Korean Journal of Construction Engineering and Management
/
v.7
no.4
s.32
/
pp.137-145
/
2006
Calculating non-working days is very important element for the accurate estimation of construction time. And non-working days are largely affected by weather factors such as rainfall, wind velocity, snowfall and temperature. In the case of concrete works, there are lots of referable information for the calculation of non-working days due to the weather factors. However, for the structural steel works, there are very limited information only. Through literature survey and interviews with a few engineers, this paper established the weather factors that affect steel structural works and the impact of those factors. Based on the factors and the expected impact of the factors together with the weather data during the last 15 years in Seoul region gathered from Korea Meteorological Administration, this paper suggests the monthly non-working day of structural steel work due to weather factors. This information can be used for the early estimation of construction time.
Kim, Changki;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
Proceedings of the Korean Institute of Building Construction Conference
/
2009.11a
/
pp.3-7
/
2009
Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.
Journal of the Korea Institute of Building Construction
/
v.22
no.2
/
pp.161-169
/
2022
The government [3] specifies steel pipe scaffolding as conventional scaffolding and is promoting the installation of system scaffolding, an integrated work platform, and avoidance of the use of steel pipe scaffolding as much as possible. However, in places where equipment cannot enter, such as power plants and plant sites, places the structure is complex, and places where scaffolding cannot be stacked on the ground, there is no choice but to install steel pipe scaffolding. When installing steel pipe scaffolding on an H-beam structure at a high place, the performance of the steel frame clamp is very important in order to form a work space which workers can work safely. In this study, the displacement magnitude and tensile load of members in each installation direction of the clamp for steel frame were verified through performance tests and structural analysis modeling. As a result, it was confirmed that the performance for each installation direction satisfies the safety certification standard tensile load of 10,000N. Although the performance value is satisfactory, deformation of the attachment pressing bolt was verified and was confirmed to have minimal deformation. Thus, to ensure the load is properly to the attachment body, the clamp for a steel frame must be installed in the direction in which the load is transmitted.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05b
/
pp.85-89
/
2010
The propose of this research is derive project management factors and evaluate its decision weight in LNG plant EPC phases. In order to research, we studied the demestic and international research trend and analysed expert opinions. Initially we derived nine project management factors in each phase of EPC. Elicited factors in research are project management, design management, cost management, time management, contract and craim management, safety management, environment management, and risk management. Then, we evaluated the weight of project management factors with expert survey method and elicitated. Finally, The remarkable points in the result are that key management factors of EPC project are project management and risk management.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05b
/
pp.51-52
/
2010
In this study, it is confirmed that the use of equivalent age method can be applied to predict the early-age strength in case of using the new early strength concrete developed for the reduction of construction work period by our company, in apartment.
Proceedings of the Safety Management and Science Conference
/
2003.11a
/
pp.39-46
/
2003
산업재해의 직접적인 원인은 작업자의 불안전한 행동과 작업과정에서의 안전시설 설치미흡으로 인한 불안전한 상태로와 기술적, 교육적, 관리적 원인의 복합적인 형태로 발생되는데 그 가운데 산업안전보건법상의 건설공사 각 공종 별 기술적인 안전시설설치 기준이 건설업 종사자에게 쉽게 적용하기가 현행 법기준에는 문제점이 있으며 이러한 복잡한 법기준을 분석하여 안전사고 예방 기법에 적용하고자 제시하고자하며, 향후에 이를 바탕으로 산업안전보건법상의 안전기준을 체계적으로 분석하여 제시하고자 한다.
The advantages of composite construction are now well understood in terms of structural economy, good performance in service, and ease of construction. However, these conventional composite construction systems have some problems in application to steel framed buildings due to their large depth. So, in this study we executed an experimental test with the "Slim Floor"system which could reduce the overall depth of composite beam. Slim Floor system is a method of steel frame multi-story building construction in which the structural depth of each floor is minimized by incorporating the steel floor beams within the depth of the concrete floor slab. Presented herein is an experimental study that focuses on the flexural behaviour of the partially connected slim floor system with asymmetric steel beams encased in composite concrete slabs. Eight full-scale specimens were constructed and tested in this study with different steel beam height, slab width, with or without shear connection and concrete topping thickness. Observations from experiments indicated that the degree of shear connection without additional shear connection was $0.53{\sim}0.95$ times that of the full shear connection due to inherent mechnical and chemical bond stress.
Korean Journal of Construction Engineering and Management
/
v.2
no.4
s.8
/
pp.127-134
/
2001
Effectiveness of Just in time managing system can be obtained by removing unexpected lead-time and maintaining consistency on the physical transportation of construction resource. Construction resource management is essential on checking on load data from production of shop to field, and it is based on building resource life cycle information. In this study, production, transportation, and assembly disciplines of concrete construction should real time communications exchanging information related to shop-field with each other, Establishing information support system is an important initial step for promoting active cooperations among these resource life cycle on data flow. To achieve this, on suitable using management point, we suggest a concrete construction control model.
Journal of Korean Association for Spatial Structures
/
v.11
no.2
/
pp.129-138
/
2011
Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.
The objective of this study is to investigate the structural behavior of the composite slabs with the new metal deckplate. The new deckplate can be used as structural member with topping concrete. So several experiments of this structural test and the fire resistance test were done. From this experiments. slabs with new metal deckpklate were verified as composite slabs. In this paper, this verifications were compared with the international design methods. For experiment. 49 specimens were made. the main parameters are deckplate thickness (1.2mm. 1.6mm) depth of topping concrete(85mm. 90mm). support condition(simple, 2-span), shear reinforcment(studs), span(2.7m, 3.0m, 3.3m. 3.6m. 3.9m) and shear span(L/3, L/4, L/7). We analyzed the structural behavior of composite slab throughout the moment-curvature relationship which is obtained with the program using the computer language. Turbo C. From this development for slab system, the reinforced concrete or steel structure building may be easy, economical for construction, And informations about the structural behavior of composite slabs will be utilized to established korea standard.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.