Assessment of Slip Sinkage of an Off-Road Tracked Vehicle from Model Track Experiments (모형궤도시험을 통한 야지궤도차량의 슬립침하 평가)

  • Baek, Sung-Ha;Shin, Gyu-Beom;Chung, Choong-Ki
    • Journal of the Korean Geotechnical Society
    • /
    • v.34 no.6
    • /
    • pp.49-59
    • /
    • 2018
  • When a tracked vehicle travels off-road, shearing action and ground sinkage occur on the soil-track interface and severely affect tractive performance of the tracked vehicle. Especially, the ground sinkage, which is induced by vehicle's weight (hereinafter referred to as static sinkage) and longitudinal forces in the direction of travel producing slip (hereinafter referred to as slip sinkage), develops soil resistance, directly restricting the tractive performance of an off-road tracked vehicle. Thus, to assess the tractive performance of an off-road tracked vehicle, it is imperative to take both of static sinkage and slip sinkage into consideration. In this research, a series of model track experiments was conducted to investigate the slip sinkage which has not been clarified. Experiment results showed that the slip sinkage increased with increasing the slip ratio, but the increasing rate gradually decreased. Also, the slip sinkage was found to increase as relative density of soil decreased and imposed vertical load increased. From the experiment results, the normalized slip sinkage defined as slip sinkage to static sinkage calculated in the identical condition was investigated, and an empirical equation for the slip sinkage was developed in terms of slip ratio, which allows vehicle operators to predict the slip sinkage in a given soil and operating conditions.

Behavior of Soft Ground Improved by Weight of Embankment (단계 성토 하중에 의한 개량된 연약지반의 거동 분석)

  • Jeon, Nam-Soo;Pak, Young;Im, Hui-Dae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1190-1193
    • /
    • 2010
  • 본 연구에서는 점토층의 자중압밀을 시행하여 현장강도를 구현하기 위하여 1/70로 축소 모델링하여 원심모형실험을 수행하였으며, 점토구간에 PBD 타설시의 연약지반의 압밀침하거동을 분석하기 위하여서는 1/100로 축소모델링하여 원심모형실험과 전산해석을 실시하였다. 전산해석결과 성토체중심아래의 점토지반의 침하량은 1단계 성토제방하중 하에서 4.8개월 경과 후 최대 침하량은 41.1cm, 2단계 성토하중에서 4.2개월 경과 후의 최대침하량은 78.8, 3단계 성토하중에서 6개월 경과후의 침하량은 93.5cm의 침하가 발생하는 것으로 나타나 수치해석 결과와 원심모형실험결과 값의 유사한 경향을 확인하였다.

  • PDF

Design and Construction Cases of Preventing Ground Subsidence in Mine (광산지역 지반침하방지 설계 및 시공사례)

  • Choi, Woo-Seok;Kim, Eun-Sup;Yang, In-Jae
    • Tunnel and Underground Space
    • /
    • v.27 no.6
    • /
    • pp.393-405
    • /
    • 2017
  • This report is intended to be used as a reference in the project being conducted by MIRECO for preventing ground subsidence in mining district. For this purpose, the procedure of the project for preventing ground subsidence mining district was described and cases of design, construction, and study were introduced.

Settlement Analysis for the Dredged Material Landfill Calculation (준설토 매립량 산정을 위한 침하 분석)

  • Lee, Eun-Han;Park, Jeong-Jun;Kang, Jeong-Gu
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2015.11a
    • /
    • pp.162-165
    • /
    • 2015
  • 본 연구는 ${\bigcirc}{\bigcirc}$ 공구 공유수면 매립공사 수행 중에 매립토량의 부족이 발생함에 따라 이를 대상으로 원인을 분석하고자 수행하였다. 매립지의 토량부족 원인을 파악하기 위해 설계 및 계측자료를 수집하여 시공 현황을 파악하고 지반조사를 통해 해안지역과 매립지반의 시료를 채취하여 성상분석과 원지반에 대한 공학적 특성을 비교 검토하였다. 특히. 현장 시추조사에 의한 경계면 분석과 토질 종류를 점성토, 사질토, 부유토로 구분하고 침하량 공식에 따라 발생량을 산출하였다. 구역의 구분은 설계 시와 동일한 조건에서 침하량을 계산하였고 설계 시 지반고가 침식과 퇴적으로 인해 일부 변경되어 설계시 지반고와 착공시 지반고를 구분하여 기재하고 각각의 침하량을 비교하였다.

