Difference Factors Analysis of between Quantity Take-off Using BIM Model and Using 2D Drawings in Reinforced Concrete Building Frame (건물 골조수량 산출 시 BIM모델 기반 수량과 2D도면 기반 수량 차이 요인 분석)

  • Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.23 no.5
    • /
    • pp.651-662
    • /
    • 2023
  • Recently, research on the use of Building Information Modeling(BIM) for various construction management activities is being actively conducted, and interest in 3D model-based estimation is increasing because it has the advantage of being able to be automatically performed using the attribute information of the 3D model. Therefore, this study aimed that the difference in the quantities is calculated the quantity based on the 2D drawing of a building and is extracted from the 3D model created by the Revit software was compared and tried to find out the cause. The difference in the quantity calculated by the two methods was the largest in the formwork, followed by the smallest in the order of the quantity of rebar and concrete. The reason for this difference is that there is a part where the quantity extraction in the 3D model is not suitable for the quantity calculation standard, and in particular, in the case of formwork, it was difficult to separate only the quantity of the necessary part. In addition, since the quantity of rebar was not separated by member, it was impossible to accurately compare the quantity and identify the cause of the difference. Therefore, it is considered to be the most reasonable to use application software that imports only the numerical information necessary for quantity calculation from the 3D model and applies a separate calculation formula.

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.

A Study on safety improvement of Underground wall construction to Design for Safety (설계안전성검토를 통한 지하외벽공사의 안전개선 연구)

  • Ji, Kyung-Hwan;Choi, Byong-Jeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.4
    • /
    • pp.56-68
    • /
    • 2019
  • Safety-conscious design on site is required for site constructions because of the introduction of the design for safety, but it still leaves much to be desired. This study compared the site where the design was applied and the site where it was not applied. The applied case examined the underground wall construction during frame construction, which corresponds to the skeleton of the building construction. The underground wall construction is quite risky due to the exposure to exterior environments and involvement of various stages, such as scaffolding, formwork, reinforcing work, and concrete casting work. Therefore, the risk factors for each stage were identified and a risk assessment was carried out to select an alternative method to reduce the risk. The risk factors of the selected alternative construction method were also identified and a risk assessment was conducted. The risk assessment weight was calculated by comparing the site where the construction method was applied and the site where it was not, explaining the necessity of the design for safety in reducing the risk. In addition, an actual case where an alternative construction method was used was studied to highlight the necessity for a design for safety.