• Title/Summary/Keyword: 주택기획

Search Result 74, Processing Time 0.022 seconds

Developing Countermeasure Model to Prevent Planned Lawsuit on Apartment Construction Defects (공동주택 하자기획소송에 대한 건설사 사전 대응 모델 개발)

  • Cho, Youngsun;Cha, Heesung;Kim, Kyungrai;Hwang, Youngkyu;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.74-82
    • /
    • 2014
  • The proportion of apartment housing has been increased to solve the housing problems resulted from rapid growth in urban population and urban economy. With the increase in apartment's proportions and the concern about quality of housing, the contractors have made efforts to satisfy the customers in improving the quality of housing. Despite these efforts, the conflicts between the contractor and the customers are getting serious. Also the disputes and the litigation of defect are increasing because of the contractor's negative treatment and inadequate countermeasure. In this study the defect lawsuits which bring actions against the contractors are collected and analyzed. And then the strategic countermeasures are proposed according to the classifying the type of defect and size. The suggested countermeasure model before the defects are resulted is expected to contribute in developing the contractors strategies to reduce the conflicts against customers.

기획연재-공동주택 하자사례 분석을 통한 시공 시 유의사항

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.8 s.193
    • /
    • pp.40-50
    • /
    • 2006
  • 하자발생은 막대한 보수비용과 함께 기업의 이미지와 신뢰성을 실추시키는 한 요인이다. 따라서 설비건설업계는 가급적이면 하자발생을 억제할 수 있는 공법개발과 함께 정밀한 시공으로 하자 발생율을 최대한 줄이기에 역정을 두고 있다. (주)우원(대표 김영호, 임종태)은 그동안 공동주택에서 발생한 하자사례를 모아 분석한 자료를 내놓았다. 이 자료를 토대로 유의하여 시공한다면 하자발생을 최대한 줄일 수 있을 것으로 보여진다.

  • PDF

A Study of Conflict Resolution and Polocy of the Housing Redevelopment Business (주택재건축사업의 분쟁해소 방안과 정책에 관한 연구)

  • Kim, Jin
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.7 no.5
    • /
    • pp.1109-1115
    • /
    • 2012
  • The housing redevelopment goes on smoothly, because it has problem that prevent theory and alternative policy. The conflict factors may remove to the problem before. This study has proposed that is universally applicable to the housing redevelopment and the conflict factors was supplied effective use of resources. This paper get the conclusion as a survey. first, It have a conflict solution for successful housing redevelopment business. Second, reconstruction business process categorized four stage. Third, It suggest an alternative about reconstruction business manage and systematization.

A study on the Feasibility Analysis factor Model for Housing Development Projects (주택개발사업의 사업성분석인자 모델에 관한 연구;사업성 분석인자의 중요도 분석 및 타당성 검증을 증심으로)

  • Hong, Yeong-Geon;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.249-254
    • /
    • 2007
  • The main bodies of housing markets of today need to carry out a systematic and objective feasibility analysis even from the step of planning in order to succeed in a diverse and complex market environment. Therefore, it is meaningful to understand this housing market environment and propose a necessary model for the feasibility analysis of hosing business. In this vein, the aim of this study was to extract an actual and practical feasibility analysis factor and its importance for housing market, and then present and apply a feasibility analysis factor model to an on-site example, in order to verify the model's validity. For this, the investigator interviewed with and carried out a questionnaire survey of experts in housing development projects. Study findings are as follows:First, the feasibility analysis factor, derived in this study, could provide a ground to evaluate the feasibility of subject projects in the planning of development through an analysis index. Second, when feasibility is under the level of carrying out the projects, it is possible to reexamine the projects through extracting analysis factors of which points are under the standard and via a feedback process for improvable analysis factors. Therefore, the result of applying the feasibility analysis model of this study to actual housing development projects analytically shows that the model could provide a practical evaluation criterion to the person in charge of project development through an analysis index.

