Experimental Study on the Static Behavior of the Spliced PSC Box Girder (분절 PSC 박스거더의 정적거동에 관한 실험적 연구)

  • Chung, Won-Seok;Kim, Jae-Hueng;Chung, Dae-Ki
    • Journal of the Korea Concrete Institute
    • /
    • v.19 no.4
    • /
    • pp.433-439
    • /
    • 2007
  • The main objective of the paper is to investigate the static behavior of a prestressed concrete (PSC) girder that has been spliced with precast box segments. A 20 m long full-scale spliced PSC girder is fabricated and tested to compare its static performance against a monolithic girder. The monolithic girder has the same geometric and material properties with respect to the spliced girder. This includes infernal strain, deflections, neutral axis position, and crack patterns for both girders. The test also consists of monitoring relative displacements occurring across the joints. Both the horizontal displacement (gap) and vertical displacement (sliding) are measured throughout the loading procedure. All results have been compared to those obtained from the monolithic girder. It has been demonstrated that the spliced girder offers close behavior with respect to the monolithic girder up to the crack load. Both girders exhibits ductile flexural failure rather than abrupt shear failure at joints.

Evaluation of Structural Behavior and Moment of Inertia on Modular Slabs Subjected to Cyclic Loading (반복하중을 받는 모듈러 슬래브의 거동 및 단면2차모멘트 평가)

  • Park, Jongho;Choi, Jinwoong;Lee, Hong-Myung;Park, Sun-Kyu;Hong, Sungnam
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.6
    • /
    • pp.95-102
    • /
    • 2015
  • Recently, the maintenance activity for aging of bridge structures was difficult because of traffic jam, environment pollution and increasing cost. And to solve these problems, modular bridge research has been studied. After static and cyclic loading test was conducted for serviceability and bending performance with one way slab, effective moment of inertia of modular specimen was analyzed to estimate the deflection by KCI(2012). To conduct the test, one integral slab and three modular slabs were made for static loading and one integral and modular slab were made for cyclic. As a result of the test, the modular slab had the similar bending performance of the integral. But the ultimate deflection showed the insufficient which was smaller than 20%. In the cyclic loading test, the modular slab has different behavior of deflection with the integral, so it was evaluated difficult for serviceability. In addition, effective moment of inertia by KCI(2012) was not estimated for modular slab with connection. The new value of m which was ratio between moments is 4.53 based on result of test for predicting deflection of modular.

Lightweight Design of a Modular Bridge for Railway Infrastructure Systems (철도 인프라 적용 교량형 조립식 모듈의 경량화 설계)

  • Im, Jae Moon;Shin, Kwang Bok;Park, Jae Hyun
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.25 no.6
    • /
    • pp.471-478
    • /
    • 2016
  • This paper describes a method to design a lightweight modular bridge for a railway infrastructure system. A lightweight design was achieved using the material selection method. Aluminum extrusions and honeycomb sandwich composites were selected as the best materials to reduce the weight of the upper structure of a conventional modular bridge made of carbon-steel material. The structural integrity of the lightweight modular bridge was evaluated under vertical and wind loads. The twisting and bending natural frequencies were also evaluated to investigate its dynamic characteristics. The results showed that the structural integrity and natural frequencies of the lightweight modular bridge, made of aluminum extrusion and sandwich composites, satisfied the design requirements. Moreover, it was found that the weight of the conventional modular bridge made of carbon steel could be reduced by a maximum of 47% using lightweight materials.

Performance of Precast Composite Piers for Fast Construction (급속시공형 프리캐스트 합성교각의 성능)

  • Shim, Chang-Su;Chung, Young-Soo;Yoon, Jae-Young;Park, Ji-Ho
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.221-224
    • /
    • 2008
  • Recently various types of prefabricated pier has been developed. In this paper, prefabricated composite columns with core steel elements embedded in concrete were proposed, which has no prestressing. Based on the previous research on composite columns with low steel ratio, the column were designed. A simple bolt connection detail between a footing and a pier element were also suggested. In order to investigate the seismic performance of the composite columns, several tests on concrete encased composite columns, which are prefabricated, were performed. Quasi-static tests were carried out and their performance was evaluated and compared with the results from the tests on CIP composite piers. In the case of precast piers, the end part of the pier needs to be carefully reinforced and related recommendations on details were derived.

  • PDF

Development of Time-Cost Trade-Off Algorithm for JIT System of Prefabricated Girder Bridges (Nodular GIrder) (프리팹 교량 거더 (노듈러 거더)의 적시 시공을 위한 공기-비용 알고리즘 개발)

  • Kim, Dae-Young;Chung, Taewon;Kim, Rang-Gyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.3
    • /
    • pp.12-19
    • /
    • 2023
  • In the case of the construction industry, the relationship between process and cost should be appropriately distributed so that the finished product can be delivered at the minimum fee within the construction period. At that time, it should be considered the size of the bridge, the construction method, the environment and production capacity of the factory, and the transport distance. However, due to various reasons that occur during the construction period, problems such as construction delay, construction cost increase, and quality and reliability degradation occur. Therefore, a systematic and scientific construction technique and process management technology are needed to break away from the conventional method. The prefab(Pre-Fabrication) is a representative OSC (Off-Site Construction) method manufactured in a factory and constructed onsite. This study develops a resource and process plan optimization system for the process management of the Nodular girder, a prefab bridge girder. A simulation algorithm develops to automatically test various variables in the personnel equipment mobilization plan to derive the optimal value. And, the algorithm was applied to the Paju-Pocheon Expressway Construction (Section 3) Dohwa 4 Bridge under construction, and the results compare. Based on construction work standard product calculation, actual input manpower, equipment type, and quantity were applied to the Activity Card, and the amount of work by quantity counting, resource planning, and resource requirements was reflected. In the future, we plan to improve the accuracy of the program by applying forecasting techniques including various field data.

Evaluation of Seismic Performance of Prefabricated Bridge Piers with a Circular Solid Section (중실원형단면 조립식 교각의 내진 성능 평가)

  • Kim, Hyun-Ho;Shim, Chang-Su;Chung, Chul-Hun;Kim, Cheol-Hwan
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.11 no.3 s.55
    • /
    • pp.23-31
    • /
    • 2007
  • Fast bridge construction has been increasingly needed according to the changed construction environment. This paper deals with quasi-static tests on precast piers for bridge substructures. One of the most crucial aspect of the design of precast prestressed concrete bridge piers is the seismic performance. Seven precast pier elements were fabricated. The amount of prestressing bars, the prestressing force, and the location and number of the joint between segments were the main test parameters. Test results showed that the introduced axial prestress made the restoration of the deformation under small lateral displacement and minor damage. However, there was no effect of the prestress when the plastic hinge region was damaged severely due to large lateral displacement. Judging from the observed damage, the design of the joints in precast piers should be done for the first joint between the foundation and the pier segment. The amount of the necessary prestressing steel may be designed to satisfy the P-M diagram according to the service loads, not by having the same steel ratio as normal RC bridge piers. In order to satisfy the current required displacement ductility, it is necessary to have the same amount of the transverse reinforcements as RC piers. As the steel ratio increases, the energy absorption capacity increases. The number of joints showed a little influence on the energy absorption capacity.