A Study on the Steam Hammering Characteristics by Sudden Closure of Main Stop Valve in the Main Steam Piping System of a Power Plant (화력발전소 주증기배관에서 밸브 차단에 따른 수증기 충격 특성에 관한 연구)

  • Ha, Ji-Soo;Lee, Boo-Youn
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.2
    • /
    • pp.70-77
    • /
    • 2013
  • The present study has been carried out to analyze the effect of steam hammering on the steam piping system including the final superheater, the high pressure turbine, check valve and the first reheater by sudden stoping of main stop valve in a power plant. For the present steam hammering analysis, the well known Flowmaster software has been used to model the steam piping system and the time dependent characteristics of pressure and steam mass flow rate has been conducted. Using the result of the unsteady pressure and steam mass flow rate, the forces acting on the elbows in the piping system has been derived. From the present analysis, it has been elucidated that the elbow just before the main stop valve and the elbow near the connection pipe between bypass pipe and check valve had the largest force among the elbows in the steam piping system. The structural safety diagnostics study on the elbow and the supporting structures of the steam piping system of a power plant will be conducted in the future by the present results of the forces acting on the elbow.

Analysis on the Performance and the Emission of the Integrated Gasification Combined Cycle Using Heavy Oil (중잔사유 가스화 복합발전 사이클의 성능 및 환경배출 해석)

  • Lee, Chan;Yun, Yong-Seong
    • Journal of Energy Engineering
    • /
    • v.10 no.3
    • /
    • pp.188-194
    • /
    • 2001
  • The process simulations are made on the IGCC power plant using heavy residue oil from refinery process. In order to model combined power block of IGCC, the present study employs the gas turbine of MS7001FA model integrated with ASU (Air Separation Unit), and considers the air extraction from gas turbine and the combustor dilution by returned nitrogen from ASU. The exhaust gas energy of gas turbine is recovered through the bottoming cycle with triple pressure HRSG (Heat Recovery Steam Generator). Clean syngas fuel of the gas turbine is assumed to be produced through Shell gasification of Visbreaker residue oil and Sulfinol-SCOT-Claus gas cleanup processes. The process optimization results show that the best efficiency of IGCC plant is achieved at 20% air extraction condition in the case without nitrogen dilution of gas turbine combustor find at the 40% with nitrogen dilution. Nitrogen dilution of combustor has very favorable and remarkable effect in reducing NOx emission level, while shifting the operation point of gas turbine to near surge point.

  • PDF

Theoretical Analysis on the Factors Affecting the Power Efficiency of the Kalina Cycle (칼리나 사이클의 발전효율에 영향을 미치는 요소에 관한 이론적 해석)

  • Lee, Ki-Woo;Chun, Won-Pyo;Shin, Hyeon-Seung;Park, Byung-Duck
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.9
    • /
    • pp.5425-5433
    • /
    • 2014
  • This study examined the effects of the key parameters on the power efficiency of the waste heat power plant using the EES program to obtain data for the design of the 20kW Kalina power plant. The parameters include the ammonia mass fraction, vapor pressure, heat source temperature, and the cooling water temperature. According to the analyses, a lower ammonia mass fraction and a higher vapor pressure increase the efficiency, in general. On the other hand, this study shows that there is a specific region with a very low ammonia mass fraction, where the efficiency decreases with ammonia mass fraction. Regarding the vapor pressure at the turbine inlet, the power efficiency increases with increasing vapor pressure. In addition, it was found that the influence of the vapor pressure on the efficiency increases with increasing ammonia mass fraction. Finally, the optimal condition for the maximum power efficiency is defined in this study, i.e., the maximum efficiency was 15% with a 25bar vapor pressure, $160^{\circ}C$ heat source temperature, $10^{\circ}C$ cooling water temperature, and 0.4 ammonia mass fraction.

