• Title/Summary/Keyword: 철도건설공사

Search Result 191, Processing Time 0.03 seconds

A Study on Application of Smart Construction Safety Technology into Railway Construction (철도건설공사에 적합한 스마트 건설안전기술 적용방안에 대한 연구)

  • Sungwon Jung;Taekeun Oh
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.483-488
    • /
    • 2024
  • Railroad construction requires a lot of budget, manpower, and equipment, and as a result, many accidents occur. Although efforts are being made at the national level to reduce the accidents at railway construction sites, the occupational accident rate is not showing a downward trend. Various efforts are needed to reduce accidents, the application of smart construction safety technology will be effective. However, if smart construction safety technology is introduced indiscriminately without analysis, duplicate investment may occur, which may lead to a waste of budget for railway construction. In this regard, this study analyzes accident cases at railroad construction sites through a survey of stakeholders and proposes smart construction safety technologies to be effective for those accident types.

이슈 & 이슈 - "건설산업 공생발전의 지름길" 주계약자 공동도급

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.262
    • /
    • pp.38-47
    • /
    • 2012
  • 올해 1월 1일부터 기계설비의 겸업제한이 폐지되면서 주계약자공동도급제도가 기계설비에 적용되고 있다. 이에 따라 한국철도시설공단이 지난 4월 2일 총 700억원 대의 기계설비공사를 주계약자 공동도급으로 발주하였고 LH공사에서도 600여억원대의 기계설비공사를 주계약자 공동도급으로 발주할 예정이다. 이같은 성과는 대한설비건설협회가 지난해부터 건설산업 공생발전위원회를 비롯하여 국토해양부 장관과의 간담회, 국가기관 및 정부투자기관 등에 주계약자 공동도급을 기계설비공사에 적용하여 줄 것을 강력히 건의한 결과이다. 또한 서울특별시회를 비롯한 13개 전국 시 도회에서도 지방자치단체에 주계약자 공동도급이 적용될 수 있도록 적극 건의하고 있어 앞으로 국가공사와 지자체 공사에서 주계약자 공동도급이 활발히 발주될 전망이다. 지난 2009년 겸업제한이 폐지된 전문업종에 한하여 주계약자 공동도급이 도입된 이래 전문공사의 경우 3년 동안 총 1,100억원 대의 공사가 발주되었다. 그러나 기계설비공사는 대한설비건설협회의 부단한 노력에 힘입어 주계약자 공동도급이 적용된 지 4개월 만에 한국철도시설공단과 LH공사에서 6건의 공사에 총 1천300억원 대의 공사가 발주되는 성과를 거두었다. 이번 호에는 주계약자 공동도급에 대하여 자세히 알아본다.

  • PDF

태백선 함백 또아리굴의 애환 (철도 100주년 기념, 철도건설 야사)

  • 김형식
    • Journal of the Korean Society for Railway
    • /
    • v.2 no.2
    • /
    • pp.21-30
    • /
    • 1999
  • 우리 나라의 또아리 굴은 중앙선 금교~치악간 R=400m연장 1,975m가 일제시대 건설 운행되고 있었지만. 금번 함백 또아리 굴은 순수한 우리기술을 투입하여 현 운행선인 함백~조동간 35$\textperthousand$의 병목현상구간을 해소하기 위하여 함백~조동 간에 24$\textperthousand$ 연장 2.450m R=400의 또아리 굴을 시공하게 되었으며 '74년도에 착공이후 공사부진으로, 22일간의 연체료를 물고 있는 현장이었으며 전임공사조역이 개인사정으로 퇴직하고 후임으로 '75년 6월 2일 태백공사사무소 태백선 함백~조동간 2공구 공사조역 명을 받음으로 인연을 맺게 되었다. (중략)

  • PDF

교량용 건설기계의 운용 문제점

  • 최용호;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2002.11a
    • /
    • pp.185-190
    • /
    • 2002
  • 교량 공사는 우선 한강다리 건설공사만 해도 그간 많은 완성과 실패를 뉴스매체를 통해 보고 있다. 고속철도 공단주도의 경부고속철도 건설을 위한 교량은 수상, 육상 등 모든 부분에 적용되어 있다. 기존 교량에 대한 교통량 증가로 확장공사가 이루어지고 있기도 하다. 교량은 산업기반 시설이 되므로 규모가 크고 인력보다는 대형 건설기계가 소요된다 한국산업안전공단의 조사보고서(2002. 6)에 의하면 토목공사에서 18.7%의 사고율을 점하고 있고, 이중도로 9.9, 교량터널 1.1%을 점유하고 있다.(중략)

