• Title/Summary/Keyword: 지중침하

Search Result 90, Processing Time 0.026 seconds

Determination of K values from tunnel model tests in sandy ground (터널모형실험을 통한 사질토 지반에서의 K값의 산정)

  • Lee, Yong-Joo;Ryu, Chang-Youl
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.1
    • /
    • pp.87-94
    • /
    • 2010
  • This study mainly focused on the subsurface settlement due to shallow and deep tunneling in sandy ground. In order to figure out theoretical deformation patterns in association with the ground loss during the progress of tunneling, laboratory model tests using aluminum rods and finite element analyses using the CRISP program were carried out. As a result of comparison between the model test and the finite element analysis, the similar deformation patterns were found. In addition, it was identified that the most K values obtained from both the FEA and the model tests were distributed between Dyer et al. (1996) and Moh et al. (1996) of the field observation data. Based on the model test data, the linear equation of K for the sandy soil could be obtained.

Field Measurements of Ground Movements Around Tunnel (현장계측에 의한 터널주변지반의 변위연구)

  • 홍성완;배규진
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.41-54
    • /
    • 1985
  • Generally, ground settlements and lateral displacements are accompanied by underground excavation associated with open-cut or tunnling. These ground movements cause a harmful influence upon nearby super.structures and sub-structures. Occasionally, the ground movements may pose serious problems as the function of the nearby structures may be disrupted. Therefore, prior to the subway construction in an urban area, it is necessary to identify the causes of ground settlements and estimating the extent St the magnitude of ground movements since any potential damage to the nearby structures such as gas lines, water mains, high buildings and cultural assets must be assessed. The research was performed mainly on ground movements such as surface settlements, lateral displacements, subsurface settlements and crown settlements to predict the maximum settlement and settlement zone, and to identify the causes of ground settlements in NATM sections of Busan subway. As a result, it was found that lateral distribution of settlements could be approximated reasonably by a Gaussian normal probability curve and longitudinal distribution of settlements by a cumulative Gaussian probability curve, and that the early closure of temporary invert was very important to minimize ground settlements.

  • PDF

Measurement of Tunnel Arch Settlements Ahead of and Behind the Tunnel Face Using a Horizontal Inclinometer and Settlement Pins (수평경사계와 천단침하계에 의한 터널막장 전후방의 천단침하 계측)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.120-129
    • /
    • 2013
  • It is important to measure the displacement behind and ahead of a tunnel face during construction for evaluating mechanical stability by comparing it to a displacement criteria set by tunnel designers. The 30 m long horizontal inclinometer was installed frontward from the tunnel face and the displacement occurred ahead of a tunnel face during excavation was measured by using it. Tunnel arch settlements behind tunnel face were surveyed using a settlement pins on the arch. So total settlement and longitudinal displacement curve were obtained combining settlement measured by both the horizontal inclinometer ahead of tunnel face and the settlement pins behind the tunnel face.

The Settlement Behavior of Dynamically Compacted High Rock Embankment (고성토 암버력 동다짐 지반의 침하거동)

  • Jie, Hong-Keun;Bae, Kyung-Tae;Noh, Jeong-Huyn;You, Kwang-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.4
    • /
    • pp.61-69
    • /
    • 2012
  • A high rock embankment by means of phased dynamic compaction has hardly carried out in Korea. Settlement of each layer is measured in order to verify the settlement behavior of dynamically compacted high rock embankment. A high rock embankment is generally constructed by dividing into several sub-embankments. Such a sub-embankment and dynamic compaction may induce an increase of pressure at the lower part of embankment and cause a different behavior of ground from initial status. In this study, settlement of a high rock embankment is estimated using a hyperbolic model taking into construction history. The results from prediction are compared with those obtained from field measurements. And second creep settlement is predicted using pre-loading test.