Maintenance Frequency Optimization of the Steam Turbine Journal Bearings by Condition-based Maintenance (상태기반정비에 의한 증기터빈 저널베어링의 정비주기 최적화)

  • Lee, Hyuk Soon;Chung, Hyuk Jin;Song, Woo Sok
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.7 no.2
    • /
    • pp.7-13
    • /
    • 2011
  • Turbine journal bearings are designed to support the weight of the rotors on a hydrodynamic oil film and to provide dynamic stability to the rotor system. The life time of journal bearings is infinite theoretically because the journal bearings are separated from the shaft journal by oil film. But poor design, assembly, operation and maintenance can cause problems to the journal bearings. The FMEA(Failure Mode and Effects Analysis) results of the journal bearings show that frequent maintenance of the journal bearings can cause failures and reduction of the bearing life. Therefore, the maintenance periods and history of the journal bearings with the bearing FMEA results are reviewed in order to establish the optimized maintenance period of the journal bearing for the nuclear power plants. Consequently it is necessary to maintain a best condition of lubrication system, reject time-based maintenance and perform the condition-based maintenance of journal bearings in order to maintain optimum condition of the journal bearing.

Analysis of the Influence of Anti-icing System on the Performance of Combined Cycle Power Plants (가스터빈 결빙방지 시스템이 복합화력발전 시스템의 성능에 미치는 영향)

  • Moon, Seong Won;Kim, Jeong Ho;Kim, Tong Seop
    • The KSFM Journal of Fluid Machinery
    • /
    • v.19 no.6
    • /
    • pp.19-25
    • /
    • 2016
  • Anti-icing is important in gas turbines because ice formation on compressor inlet components, especially inlet guide vane, can cause performance degradation and mechanical damages. In general, the compressor bleeding anti-icing system that supplies hot air extracted from the compressor discharge to the engine intake has been used. However, this scheme causes considerable performance drop of gas turbines. A new method is proposed in this study for the anti-icing in combined cycle power plants(CCPP). It is a heat exchange heating method, which utilizes heat sources from the heat recovery steam generator(HRSG). We selected several options for the heat sources such as steam, hot water and exhaust gas. Performance reductions of the CCPP by the various options as well as the usual compressor bleeding method were comparatively analyzed. The results show that the heat exchange heating system would cause a lower performance decrease than the compressor bleeding anti-icing system. Especially, the option of using low pressure hot water is expected to provide the lowest performance reduction.

Control of Internal Packing Seal Clearances Considering for Shaft Behavior During Steam Turbine Operation (증기터빈 운전중 축 거동을 고려한 내부단 패킹실의 틈새 관리)

  • Pack, Min-Sik;Lee, Si-Yeon;Yang, Bo-Suk;Choi, Sung-Choul;Lee, Jae-Geun
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.1715-1720
    • /
    • 2004
  • This paper presents the characteristics of internal clearances for the interstage of blades and shaft gland seals on the steam turbine which are installed in tandem compound. Internal clearances was changed when the rotor turned in the cylindrical sleeve bearing due to the generation of oil film wedge. This presented concern is very useful to prevent the rubbing damage of seal edge between the fixed and moving parts in steam turbine due to the misalignment at the rotating and stationary parts. This method is applied for the unbalanced clearances distribution to the left and right sides in the turbine casing. A considerable amount of unbalanced clearances distribution trend is determined according to the rotating speed of rotor, size and type of proceeding bearing, oil viscosity, surface roughness of bearing and shaft, oil temperature, oil pressure and bearing load.

  • PDF

Determinations of Initial Control Parameters According to the Application of Control System for Feed Water Pump Turbine into a Nuclear Power Plant (원자력발전소 주급수펌프구동용 증기터빈 제어시스템 현장 적용에 따른 초기 제어상수 결정)

  • Choi, In-Kyu;Woo, Joo-Hee
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.72-78
    • /
    • 2009
  • This paper describes one of the ways how to decide the initial control parameters after the analog type control system is changed to digital control system. If the old control parameters were already known, the initial control parameters for initial operation could be decided easily. But sometimes, it is very difficult for the control system developer to decide initial parameters before plant machine starts up. In that case, if there is a big difference between initial parameters and optimal parameters, the whole plant itself can be in very dangerous conditions. Here is a very simple experimental method which can be very easy but useful to engineers.

