• Title/Summary/Keyword: 종합관리계획

Search Result 638, Processing Time 0.034 seconds

A Study on the Application of Closed School through Regional Analysis: Focused on the Gyeonggi-do Office of Education (지역분석을 통한 폐교 활용 방안: 경기도교육청을 중심으로)

  • Lee, Mi-young;Kang, Myung-gu;Choi, Jun-yeol
    • Journal of the Korean Regional Science Association
    • /
    • v.37 no.3
    • /
    • pp.37-46
    • /
    • 2021
  • The closure of education office is due to a decrease in the number of students, but it is necessary to look at various causes of this decrease. In particular, unlike other regions, Gyeonggi Province has a large number of students due to redevelopment, relocation of businesses, and changes in school districts. In addition, it is necessary to set the overall direction for the use of closed schools and seek ways to establish an efficient operation and management system in preparation for the changing future of the educational environment. Through this study, the closure of schools in Gyeonggi-do is different from that of local schools. The measures to utilize closed schools in Gyeonggi-do Province should be different and contribute to realizing the utilization of closed schools.

A study on the Impact of Financial Conditions on Accounting indicators -Focusing on the Financial Soundness of Private Universities- (재정여건이 회계지표에 미치는 영향에 관한 연구 -사립대학 재정건전성을 중심으로-)

  • Park, Tae-Hwan;Bae, Eun-Jin
    • Journal of Digital Convergence
    • /
    • v.19 no.12
    • /
    • pp.273-280
    • /
    • 2021
  • The purpose of this study is to provide implications for fiscal policy by comprehensively examining the relationship between the on-campus retention and university soundness items of four-year private universities in the context of financial contraction of private universities due to suppression of tuition increase. Multiple regression analysis was performed to analyze the correlation of variables and the effect of financial soundness items on accounting indicators using SPSS 25. First, private university's on-campus reservations had an effect on accounting index items. Second, financial soundness items had an effect on accounting index items. Third, the financial condition factors influenced the change of accounting index by the location of the university. Fourth, according to the size of students, financial conditions had an effect on the change in accounting indicators. Government investment and support for private universities should be changed to a paradigm of securing finance through establishment of a development plan, rather than financial support through reduction of quota, and survival should be sought through income diversification policy strategies.

A Study on the Operation of a Collaborative Repository of the Regional Central Library: Focused on the Busan Metropolitan Library (지역대표도서관 공동보존서고 운영에 관한 연구 - 부산도서관을 중심으로 -)

  • Kang, Eun-Yeong
    • Journal of the Korean BIBLIA Society for library and Information Science
    • /
    • v.33 no.3
    • /
    • pp.55-76
    • /
    • 2022
  • The 3rd Library Development Plan raises the need to secure space through the establishment of a regional repository library as the issue of holding books is highlighted as a common problem in public libraries. The Korean Library Law Act also impose the responsibility of integrated management of local library materials on the regional representative library. Accordingly, this study aimed at Busan Metropolitan Library, which is operating a collaborative repository in earnest among regional representative libraries, and investigated the operation status of the collaborative repository and the perception of public librarians about the collaborative repository. The data necessary for the study were obtained through surveys, interviews, field surveys, and internal data analysis. Through this, the purpose of this study was to provide basic data that will help the Busan Metropolitan Library to operate the collaborative repository efficiently in the future, and at the same time, to present basic data that can be used as a reference for the operation of the collaborative repository of the representative libraries of other regions.

The Quantification of Flood Damage Using K-FRM (K-FRM을 이용한 홍수피해액 정량화)