  • PDF

A Trend of Back Ground Surface Settlement of Braced Wall Depending on the Joint Dips in Rocks under the Soil Strata (복합지반 굴착 시 암반층 절리경사 각도별 흙막이 벽체 배후 지표침하의 경향)

  • Bae, Sang-Su;Lee, Sang-Duk
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.11
    • /
    • pp.83-96
    • /
    • 2016
  • The surface settlement of the back ground of a braced wall due to the ground excavation has the great influence on the safety of the surrounding area. But it is not easy to predict the settlement of the surrounding area due to proud excavation. Estimation of the settlement of the surface ground induced by the deformation of the braced wall is performed by FEM and empirical method (Peck, Clough etc). In this research, surface settlement of the back ground braced wall depending on the joint dips in rocks during excavating the composit ground was measured at the large scale model test (standard: $0.3m{\times}0.3m{\times}0.5m$). The scale of model test was 1/14.5 and the ground was excavated in ten steps. Earth pressure on the braced wall and ground surface settlement on the back ground of a braced wall were investigated. The surface settlement during the excavation depended on the joint dips in rocks on of the ratio of rock layer. Maximum earth pressure and maximum surface settlement were masured at the same excavation step. In accordance with the increase of the rock layer dips and rock layer ratio, the ground surface settlement increased. The maximum ground surface settlement was 17 times larger at 60 degree joint dips in rocks than that of the horizontal ground conditions. And the position of the maximum surface settlement by empirical method was calculated at the point, which was 17%~33% of excavation depth. In accordance with the increase of the rock layer dips and rock layer ratio, the ground maximum surface settlement increased. The ground surface settlement of composite ground is smaller than that of the empirical.

Application of Fuzzy Reasoning Method for Prediction of Subsidence Occurrences in Abandoned Mine Area (폐광산 지역에서의 지반침하예측을 위한 퍼지추론기법 적용 연구)

  • Choi, Sung-O.;Kim, Jae-Dong;Choi, Gwang-Su
    • Tunnel and Underground Space
    • /
    • v.19 no.5
    • /
    • pp.463-472
    • /
    • 2009
  • Many old domestic mines were excavated with the room and pillar method or the sublevel caving method and they involve the great possibility of surface subsidence, especially in the shallow depth mines. In most of these cases, the mine roadways and openings are very irregular in shape and the information about the local geology is uncertain. Consequently it is not simple to standardize the estimation method for the possibility of subsidence, especially the sinkhole subsidence. In this study, the fuzzy reasoning method has been applied for development of estimating the possibility of subsidence occurrence in abandoned mine area. This method has the advantage in producing the reliable estimation results with a simple performance procedure even when the precise information on the local geology and mining conditions is rare. For the verification of applicability of this method, the developed method has been applied to Kumho mine in Bonghwa, Kyungbook province and the Choong-ju mine in Iryu, Choongbook province where the surface subsidence occurred already.

