것이 요구된다. 현재 국내에서 고속선의 경우 관리 기준이 있으나, 일반철도는 없는 실정이다. 본 연구는 차후 일반철도 180km/h 속도상승을 계획하고 있는 현 시점에 국외 관리기준을 분석하여 결함관리기준을 정립에 기여하고자 한다. 국내의 경우, 2004. 4. 1 프랑스 기술을 전수받아 개통한 고속선은 프랑스 레일관리기준을 적용한 "레일손상 등급별 관리기준"을 제정하여 레일관리를 시행하고 있다. 국외의 경우, INNOTRACK프로젝트 안에서 관련된 다른 IM(Infrastructure Managers, 사회기반시설 관리자들)에게 최근의 활동과 변화의 이해를 제공하기 위해서, 선택된 결함들의 최소조치들의 조사가 Network Rail, OBB, Prorail, Banverket 그리고 DB에서 수행되고 있으며 UIC 지침에도 포함되고 있다. 모든 최소조치 원칙은 초음파나 육안에 의해 발견된 길이나 초음파 또는 와류탐상기(eddy current system)를 이용한 깊이에 대한 제한(limits)을 준다. 또한 침목과 이음매 또는 용접부에 관한 위치에 관한 결함의 제한이 있다. 명시된 기간은 즉각적일 수도 있으며, 보통 속도 제한이나 비상 죔쇠(Clamps)같은 경감시키는 수단에 적용될 수 있으며, 또는 더 긴 기간이 될 수도 있다. 더 긴 기간들은 수리나 레일 교체를 통하여 선로로부터 결함이 제거되어야 하는 최대의 시간이다. 본 연구에서는 Transverse Breaks, Squats, Head Checks 3가지 결함 유형에 대해 각 국에서 사용하는 최소 조치를 비교하여 분석하였다. 분석결과, 유럽에서는 레일결함에 대하여 깊이 있는 연구를 통하여 관리기준을 정하여 관리하고 있으며 이에 따라 상세하고 구체적인 레일 관리가 가능하므로 효율적이며 안전성이 제고되는 것으로 판단된다. 차후 일반철도의 180km/h 속도상승을 계획하고 있는 현 시점에서 국내철도 일반선 여건에 적합한 레일결함관리기준을 정립하기 위한 추가적인 연구가 필요할 것으로 판단된다.

  • PDF

현장계측결과에 기초한 노후 강트러스 철도교의 피로수명 평가

  • 채원규;민인기;홍성욱
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.10a
    • /
    • pp.384-390
    • /
    • 2003
  • 현재 우리나라에서 공용중인 강철도교의 50% 이상이 공용기간 50년 이상 경과된 교량으로 구성되어 있지만 실교량에서 각 부재별 실측자료의 축적이 미흡한 실정이어서 유지관리시 구조물의 특성을 충분하게 반영하는 정량적인 평가가 체계적으로 이루어지고 있지 않은 실정이다.(중략)

  • PDF