• 제목/요약/키워드: 조선소 도장작업자

검색결과 3건 처리시간 0.02초

조선소 도장작업자의 작업환경 및 작업복 착의실태 분석 (The Analysis on the Work Environment and Working Clothes Wearing Conditions of Shipyard Painters)

  • 배현숙;박혜원;박진아
    • 한국의류학회지
    • /
    • 제34권3호
    • /
    • pp.518-528
    • /
    • 2010
  • This study analyzes the work environment and the work clothes wearing conditions of shipyard painters. In addition to this, three types of experimental painting work clothes were evaluated by painters in terms of the material performance and wearing functions. The findings on the harmful painting work environmental factors were organic solvents, noise, heavy dust, high temperatures, and noxious fumes. The body parts damaged during painting operations were the skin, arms, whole body, and face. In general, the satisfaction with the wearing performance of work clothes for painting was low especially in regards to sweat absorbency, sweat permeability, body protection, covering, and the work motion suitability. The satisfaction with the wearing sense of painting working clothes (regardless of the type of material) was high in the order of movement comfort> sensual comfort> physiological comfort. The satisfaction in overall comfort according to the types of material was high in the order of nylon> SMS nonwoven fabric> SF nonwoven fabric.

해양구조물의 모듈조립공정을 위한 생산계획법 (A Production Planning System for Assembly Process of Offshore Structure Modules)

  • 김정제;박소흠
    • 대한조선학회논문집
    • /
    • 제29권1호
    • /
    • pp.173-190
    • /
    • 1992
  • 해양구조물(Offshore Platform)은 우리나라 조선소에서도 1976년이후 꾸준히 시공되어져 왔으나, 이미 체계화되어 있는 선박 건조와는 달리 이 분야에 대한 정보와 연구가 적어, 노동생산성 향상을 위한 자원계획과 일정계획 등 생산계획 기법의 개발이 필요하다. 본 연구에서는 해양구조물 건조과정중 모듈조립에 대한 효율적인 생산계획법을 제안하였다. 모듈은 해양구조물의 상부구조에 속하며 바다에서 설치할 때 해상 크레인의 용량제한 때문에 상부구조를 몇 개로 나눈 것이며, 성냥갑 모양이다. 모듈조립에는 구조, 의장, 도장 등 여러 직종의 작업이 동시에 이루어 져야 하고, 작업들이 상호연계되어 있어서 이 들 직종간의 간섭이 있고 한 직종의 작업지연으로 다른 직종의 작업지연을 유발시켜 공정의 흐름이 정체되어 전체공기가 지연되는 사례가 허다하다. 결국 초기의 부적합한 인원투입으로 공사의 말기에 잔업, 철야, 외주 등 집중 인원투입으로 출혈 공기만회에 임하게 된다. 이런 현상은 원천적으로 초기 생산계획시 호환성이 없는 여러 직종의 인원을 동일한 작업자로 간주하고 계획수립을 하는데 기인한다. 모듈조립 공사에 대하여 소요 인력(Manpower)에 대한 표준모델을 설정하여, 직종별 자원분배의 평준화로 최적의 인력을 투입할 수 있는 생산계획법을 제안하고, 일정 기간에 24개의 프로젝트 즉, 72개의 모듈을 처리하는 실제의 예에 대한 생산계획 시스템을 전산화하여 시험함으로써 실용성을 검증하였다. 시험결과 한 프로젝트에 대한 1)공기면에서 18개월에서 16개월로 2개월(11%) 단축, 2)투입인원면에서 총투입 300명에서 208명으로 92명(31%)절감 등을 예상할 수 있었다.

  • PDF

조선소 도장작업 노동자 유기용제 노출과 일간 변이 (Characteristics of Workers'Exposure Concentration and Daily Variations to Organic Solvents in Shipbuilding Painting Processes)

  • 안진수;박두용;강태선
    • 한국산업보건학회지
    • /
    • 제29권4호
    • /
    • pp.488-499
    • /
    • 2019
  • Objectives: This study was conducted to identify the characterization of organics solvent exposure among painting workers in the shipbuilding painting process, especially for their daily variations(within worker variance). Methods: Charcoal passive dosimeters were worn throughout each work shift for 20 days for five painting workers from October 19 to November 26, 2015. A total of 100 samples were collected, analyzed and compared with statutory workplace environmental measurements. Results: The geometric mean(GM) and geometric standard deviation(GSD) of mixed organic solvent(six substances) exposure index(EI) for the 100 samples were 0.42 and 4.42 respectively. The median and range of GSD for within worker EI representing five workers' daily EI variation is 3.72 and 2.63 ~ 5.20, respectively, which is classified as a very large variation(GSD>3). We were able to divide the painting process into two similar exposure groups(SEGs), Touch-up and Spray. Spray painting workers were much more exposed to organic solvent than Touch-up painting workers(GM=0.71 vs. 0.19), but less variably (GSD=3.64 vs. 4.10). xylene is the substance to which the workers were most exposed(GM=16.19 ppm, GSD=4.36), and the exposure characteristics of six substances including xylene is similar to those of EI. Conclusions: The daily variation of organic solvent exposure in the shipbuilding painting process is so high that statutory Assessment of Reliability of Work Environment Monitoring needs to be conducted with statistically sufficient number of samples and evidence.