국내에서 양계를 사양하기 어려운 조건 중 하나가 계절적 요인이라 할 수 있겠다. 4계절이 있는 국내에서 양계 사양관리는 계절변화 요인이 적게 나타나는 동남아와 일부 유럽에 비하여 관리하기 까다로운 것이 사실이다. 국내기후는 건실한 시설과 그에 맞는 관리를 요구하는 환절기가 존재하여 생산성에 영향을 주고 있다고 표현하는 것이 맞는 것 같다. 환절기 사양관리 중에 주의해서 관리해야 할 사항 중 제일 중점적으로 점검해야 할 사항이 환기가 아닌가 한다.
Korean Journal of Construction Engineering and Management
/
v.20
no.6
/
pp.74-80
/
2019
In domestic construction industry, CM companies perform overall project management tasks such as planning, designing, construction management, evaluation, maintenance for construction projects. However, even with these tasks, as competition becomes more fierce and probability dependence is high, lots of CM companies are experiencing difficulties of securing and preparing indicators for order competence reinforcement. This study examines domestic business condition and task analysis. Also Competence factors are derived through institutional and legal investigation, and review of existing literature. The derived competence factors are focused on practical factors by interviewing with experts. competence factors for each type were classified into BSC's four perspectives(Finance / Customers / Internal processes / Learning and Growth) and surveyed. Based on the results of the survey, the priorities of competence factors that companies should focus on were derived. The purpose of this study is to contribute on making an indicator that can be utilized on business activities through priority analysis of competence factors for order competitiveness reinforcement of CM companies.
Korean Journal of Construction Engineering and Management
/
v.7
no.1
s.29
/
pp.128-137
/
2006
Recently the role and the importance of design value engineering is expected to be high, so research is needed for its effective accomplishment. But in domestic arena, the introduction of the history of design value engineering is too short and insufficient in act of research. Therefore in this research we have suggest the standard for the effective accomplishment of design value engineering work. The way is the abstraction many causes. firstly, we analyzed the team project case of value engineering professional instruction. second, we analyzed the cause of problem produced in accomplishment process of design value engineering work through research for the professional field. So from the base of the analyzed content, we have suggest main control factor for the effectiveness of design value engineering work and the following scheme and process of work efficiency optimization.
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.3-12
/
2016
Recently government is set to expand its policy to promote technical proposal tendering in a dimension of technical competitiveness reinforcement. Because a variety of complicated techniques are applied in technical proposal tendering and variables could be occurred in terms of cost, schedule, constructability and others when techniques are reflected on design document collaboration management among participants is considered insignificantly. So the research would determine primary management factors and presents management direction for collaboration among participants. First action for this is categorization of hindrance factors to collaboration into five factors as 'Poor work processing', 'Communication cap among participants', 'Lack of understanding about technical proposal tendering', 'Difficulty of decision making' and 'Insufficiency in managing the work data'. Second correlation analysis is conducted between the categorized factors and participants according to tasks in technical proposal tendering to figure out the correlation degree of variables. If there is a strong correlation between variables, hindrance factor in that case regarded primary management factor to collaboration and finally management direction is presented at each task.
21세기 양돈산업의 전망은 환경문제, 사료생산, 동물복지 등 다양한 생산제한 요인에 의하여 국제적으로 돈육수급이 불안정할 것으로 예상되지만, 세계적으로 돼지고기 소비는 아시아 지역의 경기회복 등으로 증가추세에 있어 우리의 노력 여하에 따라서는 내수 소비확대 및 수출재개 등 경쟁력 있는 양돈산업으로 발전될 수 있다고 생각합니다. 또한 미래의 양돈산업 전개방향은 소비자 중심의 산업으로 변화되어 돈육의 건강개념과 영양적 가치 증진 및 식품의 안전성에 중점을 둘 것이며, 특히 소비자의 의식변화는 미래 양돈산업을 지배하는 결정적인 요인이 될 것입니다. 한편 유통경영 측면에서는 수직협력 시스템(Vertical co-ordination)과 효율적인 물류유통관리(MSCM) 시스템 도입이 가속화 될 것입니다. 즉, 소비자가$\codt$저마진에 의한 다량판매, 대규모 사육, 생산비 절감 기술개발에 주력할 것이라고 생각됩니다. 이에 따라 우리나라 양돈산업의 국제경쟁력 제고를 위하여 보다 시급히 해결되어야 할 질병$\codt$방역관리, 유통구조 개선, 고품질 돈육생산 및 위생$\codt$품질향상 분야에 있어서 중점 추진되어야 할 내용을 소개하고자 합니다.
Korean Journal of Construction Engineering and Management
/
v.10
no.1
/
pp.91-101
/
2009
The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.507-510
/
2006
Recently, the skyscrapers are increasing. There are major cost-increasing factors to management in the skyscraper construction. The more projects are large like the skyscraper construction, the more systematic methods and tools are needed for cost control. This study proposes an assessment model for major cost-increasing factors in skyscraper construction using FMEA.
Journal of the Korea Institute of Building Construction
/
v.9
no.2
/
pp.55-61
/
2009
In order to conduct construction projects effectively, the work delay factors would be managed by planned construction schedules. As construction works are delayed ceaselessly, the solution is to select and manage the key factors which delay the work ceaselessly. The subjects of this study were an apartment houses of reinforced concrete structure. Hidden work delay factor were extracted, the surveys were conducted and occurrence, severity and detection of each factor were analyzed. With this result, final orders of priority were fixed and key management factors were deducted and presented.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.