• Title/Summary/Keyword: 처리공법

Search Result 725, Processing Time 0.029 seconds

Development of Finishing Panel using Surface Treatment Method (표면처리공법을 활용한 마감 패널 개발)

  • Kim, Kang-Min;Yoon, Seob;Kwan, Hae-Won;Gong, Min-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.05a
    • /
    • pp.57-58
    • /
    • 2019
  • Precast concrete finishing panels can be implemented in different colors, textures and designs relatively freely by different designers in different finishing materials. Therefore, we tried to develop a PC finishing panel that can be applied in the field by using various color pigment and concrete surface retardation method and polishing method.

  • PDF

하향류식 슬러지층 여과(SBF)를 이용한 하수고도처리기술

  • ㈜엘지건설, ㈜에스비에프
    • Environmental engineer
    • /
    • v.21 s.210
    • /
    • pp.68-71
    • /
    • 2004
  • [ $\circ$ ] 본 기술은 기존의 A2O공법과 Sludge Blanket Filtration(SBF)을 단위공법으로 조합한 공정으로서 각 생물반응조의 미생물 농도를 6,000mg/ 이상의 고농도로 운전하여 생물학적 유기물,질소 및 인 제거효율을 극대화하고자 하는 기술 $\circ$ 또한 활성슬러지 반응조로부터 유입된 슬러지를 SBF에서 미세기포를 이용하여 부상시킴으로써 수면에 농축 슬러지층을 형성시키고 이 부

  • PDF

이중곡면반파공을 이용한 월파저감 방파호안

  • Kim, Geon-U;Seo, Chang-Wan;Park, Gu-Yong
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2007.12a
    • /
    • pp.173-175
    • /
    • 2007
  • 부산신항 남컨 배후지준설토 투기장은 국제도시 부산의 관문이 될 부산신항만 입구부에 위치한 관계로 아름답고 튼튼한 호안이 될 수 있도록 하고, 입찰안내서에 제시된 호안법선변경 금지, 호안마루높이 DL.(+)7.50m 유지 조건을 준수하면서 최적의 구조물이 되도록 하였다. 본사업지는 지형적 특성상 복잡한 형태의 고파랑 작용으로 수리학적으로 월파, 반사파, 연파를 제어하는 경사호안 구조물을 도입하였고, 초연약지반이 대심도로 분포하는 특성을 고려하여 개선된 S.C.P 연약지반 처리공법을 적용하여 기초굴착 없는 친환경적이고 배수기능을 향상시킨 융기토 유용형 S.C.P공법을 적용하였다. 호안전구간은 친수개념을 도입하였으며, 호남도 주변 해양생태계 보호를 위하여 미티게이션(mitigation) 개념을 도입하여 환경복원 계획 및 생태형 친수호안을 구상하였다.

  • PDF

항만배후단지 조성공사 설계사례 - 부산항 신항 남컨배후단지 축조공사를 중심으로

  • Go, Seong-Hun;Song, Sang-Jun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.05a
    • /
    • pp.222-224
    • /
    • 2018
  • 국내 항만배후단지 중 최대 연약층 심도, 초연약 지반이 분포하는 부산신항 남컨테이너부두 항만배후단지 조성공사에 요구되는 지층분포 특성에 따른 연약지반개량의 표층처리 및 연직배수공법 등 제반사항을 유사사례, 시공성 및 경제성 등을 종합적으로 고려하여 제공하였다. 본 설계를 통해 연약지반개량 중 대심도 연직배수를 위한 PBD 타설 장비의 개량을 유도하였으며, 유지관리 및 대심도 연약지반에 따른 경제성을 고려한 허용잔류 침하량을 토지 용도별로 분류하여 제시하였다.

  • PDF

Evaluation of Design Equation and Stability for Trenchless Pipe Liner System with Boundary Treatment (비굴착 전체보수용 라이너의 두께 설계식 및 말단부 처리에 따른 라이너의 안정성 검토 연구)

  • Park, Jong-Sup;Song, Ho-Myeon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.8 no.5
    • /
    • pp.1166-1172
    • /
    • 2007
  • Drainage pipeline system repaired by trenchless technology using liners can be defined between partial and entire collapse. The liners in the partial collapse pipeline are subjected to only uniform groundwater pressure on the surface. This research evaluates practical and useful cured-in-placed pipe (CIPP) design equations based on experimental results and finite element analysis results. Also, stability evaluation of pipe liner system with edge treatment is performed using finite element analysis. The CIPP equation should be used to design liner pipe system.

