A Study on the Remodeling Strategy for the Equipment Intensive Areas of General Hospitals - Focused on the Diagnosis/Treatment Areas, the Supply Areas - (종합병원 설비집약적인 부문의 리모델링 방안에 관한 연구 - 중앙진료부와 공급부를 중심으로 -)

  • Kim Ha-Jin
    • Korean Institute of Interior Design Journal
    • /
    • v.14 no.1
    • /
    • pp.100-108
    • /
    • 2005
  • If remodeling is defined as activities that restore the overall function of a building up to the standards currently demanded rather than as a simple replacement or repair of old facilities and equipment, the main task of remodeling should be the reduction in differences between areas, establishment of a functional linkage between departments and setup of a smooth circulation system. Therefore, this study is an analysis of remodeling strategies and construction processes to resolve major tasks of remodeling. Through this research we acquire concluding remarks. 1) The remodeling strategies of equipment-intensive areas can be divided into two measures: utilizing the existing buildings (the main buildings) the most, and of concentrated relocation in the new buildings. The former method is advantageous in that the main building serves as a center in hospital layouts because concentrated placement of the diagnosis/ treatment area and the supply area benefit the overall operation in terms of functions. However, the measure has limits in that it is difficult to install the facilities and equipment of the new demands due to the low ceilings, which serve as a potential challenge in future growth and changes. 2) The latter measure is the one in which equipment-intensive areas and the areas that are absolutely short of space are first placed in the new buildings while other areas (the outpatient area, the administration area and the miscellaneous areas) are in the existing building (main building). Given the possibility of development In the future, concentrated placement in the new buildings can be said to be more effective order to actively address future growth and changes.

A Study on the Archtectural Planning Compared with Space for Before and After Remodeling of General Hospitals in Korea (국내 종합병원의 리모델링 전.후 공간비교에 관한 건축계획적 연구)

  • Lee, Joo-Young;Kim, Sang-Bok;Yang, Nae-Won
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.16 no.2
    • /
    • pp.7-15
    • /
    • 2010
  • An early stage of general hospital in Korea was the quantitative growth period. Remodeling has been required to meet the increasing medical demands. To accept the change of paradigm and management operation method, remodeling occurred from the 20th century. Remodeling plans are difficult to define the direction of the detailed plan due to various factors in the beginning of the construction, Therefore, it is necessary to analyze the possibility and limitation of a feasible remodeling plan of general hospitals through the comparison of existing hospital before remodeling and after the remodeling takes effect. A comparison of the researched hospital's blue prints before and after the remodeling and recently built hospital's blue print, analyzed characteristic of the space variation by the remodeling. The purpose of research is to confirm a possibility and limitation of remodeling of general hospitals comparing with merits and faults of extension, reconstruction, and construction. In conclusion, the area of remodeling hospitals increase mostly medical department(ward, outpatient department, inpatient department) and subsidiary facilities, but the area of ward and inpatient department are less than the new hospitals. Especially, public area is greatly increased by the diversification of corridor function. Also, remodeling hospitals represent a limitation to plan departments in need of equipment-intensive space. To address this problem, expansion space is used mainly with inpatient department and existing space is placed mainly with low-impact department by equipment ; outpatient department, administration department.

An Evaluation of the Importance of Risk Factors for the General Hospital Remodeling Approached by Analytic Hierarchy Process (AHP) (AHP 분석을 통한 종합병원 리모델링 공사의 리스크 요인 우선순위 평가)

  • Moon, Seong Joo ;Go, Seong Seok
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.30 no.3
    • /
    • pp.45-56
    • /
    • 2024
  • Purpose: It is important to note that the relative importance of risk factors should be identified to successfully complete the remodeling project of general hospital. Approached by analytic hierarchy process (AHP), the present study aimed to systematically evaluate the risk factors for remodeling of general hospital. Methods: The present work classified the risk factors of general hospital remodeling into four major categories including the requirements survey stage, planning and design stage, dismantling and construction stage, and maintenance stage. In addition, four sub-categories were derived from each major category factor. Furthermore, five major categories and four subcategories were selected to be considered from the perspectives of two stakeholders of contractor and constructor. The relative importance of the major and sub-categories factors was calculated using the AHP technique on the survey data collected from 49 respondents who participated in the survey study. Results: The results indicate that, the risk factor of requirements survey stage was found to be the most important risk factor to consider among the four major categories of factors. Also, insufficient preliminary investigation, design inconsistencies in architecture/mechanics/electricity, occurrence of safety accidents, and insufficient review of various equipment capacities and performances were found to have the highest priorities of each subcategory factor group included in the four major categories. From the perspective of contractor, the error in predicting the construction period was found to be the most important risk factor. The occurrence of safety accidents during construction was found to be the most important risk factor to be considered by constructor. Implications: The result of the current work should provide important insights and guidelines for the risk management activity that contributes to controlling the project time, cost, and scope required for general hospital remodeling.