• Title/Summary/Keyword: 조림사업

Search Result 69, Processing Time 0.027 seconds

Feasibility Study on Small-scale A/R CDM Pilot Project in Mongolia (몽골 소규모 A/R CDM 시범사업 타당성 평가연구)

  • Cha, Junhee;Park, DongKyun;Lee, Jong-Hak;YOUN, Yeo-Chang;Choi, Jun-Seok
    • Journal of Korean Society of Forest Science
    • /
    • v.100 no.4
    • /
    • pp.698-707
    • /
    • 2011
  • Over the past 10 years, South Korea has implemented various plantation projects including the Pine Restoration Project in Tujiin Nars and the desertification prevention forestation in Lun soum. This study has evaluated the implementation feasibility on the small-scale A/R CDM projects in Mongolia through which carbon emission credits can be secured. Characteristics, pros and cons, economic feasibility, and project execution feasibility were compared among three possible sites, Khyalganat, Tujiin Nars, and Lun soum. Among the three evaluated sites, Tujiin Nars has the better condition in tree growth, economic feasibility, and the applicability of experience than the other two sites. A/R CDM project in Mongolia, which has a great environmental benefit of combating desertification, is expected to have some effectiveness such as lowering costs from credit benefit, sustainable management by villagers, contribution to communities, investor's contribution to society and achievement of green image, and strengthening forestry cooperation between Korea and Mongolia.

기고문 - 조경수 배치 설계사 양성과 경관 상품 개발

  • Ma, Sang-Gyu
    • Landscaping Tree
    • /
    • s.119
    • /
    • pp.8-11
    • /
    • 2010
  • 국가 발전과 국민생활수준 향상으로 조경수를 이용한 경관조림이 생태공원, 도시숲, 학교숲. 거리숲 등의 이름으로 확대되어가는 현상을 보게 된다. 경관조림지를 보면서 행정가의 눈에 의한 행정적 조림, 작업원의 눈에 의한 사업적 조림은 있으나 전문가에 의한 경관조림기술이 부족하다는 것을 느끼곤 하였다. 수많은 조경수들 중에서 본연의 형태와 생태적 요구 특성에 알맞고, 입지특성 및 지역의 문화사회적 특성을 고려한 수종을 선택하고 배치하는 일은 물론 쉬운 일은 아닐 것이다. 그러나 경관조성과 관리사업에 대한 사회적 수요는 지속적으로 늘어날 전망이고, 경관의 질도 향상시켜 나감은 물론 경관조성사업의 투자 효율도 증대시키는 측면에서 조경수 배치 설계사 양성의 필요성을 제안해 보고자 한다.

  • PDF

Afforestation Effect Analysis Using MODIS Imagery: Yulin, Shaanxi, China As a Case Study (MODIS 영상을 이용한 중국 산시성 위린시의 조림 효과 분석)

  • Jang, Hyo-Seon;Kim, Sang-Pil;Kim, Mi-Kyeong;Sohn, Hong-Gyoo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.4
    • /
    • pp.1007-1013
    • /
    • 2015
  • Desertification in China, one of the source regions of yellow dust, has been worsen by industrialization and extreme land development, which increases the damage caused by yellow dust in Korea. Because the yellow dust from China affects not only their own country, but also neighboring countries, it is becoming an international problem, and China has been started afforestation projects to prevent excessive desertification with the help of the international community. However, it is only possible for identifying the results of afforestation projects to check afforestation result reports from National Bureau of Statistics of China, which makes it difficult to check out tangible results. Therefore, this study was conducted by using remote sensing technique for monitoring afforestation status of Yulin, shaanxi, China. in which an afforestation project has been carried out steadily. MODIS imagery was used as remote sensing data and it was confirmed that vegetation has been increased through vegetation indices from 2000 to 2014 and afforestation areas were estimated as same trend of ground reference data.

An Economic Analysis of Industrial Forest Plantation and A/R CDM Project in Indonesia (인도네시아에서의 산업조림과 A/R CDM 사업 경제성 분석)

  • Park, Chongho;Kwon, Kiwon;Kim, Sebin
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.348-356
    • /
    • 2007
  • The purpose of this study is to give the results of economic feasibility of industrial forest plantations, and also A/R CDM project in Indonesia to investors. In order to analyze economic feasibility of the industrial forest plantation and A/R CDM project, this study comparatively analyzes the feasibility based on three following scenarios: industrial plantation type; A/R CDM type; combination type of industrial plantation and A/R CDM project. In the aspect of IRR, the combination type has 11 % while the industrial plantation type has 8%. If the price of timber increases USD $5/m^3$ (from the standard price: USD $30/m^3$ to USD $35/m^3$), IRR of the industrial plantation type will increase from 8% to 14%. This result shows us that the IRR of the industrial plantation type is very sensitive to the price of timber. There is no economic feasibility of A/R CDM project if the price of lCER is under USD 5. In addition, IRR of the A/R CDM project type is the same to IRR of industrial plantation type (8%) when the price of lCER is USD 10. Finally, the total investment expenditure on 12,000ha of the combination type is approximately 13 billion won while the industrial plantation type is 13.6 billion won. It takes 11 year to reach the turning point in terms of profitability of the combination type while the industrial plantation takes 13 year. Thus, the economic feasibility of the combination type is higher than the other types(industrial plantation type and A/R CDM project type).