A Study of Steam Turbine Throttle Flow from Measured First Stage Shell Pressure (증기터빈 1단 Shell 압력측정에 의한 교축유동 고찰)

  • Yoon, In-Soo;Lee, Jae-Heon;Yu, Ho-Seon;Moon, Seung-Jae;Lee, Tae-Gu;Hur, Jin-Huek
    • 한국전산유체공학회:학술대회논문집
    • /
    • 2008.03b
    • /
    • pp.373-376
    • /
    • 2008
  • Industrial Steam Turbine first stage shell pressure is related to throttle flow. Theoretically, first stage shell pressure could, therefore, be measured and used as an index of turbine throttle flow. However, accurate flow measurements show that this pressure is not a reliable index of the actual flow. Data analysis of steam turbinessubjected to ASME acceptance tests shows that the use of first stage shell pressure as an index of throttle flow produced errors as large as 9.6 %. The mean of the errors was +2.2% with a standard deviation of ${\pm}$2.8 %. Applications that require an accuratedetermination of turbine steam flow, such as turbine acceptance testing, should, therefore, not rely on this method. Therefore, First stage shell pressure measurement serves as a valid and economical indicator of turbine throttle flow in cases where a high degree of accuracy in throttle flow measurement is not required but repeatability is desired, such as for boiler control. Generally speaking, Steam turbine first stage shell pressure may also be a very useful monitor of turbine performance when used with certain other turbine measurements.

  • PDF

Thermal Expansion Measurement of Turbine and Main Steam Piping by Using Strain Gages in Power Plants (스트레인게이지를 활용한 발전소 터빈 및 주증기 배관의 열팽창 측정)

  • Na, Sang-Soo;Chung, Jae-Won;Bong, Suk-Kun;Jun, Dong-Ki;Kim, Yun-Suk
    • Proceedings of the KSME Conference
    • /
    • 2000.04b
    • /
    • pp.886-891
    • /
    • 2000
  • One of the domestic co-generation plants have undergone excessive vibration problems of turbine attributed to external force for years. The root cause of turbine vibration may be shan alignment problem which sometimes is changed by thermal expansion and external farce, even if turbine technicians perfectly performed it. To evaluate the alignment condition from plant start-up to full load, a strain measurement of turbine and main steam piping subjected to thermal loading is monitored by using strain gages. The strain gages are bonded on both bearing housing adjusting bolts and pipe stoppers which. installed in the x-direction of left-side main steam piping near the turbine inlet in order to monitor closely the effect of turbine under thermal deformation of turbine casing and main steam piping during plant full load. Also in situ load of constant support hangers in main steam piping system is measured by strain gages and its results are used to rebalance the hanger rod load. Consequently, the experimental stress analysis by using strain gages turns out to be very useful tool to diagnose the trouble and failures of not only to stationary components but to rotating machinery in power plants.

  • PDF

A Failure Analysis on the Broken Last Blade of 30MW Steam Turbine (30MW 증기터빈 최종단 회전익 파단 사고 분석)

  • Kim, S.B.;Kim, I.C.;Han, S.W.;Jun, C.H.
    • Journal of Power System Engineering
    • /
    • v.11 no.1
    • /
    • pp.5-15
    • /
    • 2007
  • In the recently released accident-investigation report on blade failure, almost 70% of blade failures was found at low pressure turbine blades, and it is well known that main cause is due to the vibration modes. This paper describes the systematic approach on the root cause of the blade failure at L 0 stage, 30MW single flow industrial steam turbine which had tripped by high vibration after ten-month commercial operation. A fracture was found at the only one damping wire hole of 59 blades, and crack was detected at three damping wire holes by NDT. According to the analysis result for the crack fracture surface and the chain of the sequential operational events, we come to the conclusion that a typical high cycle fatigue is the most dominant factor caused to the blade failure, the resonance frequency margin was narrowed by the cut damping wire and the high cycle vibration was amplified, and then the blade was broken at once by the centrifugal force when the crack reached the critical size.