Priority on Work Improvement for Automation of Ceiling Finishing Work (천장마감공사 자동화기술 적용을 위한 작업개선 우선순위 도출)

  • Lee, June-Hyuck;Lee, Dongyoun;Kang, Goune;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.187-188
    • /
    • 2015
  • The construction finishing work is emphasized according to high dependence on labor and long term that occupy approximately 40% in construction period, so that it is required for the alternatives such as automation technology. However, it is insufficient to develop the automation technology of construction finishing work compared to other works, for instance, frame work. Also it is not enough about this preliminary research which survey the improvement needs to select the development object. Therefore, this study aimed at derivation of detail works required improvement in ceiling finishing work by the questionnaire survey. These results may provide the basic information to develop the automation technology of construction finishing work.

  • PDF

Factors Influencing Quantity Variations in BIM-Based Quantity Take-offs for Building Finishing Works (BIM기반 건물 마감수량 산출 시 수량 차이 요인)

  • Jeong, Seo-Hee;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.5
    • /
    • pp.607-618
    • /
    • 2024
  • With the growing adoption of Building Information Modeling(BIM), many studies on BIM-based quantity take-off are being conducted. However, the absence of standardized quantity take-off protocols for BIM-based methods has led to a decline in accuracy. This study aimed to compare quantity take-off results from 3D models with those derived from traditional 2D-based quantity take-off methods and modeling approaches, specifically for finishing work, and to identify the underlying causes of any discrepancies. The analysis revealed significant variations in the quantities of walls, floors, and ceilings, with walls exhibiting the largest deviation. The primary cause of these discrepancies was that when interior and exterior surfaces were modeled as a single composite object, it became impossible to accurately set the height of individual finishing materials, resulting in overestimations of the quantities. Consequently, the study demonstrated that modeling interior and exterior components as separate composite objects in 3D models can significantly reduce quantity take-off discrepancies. Moving forward, the establishment of precise quantity take-off standards through additional case studies will be crucial for improving cost management in BIM applications.

A Study on the Operation Improvement of Door Fan Test (Door Fan Test 운영개선에 관한 연구)

  • Kong, Il-Chean;Kim, Hak-Kyung;Choi, Du-Chan;Kim, In-Tae
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2016.11a
    • /
    • pp.275-277
    • /
    • 2016
  • 본 논문에서는 Door Fan Test 수행 사례를 중심으로 사전 준비에 필요한 사항에 대해 분석하였다. 분석 결과 관통부 주위 개구부, 벽체 틈새 개구부 등 방화구역의 누설부위를 통해 약제가 누출되는 문제가 있었다. 원인으로는 전기배선 공사로 인해 내화충전된 부분을 제거하고 공사 후 다시 충전하지 않는 경우, 벽과 천장사이의 틈을 내화 실란트 등으로 마감을 하지 않은 경우가 대부분이었다. 이와 같이 누설부위가 많은 경우 테스트의 결과 불합격이 나오게 되며, 이러한 문제점을 개선하기 위해 사전현장조사를 통해 방호구역의 누설부위를 조사하고 보완조치를 진행한 후 테스트를 수행하는 절차가 필요하였다. 한편, 테스트 운영에 관한 사항으로는 해당 실(room)을 위한 충분한 유량 미확보, 장애물로 인한 와류형성, 차압측정구의 설치문제 등이 있었다. 이를 개선하기 위해서 공기를 유입하는 실은 외부로부터 충분한 공기유입이 있어야하며, 팬 앞의 장애물을 제거하거나 팬의 설치 위치를 조정하는 것이 필요하며, 공기의 유동이 가장 적은 곳에 측정구를 설치하는 등의 조치가 필요하다.