• Title/Summary/Keyword: 정상교통류

Search Result 32, Processing Time 0.015 seconds

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

Analytical Study of Delay Model of Traffic Signal Progression Evaluation on Arterial (간선도로 신호연동화 효율의 평가를 위한 지체도 모형의 해석적 연구)

  • 김영찬;황연하
    • Journal of Korean Society of Transportation
    • /
    • v.17 no.1
    • /
    • pp.131-139
    • /
    • 1999
  • The quality of progression at signalized intersection has the largest potential effect. TRANSYT-7F is widely used to estimate the signal progression delay, but the progress of collecting and executing the compute program appears to be rather cumbersome. The research is to develop the analytical and progressing platoon delay model that is as simple as the methodology of HCM and familiar with the output of simulation model. The general approach to this research was conducted to examine the Rouphail and NCHRP 339 methodology together with the existing progression delay model (TRANSYT-7F. HCM). The scope is contained to be applicable only to cycles with no overflow queue and to obtain a comprehensive evaluation of the effects of changes in the quality of traffic signal progression on stopped delay and to be analyzed a simple mathematical method. The principle assumption for this model is that secondary flows is dispersed and partly mixed with average flow of the primary progressed flow. A second assumption is that through flow is consisted with the part of saturation flow at the front of it and the part of average flow at the rear of it. The delay equations vary for two arrival. The conclusion of this study could be summarized as 1)The evaluation of this model was consistently similar to that of TRANSYT-7F, 2) Platoon pattern has the real traffic flow characteristics. 3) The computing process of progression delay is made to have simple logic and easy calculation by integration, 4) This model could be estimated to be applied in almost all case.

  • PDF