  • PDF

A Study on Treatment Characteristics and Design of Ultra High Rate Method (Ultra High Rate(UHR) 법의 처리특성 및 설계에 관한 연구)

  • Lee, Jeoung-Su
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.22 no.12
    • /
    • pp.2239-2245
    • /
    • 2000
  • For the treatment of wastewater being discharged in large quantities as in these modern times, qualitative and quantitative concepts should be introduced in consideration of the recycling. In view of a qualitative concept, high rate aeration process is known as the most effective process up to now. However, Lee suggested UHR process showing the superiority over high rate process in treatment rate and quantity. Therefore, this study was performed to investigate the basic sphere of design and treatment quality, such as applicable $BOD_5$-loading and influent wastewater concentration of UHR process, based on Lee's suggestions1). Consequently, this process showed applicable $BOD_5$-loading of $2.2{\sim}7.0kg-BOD_5/kg-MLSS{\cdot}day$, exceeding three times or more of high rate process with maximum applicable loading of $2.25kg-BOD_5/kg-MLSS{\cdot}day$. Meanwhile, with the range of influent wastewater concentration from 200 to 450 mg/L. it showed the treatment rate from 94.7 to 97.3%, it indicated very good condition. In view of quantitative concept of treatment, UHR process is considered an epoch-making treatment process being superior to existing ones.

  • PDF

Ocean Outfall과 폐수처리 공정의 비용분석을 이용한 수영만의 수질관리

  • Park, Hae-Sik;Park, Cheong-Gil;Lee, Seok-Mo
    • Proceedings of the Korean Environmental Sciences Society Conference
    • /
    • 1997.10a
    • /
    • pp.52-53
    • /
    • 1997
  • 수역의 유기오염 개선을 위하여 생활하수, 산업폐수 등의 저하시키는데 주안점을 두어왔으나 공공수역에서의 제거되지 않은 질소와 인의 유입으로 부영양화가 진행되어 하천에는 남조류가 대량발생하고 해역에는 적조가 광역에서 발생하여 큰 사회문제가 되고 있고, 질소와 인의 유입으로 인한 자생 COD가 전체COD의 약 절반을 차지하고 있는 실정이다. 따라서 앞으로의 수질을 개선하기 위해서는 조류증식의 제한인자인 질소와 인의 규제가 필요할 뿐만아니라 하수처리장에 고차처리를 적용하거나, 해양의 회석자용을 이용한 Ocean을 적용하여 연안해역 수질을 관리해야 할 것이다. 따라서 본 연구는 수영만을 대상으로 Ocean Outfall과 폐수처리시절을 적절하게 조합하기 위해서 3차원 생태계모델을 적용하여 유기물질 뿐만 아니라 영양염류인 질소와 인의 농도를 예측하여 환경기준을 만족시키고 비용을 최소화 할 수 있는 폐수처리공법과 해중방류관의 위치를 선정하고자 하였다. 본 연구결과 수영만의 1994년 COD는 II등급, DIN과 DIP는 III등급이었다. 현재의 활성슬러지공법으로 질소와 인을 제거하지 않고 방류할 경우 2001년에 는 하수처리량의 증가로 인해 COD의 경우 1994년 보다 조금 감소하지만 DIN 과 DIP는 1994년과 같은 III등급을 유지하였다. 고도처리공법을 도입할 경우 COD의 농도는 광안리와 해운대해수욕장에서 I등급을 보이고, DIP의 농도도 수영만 전체에서 강등급을 보이지만, DM의 농도는 광안리해수욕장에서 II등급, 해운대해수욕장에서 IH등급을 보였다 하수처리장 유출수를 Ocean Outfall을 이용하여 하수처리장으로부터 4km에 서 방류할 경우의 COD농도는 I등급을 보이고, DE 농도도 광안리와 해운대해 수욕장에서는 I등급을 보이고, DU의 농도는 ll등급을 보여 수질이 개선된 것 을 볼 수 있다. 이상에서와 같이 광안리와 해운대해수욕장의 해역환경기준 ll등급을 만족 하는 하수처리방법은 Ocean Outfall이었다. 수영하수처리장에 인을 처리하기 위한 화학적 침전법의 경우 956억원이 소요되고, 질소를 제거하기 위한 질소제거공정을 추가 건설 할 경우는 2181억원이 전요된다. 그리고 두공정을 같이 건설할 경우에는 3137억원의 비용이 소요된다 수영하수처리장에서 4km 거리와 관경을 2m의 Ocean Outfall 건설비용은 325 억원 정도가 소요되는 것으로 산출되었다. 고차처리시 증가되는 비용으로 건설할 수 있는 Ocean Outfall의 길이는 인 제거공정을 첨가하는 경우에는 18km을 건설할 수 있고, 질소제거공정을 첨가 하는 경우에는 46km를 건설할 수 있는 것으로 산출되었다.

  • PDF