An Economic Feasibility Study of AR CDM project in North Korea (북한 지역을 대상으로 한 조림 CDM 사업의 경제적 타당성 연구)

  • Han, Ki Joo;Youn, Yeo-Chang
    • Journal of Korean Society of Forest Science
    • /
    • v.96 no.3
    • /
    • pp.235-244
    • /
    • 2007
  • Potentials of AR CDM project in North Korea are assessed and feasible land area for AR CDM project is estimated. According to our estimation, There could be 515,000 hectares of forest lands deforested before 1990 in North Korea and 8,854 hectares at the regional level of Gae-sung City, which are eligible for AR CDM project, based on researches of satellite image analyses conducted from 1980's to 1990's. A baseline scenario assumed 44.73 tones of carbon stored in soil per hectare with no vegetation above ground remained during the project period following the default value of IPCC's Good Practice Guidance for LULUCF considering soil structure, climate and land use of the project area. The scenario also assumes that black rocust (Robinia pseudoacacia) is planted and the CDM project is implemented for 20 years. The costs for producing greenhouse gases CER (certified emission reduction) credits include costs of tree planting and forest management, and costs of project negotiation and transactions for issuing the credits. It is estimated that 376 tones of carbon dioxide per hectare can be accumulated and 503 temporary CER credits per hectare and 265 long-term CER credits per hectare could be produced during the project period. It is estimated to cost US$ 4.04 and US$ 7.67 to provide one unit of temporary credit and long-term credit, respectively. These values can be regarded as the cost of conferring emission commitment of a country or a private entity. However, it is not clear which option is better economically because the replacement periods are different in these two cases.

Analysis of the Current Status of Weeding Operation and Crop Tree Growth Across Planting Periods (전국 풀베기사업 현황분석 및 연차별 조림목 생장 연구)

  • Park, Byung Bae;Seo, Jeong Min;Han, Si Ho;Youn, Woo Bin;Jung, Yeon Kuk;Namgung, Bo Sun;Lee, Sang Jic;Lee, Sang Ick
    • Journal of Korean Society of Forest Science
    • /
    • v.109 no.2
    • /
    • pp.179-188
    • /
    • 2020
  • Weeding refers to the process of removing weeds around crop trees, which cause competition in nutrients, moisture, and light, and has a great effect on the early growth and survival of crop trees for establishing forest resources. This study was conducted to find out the timing and method of weeding that is the most suitable for the major afforestation species in national forests. We investigated (1) weeding time and frequency for each afforestation species and (2) the height of crop trees and the length of weeds. Up to 99% weeding operation was carried out until 5 years following afforestation. Pinus densiflora, Larix kaempferi, Chamaecyparis obtusa, Prunus sargentii, and Betula platyphylla plantations accounted for more than 70% of the total weeding sites. Once-a-year weeding process was conducted from late June to late July (67%), and twice-a-year weeding process was the highest in June-August by 31%. Most species were shorter than the weeds until the first and second year of planting, but the height of the crop trees was higher than that of the weeds by 48% in average from the third year. Therefore, from the third year of afforestation, except for some species, it is possible to reduce the cost of weeding operations while reducing nutrient competition by the weeds through the removal of weed sprouts, mainly woody weeds, rather than clear cutting. This study contributes to efficiently develop forest resource establishment while reducing operational costs through a detailed weeding schedule and species-specific method.

A Study on Greenhouse Gas Removals Estimation of a Small Scale Afforestation/reforestation CDM Pilot Project in Goseong, Gangwon Province (강원도 고성군 소규모 신규조림/재조림 CDM 시범사업의 온실가스 감축량 산정 연구)

  • Kim, Jiyeon;Lee, Sue Kyoung;Noh, Nam Jin;Yoon, Tae Kyung;Han, Saerom;Cui, Guishan;Lee, Woo-Kyun;Son, Yowhan
    • Journal of Korean Society of Forest Science
    • /
    • v.102 no.3
    • /
    • pp.398-406
    • /
    • 2013
  • Afforestation/reforestation (A/R) clean development mechanism (CDM) is the only forestry-based activities allowed under the Kyoto protocol. This study was conducted to develop a methodology to estimate greenhouse gas (GHG) removals of a small scale A/R CDM pilot project in Goseong, Gangwon Province, Korea. AR-AMS0001 was applied as a methodology and selected tree species were Pinus koraiensis, Larix kaempferi, and Betula platyphylla for total area of 75.0 ha. To improve the accuracy on the GHG removals estimation, selection of the baseline scenario and carbon pools and stratification of the project site were conducted. Based on the developed methodology, net anthropogenic GHG removals were estimated as actual net GHG removals, subtracted by baseline net greenhouse gas removals and leakage. As a result, anthropogenic GHG removals of the project were 12,415 ton $CO_2-e$ and 165.5 ton $CO_2-e/ha$. This project is the first A/R CDM in domestic site and could enhance the technical accuracy of the GHG removals estimation by using countryspecific data reflecting the site condition.