Derivation of rock parameters from Televiewer data (텔레뷰어에 의한 토목설계 매개변수의 산출)

  • Kim Jung-Yul;Kim Yoo-Sung
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 1999.08a
    • /
    • pp.137-155
    • /
    • 1999
  • Recently, Televiewer(Borehole Acoustic Scanner(Televiewer)) has come to be widely used specially for the general engineering construction design. The Televiewer tool using a focussed acoustic beam is to detect the amplitude and traveltime of each reflected acoustic signal at the wall, resulting in the amplitude- and traveltime image respectively. Fractures can be well detected, because they easily scatter the acoustic energy due to the highly narrow beam. In addition, the drilling work will rough the borehole wall so that the acoustic energy can be scattered simply due to the roughness of the wall. Thus, the amplitude level can be directed associated with the elastic properties(impedance) and the hardness of the rock as well. Meanwhile, the traveltime image provides an information about the borehole shape and can be converted to a high precision 3D caliper log(max. 288 arms). In this paper, based on the high resolution of Televiewer images, general evaluation methods are illustrated to derive very reliable rock parameters.

  • PDF

A Study on the Correlation Between Electrical Resistivity and Rock Classification (전기비저항과 암반분류의 상관관계에 대한 고찰)

  • Kwon, Hyoung-Seok;Hwang, Se-Ho;Baek, Hwan-Jo;Kim, Ki-Seog
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.4
    • /
    • pp.350-360
    • /
    • 2008
  • Electrical resistivity is one of physical property of the earth and measured by electrical resistivity survey, electrical resistivity logging and laboratory test. Recently, electrical resistivity is widely used in determination of rock quality in support pattern design of road and railway tunnel construction sites. To get more reliable rock quality data from electrical resistivity, it needs a lot of test and study on correlation of resistivity and rock quality. Firstly, we did rock property test in laboratory, such as P wave velocity, Young's modulus, uniaxial compressive strength (UCS) and electrical resistivity. We correlate each test results and we found out that electrical resistivity has highly related to P wave velocity, Young's modulus and UCS. Next, we accomplished electrical resistivity survey in field site and carried out electrical resistivity logging at in-situ area. We also performed rock classification, such as RQD, RMR and Q-system and we correlate electrical resistivity to RMR data. We found out that electrical resistivity logging data are highly correlate to RMR. Also we found out that electrical resistivity survey data are lower than electrical resistivity logging data when there are faults or fractures. And it cause electrical resistivity survey data to lowly correlate to RMR.

Rock Mechanics Modeling of the Site for the 2nd Step Construction of the KAERI Underground Research Tunnel (KURT) (KURT 2단계 건설부지에 대한 암석역학모델 설정)

  • Jang, Hyun-Sic;Ko, Chi-Hye;Bae, Dae-Seok;Kim, Geon-Young;Jang, Bo-An
    • The Journal of Engineering Geology
    • /
    • v.24 no.2
    • /
    • pp.247-260
    • /
    • 2014
  • Rock masses at the site for the $2^{nd}$ step construction of the KAERI Underground Research Tunnel (KURT) are divided into six units to establish a rock mechanics model that is dependent on the geological characteristics and degree of joint development. The site primarily consists of three granitic units (G1, G2, and G3), two dykes (D1 and D3), and a fault zone of poor rock mass quality (F3). The F3 unit crosses the tunnel at the beginning of the site of $2^{nd}$ step construction. The rock masses of each unit are classified by RMR (Rock Mass Rating), Q-system, and RMi (Rock Mass Index), all based on borehole logging data. The deformation modulus, rock mass strength, cohesion, and friction angle for each unit are calculated using established empirical relationships. The representative rock mass classification and geotechnical parameters for the rock mass units are established, and a rock mechanics model for the site is proposed, which will be useful in the design and stability analysis of the $2^{nd}$ step construction of KURT.