  • PDF

The Analysis of the Importance of Influencing Factors in the Planning Stage of the Long-Term Public Rental Housing of Remodeling Project (장기공공임대주택 리모델링 사업의 기획단계 영향요인 중요도 분석)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.3-16
    • /
    • 2024
  • The government announced the Housing Welfare Roadmap (November 2017), to expand the supply of public rental housing by reconstructing aged long-term public rental complexes. Also, remodeling projects for complexes with low business feasibility of reconstruction projects are recognized as an alternative to supplying public rental housing in urban area. This study analyzed influence factors by dividing them into project feasibility, architectural plan, urban & residential environment plan, and legal system groups in order to establish a plan for long-term public rental housing remodeling project. Futhermore, this work conducted the principal component analysis to get the principal component factors among the influence factors of each group, and the weight analysis to calculate weighting of them. In addition, major influence factors were derived by calculating the relative importance score (RIS) of each factor. Lastly this paper validated the major influence factors and applicability of the procedure to select 3 complexes that can be reviewed for remolding project among 33 long-term public rental housing complexes located in Seoul. The results of this study are expected to be useful when establishing a remodeling project plan for long-term public rental housing.

현장탐방 - 이라크 비스마야 신도시 건설 PC플랜트 및 아파트 기계.소방설비공사 윤창기공(주)

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.295
    • /
    • pp.57-68
    • /
    • 2015
  • 내전 후 전쟁 상처를 복구 중에 있는 이라크는 주택, 인프라, 사회 서비스망 구축의 필요에 따라 지난 2010년 이라크 기획청(Ministry of Planning, MOP)이 이라크의 삶의 질 개선을 위한 국가개발계획(Iraq National Development Plan, 2010 ~ 2014)을 수립하고 15개 주정부와 쿠르드 자치정부 지역에 100만호 주거 시설 제공을 위한 국가 주택 프로그램을 발표했다. 이에 따라 2017년까지 주택과 교통인프라, 에너지, IT, 의료, 보안 등에 걸쳐 총 2,750억불(약 300조원)을 이라크 재건사업에 투자할 계획이다. 또 2030년까지는 에너지 분야에 5,000억불 투자 등 정유공장, 발전소, 도로, 인프라, 공공시설 및 군시설 등 다양한 분야에 최소 7,000억불에 달하는 예산을 투입할 예정이다. 한화건설은 지난 2012년 80억 달러 규모의 이라크 비스마야 신도시 건설공사를 수주해 우리나라 해외건설 역사상 최대 규모의 프로젝트 기록을 세웠다. 또한 이 계약으로 우리나라 해외건설 누적 수주액 5,000억 달러 돌파에 크게 기여했다. 윤창기공(주)(대표 백종윤)는 비스마야 현장에서 PC 플랜트 현장의 기계설치공사와 하우징 현장의 기계설비 및 소방공사를 담당하고 있다. 본지는 이라크 현장에 있는 윤창기공(주) 정몽준 소장과 김용우 소장을 이메일로 만나 보았다.

  • PDF

공동주택에 있어서 중앙식과 개별식 가스난방의 경제적 특성에 관한 연구

  • 홍도유
    • 월간 기계설비
    • /
    • s.43
    • /
    • pp.76-82
    • /
    • 1994
  • 본 논문에서는 도시공해 방지를 위해 도시가스를 사용하는 경우 거주자의 생활 수준이나 단지의 밀도 및 난방부하 설정 등에 다소 차이는 있으나 소규모 고층아파트(공동주택)의 난방방식중 중앙난방 방식과 개별난방 방식의 초기 시설비, 연료비, 시설 관리비의 경제성을 검토하고 난방 시스템의 지침을 제시하였다. 전체 공사비(초기투자비)는 개별난방 방식이 중앙난방 방식 보다 약2$\%$정도 절감 되었다. 난방비와 시설관리에 따른 인건비 면에서도 난방의 경우 개별난방 방식이 중앙 난방방식에 비하여 난방과 하절기 운수만을 별도로 사용하는 경우 개별난방방식이 중앙난방방식보다 난방비가 9$\%$정도 더 들었으며, 시설관리 인건비 면에서는 중앙 난방 방식보다 개별난방 방식이 66.7$\%$ 적게 들었다. 전체적으로 중앙난방 방식보다 개별난방 방식이 초기투자비 및 유지관리 면에서 경제성이 우수함이 확인되었다. 본지에서는 삼익건설 기획관리부 홍도유 과장이 $\ulcorner$공동주택에 있어서 중앙식과 개별식 가스난방의 경제적 특성에 관한 연구$\lrcorner$ 자료를 지난 1월호엔 지면관계로 게재하지 못했음을 알려 드린다.