  • Yeong Uk Yu;In Gyu Hwang;Yeon Jeong Seong;Young Hun Jung
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.405-405
    • /
    • 2023
  • 최근 기후변화로 인한 극심한 홍수와 가뭄, 폭염 등 이상 기온 및 기후에 따른 피해가 급격히 증가하는 추세이다. 특히, 집중호우로 인해 도심지에서 발생한 홍수피해는 재산피해뿐만 아닌 수 많은 인명피해가 발생하고 있다. 국내에서는 수재해로부터 인명과 재산을 보호하기 위해 용수공급과 체계적인 치수 사업이 행한 바 있다. 이러한 치수 사업에서 경제성 분석은 사업 전·후 의 편익추정이 완벽히 검증되기 쉽지 않으며, 기존의 치수 계획은 유역 전반에 걸쳐 다양한 홍수 방어시설의 종합적인 고려 없이 제방 중심으로만 수립되어 홍수 발생 시 하천에 과도한 부담을 줄 뿐만 아니라, 사업의 경제성이 낮게 평가되고 있다. 이렇게 국내에서 행해진 하천설계기준에서 제안되었던 경제성 분석 방법은 여러 가지 문제점들을 내포하고 있으며 지속적인 홍수피해가 발생하였다. 이와 같은 문제점들을 개선하고자 개발된 K-FRM(Forean-Flood-Risk Model)은 능동형 하천정보 운영을 통한 다차원 하천관리체계 구축 및 활용을 위한 정량적 위험도 평가 툴로 위험지역에 노출된 자산의 정보(인벤토리), 평가기준, 손상함수, 계량화 원단위 등 홍수피해를 추정하는데 활용이 가능하며, 손실 또는 피해액으로 표현되는 재해손실은 경제적인 관점에서의 위험이며 금전적인 형태로 표현된다. 본 연구에서는 홍수피해액 정량화 모델인 K-FRM을 활용하여 굴포천 유역과 영강 유역을 대상으로 항목별 피해액 산정 후, 정량적 피해액 산정 방법인 EAD(Expected Annual Damage) 분석을 통해 홍수피해위험지도를 작성하여 표준유역별, 행정구역별 홍수피해액을 산정하는 것을 목적으로 한다.

  • PDF

Development of big data-based water supply and demand analysis technique for digital new deal (디지털 뉴딜을 위한 빅데이터 기반 물수급 분석 기법 개발)

  • Kim, Jang-Gyeong;Moon, Soo-Jin;Nam, Woo-Sung;Kang, Shin-Uk;Kwon, Hyun-Han
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.76-76
    • /
    • 2021
  • 물정보 중 가뭄 정보가 상대적으로 부족한 원인은 무엇을 가뭄으로 볼 것인지 정의하기 어렵기 때문이다. 특히 우리나라와 같이 댐 및 저수지, 광역상수도 등 수자원시스템 네트워크를 기반으로 물공급이 이루어지는 경우, 개별 요소만을 고려한 기존 가뭄모니터링 및 전망은 현실적이지 못하며, 가뭄 위험도 관리 측면에서도 부족한 부분이 있다. 가뭄 현상의 경우 기상학적 영향인 강수의 부족이 가장 큰 요소로 기여하지만 실질적으로 국민에 필요한 양보다 적은 양의 물이 공급될 때 국민들은 가뭄을 체감한다. 이러한 점을 보완하기 위하여 지역별로 사용하는 수원 및 물수급 시설 등을 세분화하고, 실적기반 분석을 통해 분석대상 지역의 가뭄을 정확히 판단하기 위한 합리적인 물수급 분석 모형 개발이 필요하다. 즉, 공간분석단위를 표준유역 단위 이하의 취방류 시설물을 기준으로 구성하고, 이들 시설물의 운영정보와 수문기상 빅데이터를 연계한 물순환 모형을 구현함으로써 댐, 저수지, 하천 등 다양한 수원을 가지는 유역 내 가용 수자원량을 준실시간 개념으로 평가하는 시스템의 개발이 필요하다. 본 연구에서는 하천을 중심으로 물수급 관련 수요·공급 시설의 위치를 절점으로 부여하고 연결하는 물수급 네트워크 알고리즘을 통해 빅데이터 기반 물수급 분석 모형을 개발하였다. 주요 모니터링 지점 및 모든 이수 시설의 위치를 유역분석 기법을 통하여 점(point), 선(line), 면(shape)으로 구성된 지형공간정보의 위상(topology) 관계를 설정하여 물수급 분석의 계산순서를 선정하고, 시계열 DB를 입력하여 지점별 물수급 분석 결과를 도출하였다. 권역별 주요 수위-유량관측소 1:1 Nash 계수를 검증한 결과 저유량에서 0.8 이상의 높은 재현 성능을 보이는 것으로 나타났다. 이에 따라 본 연구에서 개발된 물수급 분석 모형은 향후 물관련 이슈 지역의 용수공급능력 평가 및 수자원장기종합계획 등 다양한 수자원 정책평가에 활용될 것으로 기대된다.

