• Title/Summary/Keyword: 지지부 폭

Search Result 32, Processing Time 0.021 seconds

Mock-up Test of Temperature Crack Reduction Method Application by Setting Time Control of Mat Foundation Mass Concrete (응결시간조정에 의한 매트기초 매스 콘크리트의 온도균열저감 공법적용의 Mock-up Test)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.55-61
    • /
    • 2009
  • Recently, the number of high-rise buildings being built in Korea by major construction companies for residential and commercial use has been increasing. When constructing a high-rise building, it is necessary to apply massive amounts of concrete to form a mat foundation that can withstand the huge load of the upper structure. However, it is of increasing concern that due to limitations in terms of the amount of placing equipment, available job-sites and systems for mass concrete placement in the construction field, it is not always possible to place a great quantity of concrete simultaneously in a large-scale mat foundation, and for this reason consistency between placement lift cannot be secured. In addition, a mat foundation Is likely to crack due to the stress caused by differences inhydration heat generation time. To derive a solution for these problems, this study provides test results of a hydration heat crack reduction method by applying placement lift change and setting time control with a super retarding agent for mass concrete in a large-scale mat foundation. Mock-up specimens with different mixtures and placement liftswere prepared at the job-site of a newly-constructed high-rise building. The test results show that slump flow of concrete before and after adding the super retarding agent somewhat Increases as the target retarding time gets longer, while the air content shows no great difference. The setting time was observed to be retarded as the target retarding time gets longer. As the target retarding time gets longer, compressive strength appears to be decreased at an early stage, but as time goes by, compressive strength gets higher, and the compressive strength at 28 days becomes equal or higher to that of plain concrete without a super retarding agent. For the effect of placement lift change and super retarding agent on the reduction of hydration heat, the application of 2 and 4 placement lifts and a super retarding agent makes it possible to secure consistency and reduce temperature difference between placement lifts, while also extending the time to reach peak temperature. This implies that the possibility of thermal crack induced by hydration heat is reduced. The best results are shown in the case of applying 4 placement lifts.

The Evaluation of Radiation Dose to Embryo/Fetus and the Design of Shielding in the Treatment of Brain Tumors (임산부의 전뇌 방사선 치료에 있어서의 태아의 방사선량 측정 및 차폐 구조의 설계)

  • Cho, Woong;Huh, Soon-Nyung;Chie, Eui-Kyu;Ha, Sung-Whan;Park, Yang-Gyun;Park, Jong-Min;Park, Suk-Won
    • Journal of Radiation Protection and Research
    • /
    • v.31 no.4
    • /
    • pp.203-210
    • /
    • 2006
  • Purpose : To estimate the dose to the embryo/fetus of a pregnant patient with brain tumors, and to design an shielding device to keep the embryo/fetus dose under acceptable levels Materials and Methods : A shielding wall with the dimension of 1.55 m height, 0.9 m width, and 30 m thickness is fabricated with 4 trolleys under the wall. It is placed between a Patient and the treatment head of a linear accelerator to attenuate the leakage radiation effectively from the treatment head, and is placed 1 cm below the lower margin of the treatment field in order to minimize the dose to a patient from the treatment head. An anti-patient scattering neck supporters with 2 cm thick Cerrobend metal is designed to minimize the scattered radiation from the treatment fields, and it is divided into 2 section. They are installed around the patient neck by attach from right and left sides. A shielding bridge for anti-room scattered radiation is utilized to place 2 sheets of 3 mm lead plates above the abdomen to setup three detectors under the lead sheets. Humanoid phantom is irradiated with the same treatment parameters, and with and without shielding devices using TLD, and ionization chambers with and without a build-up cap. Results : The dose to the embryo/fetus without shielding was 3.20, 3.21, 1.44, 0.90 cGy at off-field distances of 30, 40, 50, and 60 cm. With shielding, the dose to embryo/fetus was reduced to 0.88, 0.60, 0.35, 0.25 cGy, and the ratio of the shielding effect varied from 70% to 80%. TLD results were 1.8, 1.2, 0.8, 1.2, and 0.8 cGy. The dose measured by the survey meter was 10.9 mR/h at the patient's surface of abdomen. The dose to the embryo/fetus was estimated to be about 1 cGy during the entire treatment. Conclusion : According to the AAPM Report No 50 regarding the dose limit of the embryo/fetus during the pregnancy, the dose to the embryo/fetus with little risk is less than 5 cGy. Our measurements satisfy the recommended values. Our shielding technique was proven to be acceptable.