Evaluation of Cave-in Possibility of a Shallow Depth Rock Tunnel by Rock Engineering Systems and Uumerical Analyses (암반공학시스템과 수치해석을 이용한 저심도 암반터널에서의 붕락 발생 가능성 평가)

  • Kim, Man-Kwang;Yoo, Young-Il;Song, Jae-Joon
    • Tunnel and Underground Space
    • /
    • v.19 no.3
    • /
    • pp.236-247
    • /
    • 2009
  • Overpopulation has significantly increased the use of underground spaces in urban areas, and led to the developments of shallow-depth underground space. Due to unexpected rock fall, however, it is very necessary to understand and categorize the rock mass behaviors prior to the tunnel excavation, by which unnecessary casualties and economic loss could be prevented. In case of cave-in, special attention should be drawn since it occurs faster and greater in magnitude compared to rock fall and plastic deformation. Types of cave-in behavior are explained and categorized using seven parameters - Uniaxial Compressive Strength (UCS), Rock Quality Designation (RQD), joint surface condition, in-situ stress condition, ground water condition, earthquake & ground vibration, tunnel span. This study eventually introduces a new index called Cave-in Behavior Index (CBI) which explains the behavior of cave-in under given in-situ conditions expressed by the seven parameters. In order to assess the mutual interactions of the seven parameters and to evaluate the weighting factors for all the interactions, survey data of the experts' opinions and Rock Engineering Systems (RES) were used due to lack of field observations. CBI was applied to the tunnel site of Seoul Metro Line No. 9. UDEC analyses on 288 cases were done and occurrences of cave-in in every simulation were examined. Analyses on the results of 288 cases of simulations revealed that the average CBI for the cases when cave-in for different patterns of tunnel support was estimated by a logistic regression analysis.

The Prediction of Ground Condition ahead of the Tunnel Face using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 터널막장 전방 지반 상태의 예측)

  • You Kwang-Ho;Song Han-Chan;Kim Ki-Sun;Lee Dae-Hyuck;Park Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.14 no.6 s.53
    • /
    • pp.440-449
    • /
    • 2004
  • Rock mass includes natural discontinuities such as joints and faults during its formation. Discontinuities are also referred as planes of weakness because of their weak mechanical characteristics. In the design of underground structures, it is necessary to consider the properties of discontinuities to insure the stability. During the excavation of a tunnel, these discontinuities have to be identified as early as possible so that proper change in excavation method or support design can be made accordingly. The excavation of the tunnel in a stable rock mass causes a 3-dimensional arching effect around the excavation face. It was revealed by previous studies that the existence of a weak zone or a fault zone ahead of tunnel foe induces a typical displacement tendency of convergence. For better understanding of the meaning of influence/trend lines of various displacement components, three-dimensional numerical analyses were conducted while varying deformation moduli, thicknesses and orientations of discontinuities. Numerical results showed that the changes in influence/trend lines of various displacement components were very similar to those by measurements. The discrepancies from the expected values were dependent on the physical properties, thicknesses and orientations of discontinuities.

Time-dependent Reduction of Sliding Cohesion due to Rock Bridges along Discontinuities (암석 브리지에 의한 불연속면 점착강도의 시간의존성에 관한 연구)

  • 박철환;전석원
    • Tunnel and Underground Space
    • /
    • v.14 no.3
    • /
    • pp.167-174
    • /
    • 2004
  • This paper is to introduce an article published in Rock Mechanics and Rock Engineering, 2003. In this research, a fracture mechanics model is developed to illustrate the importance of time-dependence far brittle fractured rock. In particular a model is developed fer the time-dependent degradation of rock joint cohesion. Degradation of joint cohesion is modeled as the time-dependent breaking of intact patches or rock bridges along the joint surface. A fracture mechanics model is developed utilizing subcritical crack growth, which results in a closed-form solution for joint cohesion as a function of time. As an example, a rock block containing rock bridges subjected to plane sliding is analyzed. The cohesion is found to continually decrease, at first slowly and then more rapidly. At a particular value of time the cohesion reduces to value that results in slope instability. A second example is given where variations in some of the material parameters are assumed. A probabilistic slope analysis is conducted, and the probability of failure as a function of time is predicted. The probability of failure is found to increase with time, from an initial value of 5% to a value at 100 years of over 40%. These examples show the importance of being able to predict the time-dependent behavior of a rock mass containing discontinuities, even for relatively short-term rock structures.