  • PDF

Analysis of hydraulic characteristics for spillway using numerical simulation (수치해석에 의한 여수로 수리특성분석)

  • Lee, Byeong Wook;Jang, Eun Cheul;Baek, Donghae;Yoon, Jae-Seon;Song, Hyun-Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.246-246
    • /
    • 2022
  • 여수로는 수리시설의 계획저수위보다 높아진 수위를 낮추기 위하여 물을 안전하고 신속하게 방류하는 시설로 조절형식과 비조절 형식으로 구분한다. 조절형식은 인위적으로 조절수문을 이용하여 수위를 조절하는 형식으로 수문식과 밸브식으로 분류하며, 이상홍수대비 비상방수문에 많이 사용되고 있다. 비조절형식은 자연적으로 수위를 조절하는 형식으로 개수로와 관수로로 분류한다. 개수로에는 측수로식, 슈트식, 자유낙하식, 월류식이 있으며, 관수로에는 터널식, 선굴식, 암거식, 사이펀식이 있다. 한국농어촌공사가 관리하는 저수지는 3400개소로 측수로식 2091개소, 월류식 1269개소, 사이펀식 5개소, 선굴식 3개소, 기타 56개소로 비조절형식 여수로가 약 98%를 차지하고 있다. 2003년도에 재해대비 수리시설 설계기준이 개정되어 유역면적 2,500ha, 총저수량 500만m3이상이고 하류지역의 재산 및 인명피해가 클 것으로 예상되는 저수지는 PMF를 설계홍수량으로 적용할 것을 규정하고 있다. 이러한 설계기준의 홍수빈도를 적용하기 위해 기존 저수지의 치수능력증대 사업이 추진되고 있다. 치수능력증대방안으로는 제당높이 증고, 보조여수로 설치, 기존여수로의 확장 등 다양한 방안들이 있으며, 구조물 안정성, 경제성, 현장 여건을 고려한 시공성 등을 종합적으로 고려하여 채택하고 있다. 그 중 가장 대표적인 방안이 기존의 설계빈도를 초과하는 PMF 홍수량에 대하여 추가로 보조여수로를 설치하여 방류하는 방안이다. 본 연구에서는 기존 사이펀 여수로가 설치되어 있는 저수지에 측수로식 여수로와 사이폰식 여수로를 신설하여 FLOW-3D로 수치해석을 수행하였다. PMF 유입에 대한 저수지의 안정성을 확보하고, 이상강우에 의한 재해를 사전에 예방하기 위하여 신설 여수로의 방류능력, 접근 유속, 허용최대유속 등 각종 수리특성을 분석하여 홍수량 배제 능력을 검토하였다.

  • PDF

Development of Cotton Farming and Transformation of Rural Area in Sanliurfa Prefecture, Turkey (터키 샹르울파주 목화농업의 전개와 지역사회의 변화)

  • Kang, Sukkyeong
    • Journal of the Korean Geographical Society
    • /
    • v.48 no.1
    • /
    • pp.87-111
    • /
    • 2013
  • Regional disparities between eastern and western regions is the most of serious problem for balanced regional development in Turkey. The Southeastern Anatolia Project (GAP) is being implemented to eliminate these regional development disparities. The work that was initially planned as predominantly for hydraulic energy production to utilize water resources of the Tigris and Euphrates rivers more effectively was later transformed into an integrated multi-sector regional development project. This study noted that this region had very limited cash crop production because of the constraints of semi-arid climate of the southeastern region, however, later, it has changed Turkey's major cotton producing region since Southeastern Anatolia Project carried out. Therefore, this study investigated background, process, and content of the Southeastern Anatolia Project with respect to high cotton productivity in this region and examined the dynamic changes of cotton productivity in this region. In addition, Sanliurfa prefecture is one of the main development axes of the Southeastern Anatolia Project, because government investments are concentrated on this prefecture. Therefore, this study examined the background and process of cotton farming growth in this prefecture. In 2011, Sanliurfa prefecture produced 37.6% of Turkey's total cotton production. This is mainly due to agricultural infrastructure expansion such as land consolidation, irrigation, roads and farm roads. Also, it is one of the main factor that subsidies paid to farmers for cotton cultivation. The introduction of irrigation has dramatically changed the direction of seasonal migration of this area. Prior to irrigation, this area had a serious social issue about out-migration for seasonal labor to other areas. However, the introduction of irrigation made this area that changed to in-migration and intramigration for cotton cultivation. Irrigation water is supplied to farmers through the WUAs (Water User Associations) that handed over irrigation water management, operation from DSI (General Directorate of State of Hydraulic Works). However, the WUAs are under the influence of Ashiret, a traditional feudal social structure. Because of this reason, it does not have an efficient management for farmers. Also, it is one of the reasons that this area does not have autonomous farmer organization.