Field Measurements of Ground Movements Around Tunnel (현장계측에 의한 터널주변지반의 변위연구)

  • 홍성완;배규진
    • Geotechnical Engineering
    • /
    • v.1 no.2
    • /
    • pp.41-54
    • /
    • 1985
  • Generally, ground settlements and lateral displacements are accompanied by underground excavation associated with open-cut or tunnling. These ground movements cause a harmful influence upon nearby super.structures and sub-structures. Occasionally, the ground movements may pose serious problems as the function of the nearby structures may be disrupted. Therefore, prior to the subway construction in an urban area, it is necessary to identify the causes of ground settlements and estimating the extent St the magnitude of ground movements since any potential damage to the nearby structures such as gas lines, water mains, high buildings and cultural assets must be assessed. The research was performed mainly on ground movements such as surface settlements, lateral displacements, subsurface settlements and crown settlements to predict the maximum settlement and settlement zone, and to identify the causes of ground settlements in NATM sections of Busan subway. As a result, it was found that lateral distribution of settlements could be approximated reasonably by a Gaussian normal probability curve and longitudinal distribution of settlements by a cumulative Gaussian probability curve, and that the early closure of temporary invert was very important to minimize ground settlements.

  • PDF

A Case Study of Ground Subsidence in a Groundwater-saturated Limestone Mine (지하수로 포화된 석회석광산의 지반침하 사례연구)

  • Choi, Woo-Seok;Kim, Eun-Sup;Kang, Byung-Chun;Shin, Dong-Choon;Kim, Soo-Lo;Baek, Seung-Han
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.511-524
    • /
    • 2015
  • Groundwater causing subsidence in limestone mines is uncommon, and thus relatively poorly investigated. This case study investigated the cause and possibility of future subsidence through an evaluation of ground stability at the Samsung limestone mine, Chungcheongbuk-do. The ground near the mine area was evaluated as unstable due to rainfall permeation, and subsidence in the unmined area resulted from groundwater level drawdown. Future subsidence might occur through the diffusion of subsidence resulting from the small thickness of the mined rock roof, fracture rock joints, and poor ground conditions around the mine. In addition, the risk of additional subsidence by limestone sinkage in corrosion cavities, groundwater level drawdown due to artificial pumping, and rainfall permeation in the limestone zone necessitates reinforcements and other preventative measures.

A Study on Back Analysis Settlement Prediction of Soft Ground Using Numerical Analysis and Measurement Data (수치해석과 계측데이터를 이용한 연약지반의 역해석 침하 예측에 관한 연구)

  • Sangju Jeon;Hyeok Seo;Daehyeon Kim
    • Journal of the Korean Geosynthetics Society
    • /
    • v.23 no.2
    • /
    • pp.9-17
    • /
    • 2024
  • When constructing on soft ground, managing ground settlement and safety is crucial. However, there often exists a significant disparity between the actual behavior of the ground and the design plans. In this study, we aimed to compare and analyze the difference between the predicted settlement based on theoretical formulas and the measured settlement during construction, in order to predict settlement. For this purpose, we analyzed settlement data from 18 construction sites. The results indicated that the back analysis settlement values were similar to the measured settlement values, whereas the design settlement values were significantly higher compared to the measured settlement values. Specifically, the design settlement values were 1.2 to 1.4 times higher than those derived from back analysis using measured values. The RMSE analysis revealed a value of 0.6212m for the design settlement and 0.1697m for the back analysis settlement. The difference between the back analysis settlement and the measured settlement was more than 70% lower than the difference between the design settlement and the measured settlement. This indicates that the back analysis settlement values exhibit lower error rates compared to the design settlement values.

Geotechnical Diagnosis System for Preventing a Ground Subsidence Relating with Cultural Heritage (석조문화재관련 지반침하 방지를 위한 지반진단시스템)

  • Kim Man-Il;Yang Dong-Yoon;Lee Kyu-Shik;Jeong Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.16 no.3 s.49
    • /
    • pp.301-306
    • /
    • 2006
  • Damages of cultural properties is caused by subsidence of foundation relating stone structures. To prevent of these structures, ground monitoring should be achieved certainly. Representative ground subsidence cause is saturated and unsaturated condition that is produced repeatedly by groundwater level fluctuations. It controls role that decrease porosity or effective porosity of soil media. Estimation of physical properties can predict from reaction of dielectric constant. Variations of dielectric constants are measured from physical characteristics change of pore, soil particle, air and water which are consisted to ground. Therefore, ground subsidence monitoring is thought that quantitative measurement is available using dielectric response of media.