• Title/Summary/Keyword: 조립식 교량

Search Result 36, Processing Time 0.025 seconds

A Experimental Comparison Study on Structural Behavior of Prefabricated Bridge (조립식 바닥판 교량의 거동에 대한 실험적 비교 연구)

  • Han, Man-Yup;Kim, Seong-Dong;Jin, Kyung-Seok;Kang, Sang-Hun;Cho, Byung-Ku
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.25-28
    • /
    • 2008
  • Currently, the prefabricated bridge having the effects to reduce the term of works and the cost of construction is often studied and countries such as America have already developed members, the parts of it, and the technique of construction. In addition, they have supplied them to the fields. The study of prefabricated method of steel composite bridge, which has the precast deck - plate and main girder fixed by high tension bolt and can resist horizontal sheer, is being progressed. However, it is difficult to understand the characteristics of the prefabricated bridge's behavior when the superstructure of the prefabricated method is analyzed by applying to the analysis model of existing bridges. Therefore, this study has the purpose of understanding real structural behavior of prefabricated bridge through comparison and analysis between the structural analysis model reflecting the characteristics of the real prefabricated bridge's superstructure and real size experiment.

  • PDF

An Experimental Study on Development Connection System of Concrete Barrier in Modular Bridges (조립식교량의 콘크리트 방호울타리 연결시스템 개발을 위한 실험적 연구)

  • Jung, Ho Sung;Lee, Sang Seung;Choi, Jin Woong;Kim, Tae Wan;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.2
    • /
    • pp.49-57
    • /
    • 2012
  • Recently, in field of bridge construction, modular technology has been studied to reduce construction period. However, main stream of the study is limited to the pier, girder and deck of bridge, which are huge or main members. Studies on incidental facilities like concrete barrier is out of sight. Thus, in this study, connection system of concrete barrier was developed to apply to modular bridges and static experiment was performed in order to verify structural capability of proposed system. Variables of experiment are composed of bolt direction such as vertical and horizontal. The experimentation due to the designed variables was conducted by comparison with a standard concrete barrier, which is a traditional barrier. As a result, vertical joint way of the bolt showed nearly identical structural performance and healthy to standard specimen's. it can be applied to modular bridges.

An Experomental Study on the Connection of Diaphragm in Modular Bridge (조립식 교량의 가로보 연결에 관한 실험적연구)

  • Lee, Hyun Ho;Lee, Sang Seung;Cho, Doo Yong;Kim, Tae Wan;Park, Sun Kyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.16 no.2
    • /
    • pp.31-39
    • /
    • 2012
  • Recently new construction and reconstruction of the bridge have been required to minimize traffic congestion, environmental disadvantage, to reduce the period of construction, and to improve the quality and workability during the construction. For this reason, the application of modular bridge system, which is assembly of the structural members, is necessary to prepare for near future. Fall of girders can occur at the moment to connect between precast girders during the construction, so appropriate cross beams should be installed to solve the mentioned problem. In this study, understanding the structural characteristics and domestic and international case of cross beam, alternative cross beam system for modular bridge was developed. To inspect the structural characteristics of the alternative system, specimens were built and static loading test was performed. Afterward, the behavior of cross beam interms of joints and load distribution was observed. Experimental results were analyzed and compared with each data. Therefore, the appropriate cross beam system for modular bridge will be chosen and proposed in this paper.

Design Comparison of Totally Prefabricated Bridge Substructure Systems Designed by Present Design and LRFD Methods (현행설계법 및 하중저항계수설계법에 의한 완전 조립식 교량 하부구조의 설계결과 비교)

  • Kim, Tae-Hoon;Kim, Young-Jin;Shin, Hyun-Mock
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.15 no.2
    • /
    • pp.11-22
    • /
    • 2011
  • The design comparison and nonlinear analysis of totally prefabricated bridge substructure systems are performed. The prefabricated bridge substructures are designed by the methods of present design and load and resistance factor design (LRFD). For the design, the current Korea Highway Bridge Code (KHBD), with DB-24 and DL-24 live loads, is used. This study evaluates the present design method of KHBD (2005) and AASHTO-LRFD (2007) for totally prefabricated bridge substructure systems. A computer program, named RCAHEST (Reinforced Concrete Analysis in Higher Evaluation System Technology), for the analysis of reinforced concrete structures, was used.