  • PDF

건설산업경쟁력 강화와 부실방지대책(안)

  • 한국주택협회
    • 주택과사람들
    • /
    • no.54 s.71
    • /
    • pp.185-206
    • /
    • 1996
  • 1.건설제도의 국제화와 경쟁기반 구축 $\bullet$건설산업을 기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$사후관리 등 전 분야에 걸쳐 경쟁력 있는 산업으로 육성-기획$\cdot$설계$\cdot$시공$\cdot$감리$\cdot$유지관리 등 건설산업 전반에 관한 기본사항을 법제화-대규모 공사의 경우 발주자를 대신하여 건설공사의 기획$\cdot$설계$\cdot$발주$\cdot$감리$\cdot$시공관리 등 업무의 전부 또는 일부를 종합적으로 조정$\cdot$관리하는 $\lceil$건설사업관리$\rfloor$제도를 도입 $bullet$건설공사 $\lceil$현장실명제$\rfloor$도입을 통한 하도급제도의 정비-전문건설업자로부터 하도급, 위탁, 고용 등의 형태로 공사에 참여하는 현장근로자를 신고 받아 권익을 보호하고 시공책임도 부과하는 $\lceil$현장실명제$\rfloor$도입 $\bullet$공사완성보증제, 손해배상보증제도를 도입하고, 신용상태 $\cdot$시공능력에 따라 보증 요율 등을 차등화 하여 부실업체를 배제 $\bullet$건설공사관련 각종 계약서와 시방서 등 제기준을 정비하여 발주자$\cdot$시공자 등 건설주체간의 역할과 책임을 명확화$\bullet$건설분쟁을 신속하고 객관적으로 조정$\cdot$중재하기 위하여 $\lceil$건설분쟁중재원$\rfloor$으로 확대 개편 2. 건설인력의 육성과 고용안정$\bullet$경쟁력 제고의 관건인 우수인력 확보를 위하여 대학교육 제도의 개선을 포함한 건설 인력 수급대책을 추진 - 대학의 건설관련 학과 정원을 2000년까지 매년 일정규모로 증원하여 고급기술 인력을 배출 현재 50$\%$에 불과한 건설관련 국가기술자격자를 2000년에 70$\%$까지 제고 - 감리 등 전문인력을 양성하고, 선진외국 감리 회사를 활용하여 국내 업계와의 경쟁을 유도 $\bullet$건설현장의 최일선에서 품질을 담당하고 있는 건설기능공의 고용안정과 복지향상을 위한 획기적인 대책을 마련 - 건설기능공의 자긍심과 사회적 책임의식을 고취하기 위해 기능공이 여러 현장을 전전하여 근무하더라도 경력관리, 공제금 등의 합산 관리가 가능하도록 $\lceil$건설 근로자 복지카드$\rfloor$제도를 도입 *$\lceil$건실시연구단$\rfloor$을 구성$\cdot$구체적인 운영방안을 수립 - 건설 업체 실정에 맞는 현장위주의 기능검정제도 도입 $\cdot$자격증이 현장에서 요구되는 기능수준과 숙련도를 제대로 반영할 수 있도록 검정방법을 현장 실기위주로 개선하고 자격검정업무도 건설협회 등의 자격 검정능력을 향상시켜 위탁$\cdot$시행하는 방안을 검토 3. 공사시행기관의 전문성과 책임성 제고 $\bullet$시장이 개방되어 건설공사가 국제적인 관행에 따라 이루어질 것에 대비하여 시행기관에 계약$\cdot$공사관리 등 전문직공무원을 집중 교육하여 양성 $\bullet$ 조달청이 대행하여 공사계약을 하는 경우라도 설계변경은 발주기관이 자체적으로 할 수 있도록 허용 $\bullet$ 기술직 공무원의 기술향상을 위하여 관련 공무원의 확충, 해외연수, 현장교육 강화 등을 지속적으로 추진 $\bullet$ 충분한 사전조사를 거쳐 사업계획을 수립하도록 $\lceil$건설공사 시행절차$\rfloor$를 규정 $\bullet$ 공사기간 3년 이상의 공사에 대하여는 최대한 계속비사업으로 편성토록 계속비제도의 운영을 활성화 4. 건설현장의 품질관리체제 구축 $\bullet$ 현장배쳐플랜트 설치를 확대하여 레미콘의 품질관리를 일원화하고 현장에서 레이콘을 배합하는 건식공법을 채택 - 현장레미콘생산시설(B/P)설치 확대로 콘크리트 하자에 대한 책임한계 일원화 유도 - 레미콘 재료인 골재$\cdot$시멘트$\cdot$물을 공장에서 혼합하여 공급하는 현행 습식배합 대신에 물만을 현장에서 혼합하는 건식 배합방식을 도입 $\bullet$철강재$\cdot$철구조물의 품질을 보증하기 위하여 일정기술을 갖춘 공장에서만 제작토록 하는$\lceil$공장인증제$\rfloor$를 도입 - 제작시설과 품질관리 등을 심사하여 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 제작공장을 등급화하고 등급에 따라 철강재 등의 제작업무 범위를 차등화 $\bullet$시설물에 대하여도 시공업체가 사후관리를 일괄 책임질 수 있도록 $\lceil$시공 및 유지관리 일괄계약제도$\rfloor$를 도입 - 대형교량$\cdot$소각로$\cdot$하수처리장 등 유지관리에 전문성이 요구되는 분야부터 시범적으로 도입 $\bullet$건설자재의 표준화$\cdot$정보화사업을 조속히 추진 5. 건설업체에 대한 지원 강화 $\bullet$일부 공공사업자의 경우 관행화되어 있는 대금일부의 어음 또는 채권지급방법을 단계적으로 축소 $\bullet$매월 감독이나 감리원의 기성확인에 의하여 시공자에게 공사대금을 직접 지급토록 하는 등 대금 지급절차를 간소화 6. 민간 건축물에 대한 안전확보 $\bullet$충실한 설계가 이루어지도록 제도를 개선 - 설계도서 작성기준을 제정하고 다중이용시설에 대하여는 건축심의단계에서 구조검토 등 설계심의를 의무화 $\bullet$대형다중이용시설에 대한 감리 강화 - 감리전문회사 수준의 감리체제로 전환하고 감리대가도 공공수준으로 인상하고 적용요율대로 지도$\cdot$감독 강화