  • PDF

공동주택에 있어서 중앙식과 개별식 가스난방의 경제적 특성

  • 홍도유
    • 월간 기계설비
    • /
    • s.44
    • /
    • pp.90-101
    • /
    • 1994
  • 본 논문에서는 도시공해 방지를 위해 도시가스를 사용하는 경우 거주자의 생활 수준이나 단지의 밀도 및 난방부하 설정 등에 다소 차이는 있으나 소규모 고층아파트(공동주택)의 난방방식중 중앙난방 방식과 개별난방 방식의 초기 시설비, 연료비, 시설 관리비의 경제성을 검토하고 난방 시스템의 지침을 제시하였다. 전체 공사비(초기투자비)는 개별난방 방식이 중앙난방 방식 보다 약2$\%$정도 절감 되었다. 난방비와 시설관리에 따른 인건비 면에서도 난방의 경우 개별난방 방식이 중앙 난방방식에 비하여 난방과 하절기 운수만을 별도로 사용하는 경우 개별난방방식이 중앙난방방식보다 난방비가 9$\%$정도 더 들었으며, 시설관리 인건비 면에서는 중앙 난방 방식보다 개별난방 방식이 66.7$\%$ 적게 들었다. 전체적으로 중앙난방 방식보다 개별난방 방식이 초기투자비 및 유지관리 면에서 경제성이 우수함이 확인되었다. 본지에서는 삼익건설 기획관리부 홍도유 과장이 $\ulcorner$공동주택에 있어서 중앙식과 개별식 가스난방의 경제적 특성에 관한 연구$\lrcorner$ 자료를 이번 3월호를 끝으로 게재한다.

  • PDF

기획특집 - 미래형 도시, 꿈꾸는 탄소 제로도시 개발

  • 환경보전협회
    • Bulletin of Korea Environmental Preservation Association
    • /
    • s.389
    • /
    • pp.8-24
    • /
    • 2010
  • 도시생활과 관련된 교통 주택부문의 온실가스 배출량은 43%를 차지하고 있어 도시에서의 온실가스 저감대책 마련이 시급하며, 저탄소 녹색성장의 시대적 요구에 따라 기후변화 위기에 적극적으로 대응할 수 있는 저탄소 녹색도시 조성이 필요한 실정이다. '저탄소 녹색도시'는 지구온난화 등 기후변화의 주요 원인인 이산화탄소의 배출을 획기적으로 감축하고, 지속가능한 도시기능을 확충하면서 자연과 공생하는 도시를 말한다. 최근의 '저탄소 녹색도시'는 기존의 녹색도시와 또 다른 양상을 보이고 있다. 자원순환과 신재생에너지원의 도입을 주장하고, 탄소상쇄를 위한 에너지 및 자원절감 전략을 중요시 하고 있다. 선진국에서는 이미 주거단지내 소비되는 난방과 전력은 단지내에서 생산되는 신재생에너지를 활용하고 있으며, 모든 주택의 지붕위에 태양광 패널을 설치하고 단지 내 열병합 자가발전소에서 산업폐기물을 소각하여 에너지를 생산함으로써 제로 에너지(Zero Energy)를 실현하고 있다. 선진국 뿐 아니라 전 세계의 이목이 '저탄소 녹색도시'에 집중되고 있으며 저탄소 녹색도시를 조성해야 하는 것은 선택이 아닌 의무가 되고 있다. 우리나라도 2020년 그린홈 100만호 보급을 목표로 주택분야 보급가능 신재생 에너지원을 태양열, 지열, 소형풍력, 연료전지 등으로 다양화하여 안정적 보급 기반을 확보해 가고 있다. 녹색도시를 조성하기 위해서는 저탄소 주택, 저탄소 에너지, 녹색교통, 생태녹지, 물 및 자원순환등 핵심요소들의 적용방안이 검토되어져야 한다. 이에 본지에서는 "저탄소 녹색도시의 해외사례와 국내 적용방향", "그린홈 100만호 보급사업 그간 성과와 발전방향", "온라인 전지자동차의 기술 개발 동향" 내용에 대하여 살펴보고자 한다.

  • PDF