A study on behavior for prefabricated precast segment and similar piers (조립식 프리캐스트 세그먼트 교각과 유사형식 교각에 대한 거동에 관한 연구)

  • Jeong, Hyeok-Chang;Kim, Ick-Hyun;Kim, Tae-Hun;Kim, Young-Jin
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.33-36
    • /
    • 2008
  • The present, most of bridges have been constructed with RC piers in Korea. But the construction of bridges with RC piers is limited to certain working environment and weather that give rise to some series trouble such as weak constructability, quality deterioration and rising of the cost of construction. For this reason, the construction tend to focus on the developing of more effective and economical construction methods. Of all methods, prefabricated precast segment piers have been examined more extensively, it has become a solution of some problems like traffic congestion that usual site placing methods have. The Korea government has the already issued specification earthquake effect. But the existing seismic specification are inapplicable to bridges with prefabricated precast segment piers. This study analyzes structural behabviors of the RC model, prestressted pier moel, the prefabricated precast segment pier with no shearduct model and the prefabricated segment piers with shearduct and changed post tensioning force.

  • PDF

A Computational Platform for Nonlinear Analysis of Totally Prefabricated Bridge Substructure Systems (완전 조립식 교량 하부구조의 비선형해석을 위한 전산플랫폼)

  • Kim, Tae-Hoon;Shin, Hyun-Mock
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.639-642
    • /
    • 2011
  • 이 연구에서는 완전 조립식 교량 하부구조의 비선형해석을 위한 전산플랫폼을 개발하였다. 완전 조립식 교량 하부구조의 비선형거동을 정확하게 파악하고 합리적이면서 경제적인 설계기준의 개발을 위한 자료를 제공하는데 그 목적이 있다. 재료적 비선형성에 대해서는 균열콘크리트에 대한 인장, 압축, 전단모델과 콘크리트 속에 있는 철근모델을 조합하여 고려하였다. 사용된 부착 또는 비부착 텐던요소는 유한요소법에 근거하며 프리스트레스트 콘크리트 부재의 콘크리트와 텐던의 상호작용을 구현할 수 있다. 그리고 접합면요소는 세그먼트 접합부의 비탄성거동을 예측할 수 있다. 제안된 해석기법은 수치예제에 대하여 비선형거동을 비교적 정확하게 예측하였다.

  • PDF

A Study on the Static Behavior of GFRP Bridge Deck (GFRP 교량 바닥판의 정적거동에 관한 연구)

  • Ji, Hyo Seon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.3
    • /
    • pp.163-170
    • /
    • 2011
  • A concept of Modular GFRP(Glass Fiber Reinforced Polymer) deck panel was proposed for bridge decks. The modular GFRP bridge deck system is comprised of main unit module and connector unit module with GFRP flanges and web. Its structural performance under static loading was evaluated and compared with the LUSAS finite element predictions. It was found that the presented GFRP modular panel was very efficient for use in bridges. The failure mode of the proposed GFRP deck was similar when compared with that of commercial other GFRP decks developed.

The Composite Behaviors of Fabricated Concrete Deck Simple Bridges (바닥판조립식 단순보교량의 합성거동에 관한 연구)

  • 구민세;장성수;윤우현
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.12 no.4
    • /
    • pp.525-535
    • /
    • 1999
  • In this study, a new method of fabricated concrete deck bridge construction is proposed. This paper details the method in which concrete multi-girders and fabricated concrete decks are rested on the upper flange of the girder and the female to female type sheat-key is formed to connect girder and deck. The finite element analysis is performed to verify the accuracy of the structural behaviors of the fabricated concrete deck bridge by comparing with experimental results. The first task performed is the analysis of the equilibrium of the member force occurring between the deck and the girder. After verifying equilibrium of the member force determined by the finite element analysis, this process is applied to the analysis of maximum member force as the position of design load. This task is utilized to determine the safety of each member according to the same scale finite element model. The final process in this study is to compare the deflection of girders used in experiment with that of the same scale finite element model to verify the strength of fabricated cincrete deck bridge. By this comparison, it is shown that the behavior of the fabricated concrete deck bridge is almost same as the finite element analysis. The second task is to analyze the load distribution effect according to the number of diaphragms and the composite effect due to the cinnection of the deck and girder by the finite element analysis. From the results of second task, it is found that the load distribution effect is not related to the number of diaphragms in case of the central loading, but is related to the number of diaphragms for eccentric loading. Analysis of the load distribution indicates that the effective number of diaphragm is three. It is also shown that the maximum deflection is decreased to almost one half due to the composite action of the deck and girder.

  • PDF