  • PDF

Development of Collision Scenario-Based Evaluation System for the Cognitive Performance of Marine Officers (충돌시나리오 기반의 항해사 인지능력 평가시스템 개발)

  • Kim, Hong-Tae;Barentt, Mike;Yang, Won-Jae
    • Journal of Navigation and Port Research
    • /
    • v.31 no.8
    • /
    • pp.629-635
    • /
    • 2007
  • Reduced crew performance is frequently cited as a major causal factor in maritime accident causation. Although considerable research has been conducted on the hours of work undertaken by seafarers through interviews and the analysis of records, experimental studies to observe the effects of factors such as high workload, shift patterns, stress, sleep deprivation and disturbance on the cognitive performance of mariners have been limited. Other safety-critical transport industries, such as aviation and rail, have developed fatigue management tools to help manage the work patterns of their operators. Such a tool for mariners would assist shipboard crew, marine pilots and shore management in planning and improving work schedules. The overall aim of this paper is to determine a fatigue factor, which can be applied to human performance data, as part of a software program that calculates total cognitive performance. This program enables us to establish the levels of cognitive performance of a group of marine pilots to test a decision-making task based on radar information. This paper addresses one of the factors that may contribute to the determination of various fatigue factors: the effect of different work patterns on the cognitive performance of a marine pilot.

Cost Estimating method for the Public Office building at the early stage (공공건축물의 초기공사비 산정방법 연구)

  • Koo, Won-Yong;Kim, Jung-Gon;Lee, Jun-Seok;Park, Hyeong-Geun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.261-266
    • /
    • 2007
  • In this research, we studied an estimating method in client's sight to estimate the total construction cost which is based on the historical cost data at the early stage of the office buildings as a public phase. It is very difficult to analyze the estimation accurately and logically. When a client estimates a project, he/she has to consider there are many issues at the planning step, according as office buildings become gradually diversified as well as their roles continuously extended. Therefore, those are usually make problems for wasting the budget in accordance with the cost estimation errors. Moreover, many kinds of public construction projects, especially such as school, office, sports complex, and the others, have been invested the private finances defined as BTL(Build Transfer Lease) method that are required to manage the detailed process more strictly from initial planning. In order to make an effective planning, the long-term users amount and the building life cycle at the beginning of project should be considered previously and then it may enable to achieve an appropriate project plan. But actually considering overall variables in a building planning is impossible. Accordingly, suggesting a regression model based on the historical cost data from many similar types of office building to support client's role known as estimating the total cost at the early stage. And then performing the test against the proposed model to research the reasonability as using the historical cost data of Japan office buildings.

  • PDF