Effect of New Tunnelling on the Behaviour of Grouped Pile and Adjacent Tunnel (신설 터널굴착이 지중 군말뚝 및 인접 터널의 거동에 미치는 영향 연구)

  • Kim, Su Bin;Oh, Dong-Wook;Cho, Hyeon Jun;Lee, Yong-Joo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.509-517
    • /
    • 2022
  • The demand for underground infrastructures such as tunnels is expanding due to rapid urbanization. Tunnels in urban areas are usually constructed adjacent to structures supported by piles. Therefore, a proper understanding of pile-tunnel interaction due to tunnel excavation activities is vital. Thus, in this study, a numerical analysis is conducted to analyze pile settlements, ground surface settlements and shear deformations above an existing tunnel subject to the presence of an adjacent tunnelling, with vertical offsets, the number of piles and the pile spacing considered as variables in the analysis. The results show that the vertical offsets between the tunnel crown and the pile tip generatelarger settlement than the pile spacing. In addition, the vertical offset shows an inversely proportional relationship to the shear deformation due to new tunnelling.

Model Tests for The Behavior of Propped Retaining Walls in Sand (굴착모형실험을 통한 토류벽체 및 지반거동에 관한 연구)

  • 이봉열;김학문
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.259-279
    • /
    • 1999
  • Model tests on propped retaining walls were performed for the investigation of wall displacement, distribution of earth pressure, surface settlement and underground movement at various excavation stage in sand. The result of model tests on the trough of surface settlement showed considerable difference depending on the characteristic of wall stiffness, wall friction and soil condition. The location of maximum underground movement were found to be at range of 0.15H to 0. 1H(H: Final excavation depth). Effect of arching by the redistribution of earth pressure were closely related to the stiffness of wall as well as the soil condition. The wall displacement and earth pressure distribution were simulated by elasto - plastic beam analysis program and finite element method with GDHM model respectively. The result of elasto-plastic analysis showed some discrepancy on the wall displacement and earth pressure, but result of underground movement by FEM with various wall stiffness were in good agreement with the model tests.

  • PDF

Model Tests on Ground Deformation during Trench Excavation for Diaphragm Walls (지중연속벽 시공을 위한 트렌치 굴착시 지반변형에 관한 모형실험)

  • Hong, Won-Pyo;Lee, Moon-Ku;Lee, Jae-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.12
    • /
    • pp.77-88
    • /
    • 2006
  • A series of model tests were performed to investigate the ground deformation during trench excavation for diaphragm walls. An apparatus was manufactured to observe the failure pattern of a slurry-supported trench in sandy ground. Ground deformations including settlement and lateral displacement of the surrounding ground adjacent to the trench were carefully monitored during excavation. Experimental observations indicated that the settlement of the adjacent ground increased with closing to the trench. Especially, the considerable settlement occurred at the distance which was equal to 40% of the excavation depth. And, the higher settlement was obtained when the relative density of ground was looser and the ground water table was higher. Also, the lateral wall face of excavated trench was bulged with lowering the slurry level In stages and then the upper part of trench failed finally. The envelope of ground surface settlement could be represented as a hyperbolic line and the measured settlement was smaller than those predicted by Clough and O'Rourke (1990).

Groundwater Management System for Prediction of Ground Subsidence (지반침하의 사전 예측을 위한 지하수 관리방안)