  • PDF

IAT 시스템 구축을 위한 제안요청서 소개

  • 김몽룡
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.2
    • /
    • pp.53-57
    • /
    • 2004
  • 인천국제공항공사에서 단계별 건설계획에 의거 추진하고 있는 2단계건설 공항시설공사 실시설계에 포함된 IAT 시스템구축사업을 위한 제안요청서 작성내용을 다음과 같이 소개하고자 한다.(중략)

Effective Analysis Framework for Construction Post Evaluation (건설공사 사후평가 수행결과의 효과적인 분석방법)

  • Kim, Tae Yeong;Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.1145-1152
    • /
    • 2016
  • A construction post evaluation is introduced to provide information that can be used for similar construction projects in the future through the evaluation of the efficiency of a public construction project and the verification of the appropriateness of the project results. However, it is not widely used due to a lack of awareness of the method. For this reason, the aim of this study is to provide a basic frame that can be utilized as a reference for a similar project in the future based on the construction post evaluation. More specifically, a more effective analysis method for the construction post evaluation is proposed and then an exemplary analysis is performed based on the method. The paper analyzes 293 cases stored in construction CALS. Construction cost growth rates of railway projects are tend to be greater than other project types like highway, expressway, and harbour. Then, construction schedule grwoth rates of expressway are greater than others. This is expected to provide useful information for a future project, and serve as a basic frame. Moreover, it is also meaningful that a project can be analyzed from different perspectives through the construction post evaluation.

A Study on the Advancement to establish for Surveying of Railway Construction (철도건설공사를 위한 측량에서의 고도화 정착에 관한 연구)

  • Moon, Jae-Woo;Kim, Young-Ha;Oh, Byung-Soo;Han, Chun-Deuk
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.1525-1532
    • /
    • 2010
  • Modern surveying techniques have been progressed to get the absolute position of a single coordinate system at any point on the earth with the advent of the Global Navigation Satellite System and One-stop digital equipment. In addition, as the speed of the railway has been increasingly faster, in determining the location of major facilities including the center of tracks, it is required to the sophisticated precision. The surveying of railway construction has applied the technical supports and procedures in accordance with the current requirements. In this study, the applicable guidelines of surveying on practical issues and alternatives would be examined, analyzed, and presented by using the empirical data of pilot areas in the process of design, construction, and the maintenance of railway.

  • PDF

A Study on Considering Non-Working Days for Determination Normal Project Duration in the Railway Bridgework Construction (철도 교량공사의 적정공사기간 산정을 위한 비작업일 산정에 관한 연구)

  • Chae, Su Min;Lee, Sang Hyuck;Park, Hyung Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.5
    • /
    • pp.601-608
    • /
    • 2021
  • Recently, despite a decrease in the number of working days and an increase in the number of non-working days due to an increase in the abnormal climate and the revision of the Labor Standards Act, a standard construction period reflecting this has not been established. For this reason, even if the appropriate construction period is calculated at the site, there is a situation where delays occur due to unexpected circumstances. Therefore, this study proposes a method of calculating the number of non-working days for railway bridgework construction that reflects changes in construction conditions and climate change and reflects this to railway bridgework construction, and the number of working days was calculated. As a result, the number of non-working days by region and month in Korea was derived, and through this, the necessity of regulations and standards for appropriate construction periods reflecting regional characteristics and characteristics of each construction type was presented.

건설소음ㆍ진동규제 기준에 대한 문제점 개선방안

  • An, Myung-Seok;Heo, Young;Lee, Young-Jun
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.648-655
    • /
    • 2001
  • 현재 국내에서는 신항만건설. 경부고속철도 건설, 기존고속도로 신설 및 확장공사 등 대형 국책공사와 도심지 내에서의 아파트부지조성, 고층건물신축, 우회도로, 지하차도, 지하철건설 등 중소형 공사가 증가되고 있으며 이러한 대소형 공사 시에 발생하는 건설소음ㆍ진동은 계획단계에서부터 합리적인 기준설정과 충분한 환경영향평가가 이루어져야겠으며 또한 이러한 평가결과가 공사에 잘 반영되어야 할 것이다. (중략)

  • PDF

Simulation Function of Railway Station Project by Virtual Construction Technology (가상건설기법에 의한 철도역사 시설물 시공시뮬레이션 기능 구축)

  • Kang, Leen-Seok;Moon, Jin-Seok;Kwon, Jung-Hee
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.5
    • /
    • pp.433-440
    • /
    • 2008
  • Virtual construction methodology enables to construct project facility from design phase to construction phase in 3D virtual environment. It is a technique that can solve problems of construction in virtual construction process. This study suggests some methodologies of virtual construction and developed a system for a railway station in Honam express railway project based on suggested methodologies. This study developed layout review and layer simulation functions. Those functions can improve the effectiveness of 3D simulation and the virtual construction system can be used as a verification tool for construction process of various construction projects.