Load Transfer Mechanism of Drilled Shafts in Weathered Rock (풍화된 암반에 근입된 현장타설말뚝의 하중전이기구)

  • ;Cho Sung-Min;Jung Sung-Jun;Kim Myoung-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.187-196
    • /
    • 2005
  • Since the allowable bearing capacities of piles in weathered/fractured rock are mainly governed by settlement, the load-displacement behavior of pile should be known accurately. To predict pile head settlement at the design stage, the exact understanding of the load-transfer mechanisms is essential. Therefore, in this research, the load-transfer mechanism of drilled shaft socketed into weathered rock was investigated. For the investigation, five cast-in-place concrete piles with diameters of 1,000 mm were socketed into weathered gneiss. The static axial load tests and the load-transfer measurements were performed to examine the axial resistant behavior of the piles. A comprehensive field/laboratory testing program on weathered rock at the Held test sites was also performed to describe the in situ rock mass conditions quantitatively. And then, the effect of rock mass condition on the load transfer mechanism was investigated. The f-w (side shear resistance-displacement) curve of the pile in moderately weathered rock reached to yielding point at a for millimeter displacements, and after yielding point, the rate of resistance increment dramatically decreased. However, the f-w curve in the highly/completely weathered rock did not show the obvious yielding point, and the resistance gradually increased showing the hyperbolic pattern until relatively high displacement (>15 mm). The q-w (end bearing resistance-displacement) curves showed linear response at least until the base displacement of approximately 10 mm, regardless of rock mass conditions.

The Improvement of Excavation Efficiency of Roadheader by Using Pre-Cracked Method in High Strength Rock (선균열공법을 활용한 고강도 암반구간 로드헤더 굴진효율 향상방안 연구)

  • Hyung-Ryul Kim;Sang-Jun Jung;Jun-Ho Kang
    • Tunnel and Underground Space
    • /
    • v.33 no.3
    • /
    • pp.141-149
    • /
    • 2023
  • Recently, as the demand for urban underground space increases, urban tunnel planning is actively progressing. In particular, the application of the roadheader excavation method, which has favorable applicability to urban tunnel, is increasing. However, it is known that the roadheader excavation method has a limitation in that excavation efficiency for high strength rock with a Uniaxial Compressive Strength (UCS) of 100 MPa or more is lowered. In this study, The pre-cracked method was presented as a method to improve the excavation efficiency of roadheader for high strength rock and its applicability was evaluated. The net cutting rate was evaluated using the Bilgin prediction formula, which can calculate the net cutting rate by considering the UCS and RQD (Rock Quality Designation). It was found that the net cutting rate increased as the RQD decreased under the rock condition with the same UCS. This is judged to increase the excavation efficiency of the roadheader in the jointed high strength rock. Additionally, the field applicability of the pre-cracked method for high strength rock was verified through field tests. It was confirmed that the crack zone was formed around the charging hole, and it is considered that the pre-cracked method can be applied to the high strength rock.

Estimation of the Shaft Resistance of Rock-Socketed Drilled Shafts using Geological Strength Index (GSI를 이용한 암반에 근입된 현장타설말뚝의 주면저항력 산정)

  • Cho, Chun Whan;Lee, Hyuk Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1C
    • /
    • pp.25-31
    • /
    • 2006
  • It is common to use the unconfined compressive strength (UCS) of intact rock to estimate the shaft resistance of rock socketed drilled shaft. Therefore the most design manuals give a guide to use the UCS of rock core to estimate the shaft resistance of rock-socketed drilled shaft. Recently, however the design manuals for highway bridge (KSCE, 2001) and of AASHTO (2000) were revised to use the UCS of rock mass with RQD instead of the UCS of rock core so that the estimated resistance could be representative of field conditions. Questions have been raised in application of the new guide to the domestic main bed rock types. The intrinsic drawbacks in terms of RQD were comprised in the questions, too. As the results, in 2002 the new guide in the design manual for highway bridge (KSCE, 2001) were again revised to use the UCS of rock core to estimate the shaft resistance of rock-socketed drilled shafts. In this paper, various methods which can estimate the UCS of rock mass from intact rock core were reviewed. It seems that among those, the Hoek-Brown method is very reliable and practical for the estimation of the UCS of rock mass from rock cores. As the results, using the Hoek-Brown failure criterion a modified guide for the estimation of the shaft resistance of rock-socketed drilled shafts was suggested in this paper. Through a case study it is shown that the suggested method gives a good agreement with the measured data.