• Title/Summary/Keyword: 지상증축

Search Result 2, Processing Time 0.016 seconds

A study on Underground and Above-ground Extensions of Buildings using Jack-piles (잭파일을 활용한 건축물의 지하 및 지상증축에 관한 연구)

  • Kang, Seong-Jin;Byun, hang Yong;Hwang, Tae-il;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.23-24
    • /
    • 2022
  • There are many demands for vertical extension construction method in domestic large cities. In this paper, we analyzed and presented the results of examining the cases of ground floor extension and basement extension using the jack pile method. Since the Jack Pile method presses in all the piles without excavating the ground, the bearing capacity of the all the piles can be checked. It was investigated as a safe construction method unlike other small-diameter pile construction methods during underground extension.

  • PDF

Analysis of KASS Flight Test Requirements using The EGNOS (EGNOS 사례를 활용한 KASS 비행시험 요구 사항 분석)

  • Son, Sung-Jin;Hong, Gyo-young;Hong, Woon Ki;Kim, Koon-Tack
    • Journal of Advanced Navigation Technology
    • /
    • v.21 no.6
    • /
    • pp.579-584
    • /
    • 2017
  • SBAS is a satellite based navigation correction system that provides correction information and integrity information of GNSS signal through geostationary satellite based on analysis of GNSS signal in ground station. KASS, a Korean SBAS, is aiming at the APV-1 class SoL service in 2022. Sufficient ground and flight tests must be performed in advance to provide SoL services. However, since KASS, the Korean SBAS, has not yet been added in Korea, specific detailed evaluation items are not presented. EGNOS, which is expected to be the most compatible with KASS and is being serviced after its development, has already been evaluated. In this paper, we analyze the regulations applied to EGNOS construction and analyze the criteria of ground and flight test evaluation items required for flight testing, which is expected to be referenced to the flight inspection process in the future.