  • Chae, Dong Seok
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2020.06a
    • /
    • pp.58-58
    • /
    • 2020
  • 최근 급속한 지하공간의 개발로 인해 도로함몰 등 지반침하가 지속적으로 발생되어 이에 대한 안전문제가 끊임없이 제기됨에 따라, 원인규명 및 대책방안을 두고 다양한 조사 및 연구가 진행되고 있다. 특히 지하개발 시 필연적으로 발생하는 유출지하수 내 지하수와 함께 토사가 유출될 경우 지반함몰이나 붕괴로 이어져 대규모 재해가 발생할 수 있기 때문에 현장에서 계측되는 데이터를 통해 사전에 지반침하를 감지할 수 있는 경보 시스템이 마련될 필요가 있으며, 이에 대한 기술개발과 관리기준의 변화가 필요하다. 본 연구에서는 현재 지하공간 개발 시 적용되는 지하수 관리 매뉴얼 중 가장 중요한 부분인 계측관리 부분에 관해 문제점을 분석하고 이를 보완하기 위한 계측 관리 및 행정 절차의 문제점을 개선하고자 한다. 지중에서 발생하는 토립자의 이동, 공동발생 및 지반함몰의 거동은 근본적으로 지하수의 이동에 의해 필연적으로 발생되며, 그 규모는 유출지하수량의 발생규모와 상관성이 높게 분석되었다. 계측 관리의 문제를 보완하기 위하여 첫 번째로 지중 굴착 시 계측되는 유출지하수와 지하수위를 연계하여 분석하여 기준을 마련하였고, 추가로 지하수 내 탁도 값을 측정하여 이를 더하여 서로간 상관성 분석을 통해 기존 지하수위 계측자료의 관리기준을 보완하였으며, 최종적으로 현장에서의 계측된 데이터를 통해 지반침하를 사전에 예측할 수 있다. 계측된 데이터의 분석결과 위험도가 감지될 경우 공동발생의 방지 및 복구에 관한 방안이 제시되며, 문제 발생 지점의 범위를 국한하여 신속하고, 경제적으로 해결해 나갈 수 있다. 이를 위해 현행 지하수법의 개선과 행정적 절차가 보완되어야 할 필요가 있다. 이러한 지하공간 개발 시 지하수 관리의 개선으로 사전에 지반침하를 예측 할 수 있고, 이를 통해 재해를 미연에 방지할 뿐만 아니라 건설산업 현장의 스마트 관리체계를 구성하여 미래 지향적인 토목현장 및 국민에 대한 신뢰도를 재고 할 수 있을 것으로 사료된다.

  • PDF

Damage Assessment of Buried Pipelines due to Tunneling-Induced Ground Movements (터널시공에 따른 지반거동에 의한 지중매설관 손상 평가)

  • 유충식
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.4
    • /
    • pp.71-86
    • /
    • 2001
  • 본 고에서는 도심지 터널의 과학적인 설계/시공을 위한 요소기술 확보의 일환으로 기존의 연구자들이 제시한 손상평가 기법을 토대로 터널굴착에 따른 지중매설관 손상여부의 예비평가를 위한 평가기법을 제시하였다. 제시된 기법을 토대로 다양한 경우에 대한 매개변수 연구를 수행한 결과 지반침하곡선의 경사 및 곡률 등 침하곡선의 제반특성에 기반을 둔 본 연구에서 개발된 손상평가기법의 평가결과는 변곡점의 위치에 많은 영향을 받는 것으로 나타났으며, 따라서 현장 특유의 지반특성 및 시공조건이 반영된 변곡점 산정식의 개발을 위한 지속적인 연구가 필요한 것으로 판단된다. 아울러서 터널심도가 터널직경의 2.5배 이하인 경우 손상도가 현저히 증가하며, 전반적으로 관의 재질이나 조인트의 형식에 관계없이 관체의 인장변형률이 손상여부를 결정짓는 인자인 것으로 나타났다. 본 연구에서 얻어진 결과를 종합하여 터널과 매설관의 상대적 위치 및 지반손실량에 따라 매설관의 손상정도를 정량적으로 평가할 수 있는 설계도표를 제시하였다.

  • PDF

Verification of Applicability of Buried GFRP Pipe through Numerical Analysis (수치해석을 통한 지중매설된 GFRP관의 적용성 평가)

  • Kim, Hongtaek;Kwon, Hyukjoon;Yoon, Myungjune;Yoon, Soonjong;Han, Yeonjin
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.8
    • /
    • pp.73-82
    • /
    • 2010
  • The GFRP(Glass-Fiber Reinforced Plastic) pipe is designed to behave safely against the external forces and to secure stability of deformation and settlements of pipe, since it is laid under the ground. In this study, the evaluation for the pressure stability was carried out by performing the laboratory experiments to figure out the mechanical properties of Glass-Fiber Reinforced Plastic pipe, take a theoretical approach, and suggest the mechanical properties necessary for the analysis and design of GFRP. Numerical analysis is also conducted to evaluate on the field application through the comparison concerning relations between deformation and differential settlement in the GFRP and hume pipes when all and half sections are under the surcharge load.