• Title/Summary/Keyword: 철도시설

Search Result 515, Processing Time 0.026 seconds

The Analysis on Container Railroad Transit Capacity in Busan Port (부산항 컨테이너화물의 철송 능력 분석)

  • Hur, Yun-Su;Lee, Jae-Won
    • Journal of Navigation and Port Research
    • /
    • v.27 no.5
    • /
    • pp.585-591
    • /
    • 2003
  • Recently, South korea is driving forward the strategy concerning of the logistics center of northeast asia aggressively on the purpose of promoting Busan port & Gwangyang port to the hub-port of northeast asia, In that situation, it is significant that the meaning, construction connecting between south and north railway. Namely, That is the reason why Busan port is satisfied with the combined transport system of not only marine transportation but also railway transportation completely, However, the research and policy is only focused on the connection of north-south railway so far. The ability of Buans railway equipment as the actual role of origin-destination point of TKR(Trans Korean Railway), was not reviewed. Therefore, this research is shown the problem and reality of the railway transport concerning the centralization of Busan port, and the capacity of Busan port railway facility regarding the increase of future container quantity is reviewed and analyzed Moreover, the object, shown the importance of facility expansion such as Gungbu Trans Express between Daegu and Busan and the improvement scheme for railway transportation activation through the analysis of society cost and the logistics cost of the ability of railway facility, is set up.

A Study on Managing High-Speed Railway Links and Rolling Stocks Based on the Level of Service (서비스수준(LOS)을 감안한 고속철도 노선 및 차량관리방안)

  • Oh, Jae Kyoung;Kim, Si Gon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1025-1032
    • /
    • 2017
  • In this paper, the level of service (LOS) is defined for high-speed railway links and rolling stocks. Based on this LOS, how to manage high-speed railway facility is also suggested. The LOS is divided into 6 levels from A to F. The measurement of effectiveness (MOE) for railway links is derived from the relationship between a total delay time and a railway link utilization ratio. Another MOE, volume over capacity (V/C), is also proposed. On the other hand, the LOS for high-speed railway rolling stocks is based on the density of people in a rolling stock. Above all, LOS D is defined to the total number of seats. Then, LOS A is 50% of the LOS D, LOS B is 70% of the LOS D, LOS C is 90% of the LOS D and LOS D~F is defined as the maximum seats and standing people at the level of each. Finally, a method to manage high-speed railway links and rolling stocks is proposed in order to keep the level of service at the target by the government.

에너지절약을 위하여 ESCO사업에 운영관리를 포함하자 - BTL 사업화 시행에 대한 기대효과 -

  • An, Cheol-Lin
    • The Magazine for Energy Service Companies
    • /
    • s.58
    • /
    • pp.26-29
    • /
    • 2009
  • ESCO의 민간투자사업(BTL)이 확대되고 있다. 운영관리를 기본적으로 포함하는 민간투자사업 기본계획상의 민간투자 대상시설을 기존의 도로 철도 항만 등의 교통시설 위주에서 교육 문화 복지시설 등의 생활기반시설로까지 확대되었다. 민간의 창의와 경영기법을 활용함으로써 운영비절감 및 에너지효율 향상을 기대할 수 있는 BTL 사업화의 발전을 눈 여겨 볼 시점이다.

  • PDF

Planning and Construction of Drainage System in Railway (철도선로에서 배수시설의 설계 및 시공)

  • Shim, Jae-Bum;Chin, Byung-Hak
    • Proceedings of the KSR Conference
    • /
    • 2003.10b
    • /
    • pp.67-72
    • /
    • 2003
  • Drainage system in railroad has a very important role to operate the system. Drainage system should be carefully considered in design and construction due to a difficult access to the system during operation. In this paper, recent case histories were presented, which showed how an improper drainage system affects the railroad operation.

  • PDF

A Study on the Quantitative Risk Analysis in Railway Tunnels (철도터널 정량적 위험도 분석에 관한 연구)

  • Park, Kyung-Hoon;Yoo, Yong-Ho;Yoo, Ji-Oh
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 2011.11a
    • /
    • pp.502-505
    • /
    • 2011
  • 국내 철도터널 방재관련 법규에는 정량적 위험성 분석을 수행하여 주요한 방재시설의 설치 여부 및 규모를 결정하도록 규정하고 있으나 위험성 분석을 수행하기 위해 필요한 세부 기준에 대해서는 정해진 것이 없어 이에 대한 검토가 필요한 것으로 판단된다. 따라서 본 연구에서는 국내 철도터널의 정량적 위험도 평가 사례를 수집하고 이를 분석함으로서 철도터널 방재시설의 위험도 감소효과를 분석하고자 하였다. 정량적 위험도 평가사례분석 결과 Risk Index에 가장 크게 영향을 미치는 인자는 터널의 경사도로 분석되었으며, 방재설비 중 대피통로와 배연설비가 위험도 저감효과가 가장 높은 것으로 분석되었다.

  • PDF

The Optimal Design Method of the Train Repair Facility based on the Simulation (시뮬레이션을 이용한 철도 정비 시설의 최적 설계 방법)

  • Um, In-Sup;Cheon, Hyeon-Jae;Lee, Hong-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.3 s.40
    • /
    • pp.306-312
    • /
    • 2007
  • This paper presents the optimal design method of the train repair facility based on the simulation analysis. The train is divided into the power car, motorized car and passenger car for the simulation process analysis and train repair facility is composed of each subsystems such as a blast, dry and wash workshop. In simulation analysis, we consider the critical (dependent) factors and design (independent) factors for the optimal design. Therefore, a simulation optimization uses Evolution Strategy (ES) in order to find the optimal design factors. Experimental results indicate that simulation design factors are sufficient to satisfy the conditions of dependent variables. The proposed analysis method demonstrates that simulation design factors determined by the simulation optimization are appropriate for real design factors in a real situation and the accuracy and confidence for the simulation results are increased.

A draft of a safety criteria of railway signal based on the hazard analysis of railway accidents (철도사고 위험원 분석을 통한 철도신호안전기준(안) 작성)

  • Yoon, Yong-Ki;Hwang, Jong-Gyu;Lee, Jae-Ho;Kim, Yong-Gyu
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.2082-2083
    • /
    • 2007
  • 고속철도 운행, 도시철도 고밀도화, 무인자동운전의 경량전철 등 신교통시스템 도입 등 급변하는 철도환경에 따른 철도안전의 위험요인이 증가하고 있다. 국내 철도사고 사망자는 설비개량, 노후차량교체, 건널목입체화로 감소하고 있으나 10년을 주기로 대형참사가 발생하고 있으며, 철도관련 종사자의 안전의식이 낮은 수준이다. 이러한 대형참사의 발생을 방지하기 위하여 철도안전법이 제정되고 이의 효율적인 시행기반을 구축하기 위하여 철도시설안전체계 구축 및 기술분야별 안전기준을 개발하고 있다. 본 논문에서는 철도종합기술개발사업의 철도사고 위험요인분석(PHA : Preliminary Hazard Analysis)을 토대로 관계있는 위험원을 선정하였다. 또한 위험원에 의한 사고발생을 예방하기 위한 철도신호분야의 안전기준항목을 기술하였다.

  • PDF

IAT 시스템 구축을 위한 제안요청서 소개

  • 김몽룡
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.53-57
    • /
    • 2004
  • 인천국제공항공사에서 단계별 건설계획에 의거 추진하고 있는 2단계건설 공항시설공사 실시설계에 포함된 IAT 시스템구축사업을 위한 제안요청서 작성내용을 다음과 같이 소개하고자 한다.(중략)