This Study analyzes the predictability of accounting information from mandatory K-IFRS adoption using the K-IFRS reconciliations information. We use the sample of 2,557 firm-year Korea listed companies belonging to non-financial corporate sector during 2010-2016. Specifically, we examine whether K-IFS reconciliation would improve or reduce the predicting power for future earnings after K-IFRS adoption. The results of empirical analyses show that reconciliation information from discretionary judgement tend to reduce the predicting power of K-IFRS based accounting earnings for future earnings. This result indicates that managers are likely to use the adjustments process to reconcile K-GAAP accounting numbers with corresponding K-IFRS as means to realize the various private utility. This study is expected to provide useful information by suggesting the need for more rigid screening schemes for the K-IFRS reconciliation process and also for adequate measures to be taken to ensure that the interests of the outside investors are properly protected.
Proceedings of the Korea Water Resources Association Conference
/
2018.05a
/
pp.84-84
/
2018
본 연구는 두만강 유역국가(북한, 중국, 러시아) 및 인접국가(한국, 몽골, 일본) 간의 협력과정과 현안을 1991년부터 현재까지 광역두만강개발계획(Greater Tumen Initiative: GTI)을 통해 검토함으로써 동아시아에서 지역개발계획을 통한 공동의 이익창출과 공유가능성을 짚어보고 정책적 시사점을 찾고자 한다. 분석이론으로 이익공유(Benefit Sharing)이론을 적용하여 국제하천에서 한 유역국가가 독단적인 계획과 사업을 통하여 얻는 이익보다 모든 유역국가의 참여를 바탕으로 추진하는 지역개발을 통한 이익이 더 크다는 점을 확인하고자 한다. 두만강 유역은 1991년 UNDP 주도 하에 두만강지역개발프로그램(Tumen River Area Development Program: TRADP)을 시작으로 지역개발협력이 진행되어 2005년 광역두만강개발계획으로 발전되었으나 2009년 북한의 GTI 탈퇴, 리더쉽 부재, 재원부족 등으로 현재 답보 상태에 빠져있는 실정이다. 그럼에도 불구하고 프로그램 진행 과정 속에서 회원국 간의 공통 관심사항을 도출하고 직간접적으로 동아시아 평화안보 구축에 도움을 주었으며 교통, 물류, 에너지, 관광 및 환경 관련 사업을 추진하여 동아시아 공동 지역개발의 단초를 마련하는 성과를 거두었다. 아직 풀어가야 할 숙제가 많지만 GTI는 2014년 이후 본격으로 추진하고 있는 국제기구로의 전환을 통해 새로운 전기를 마련하고자 노력하고 있다. 또한 GTI는 북한 핵무기 개발과 미사일 발사 등으로 경직되어있는 동북아 상황을 완화하고 현 정부의 신북방정책의 발전을 위한 교두보 역할을 할 수 있을 것이며 역내 국가 간 협력을 지속적으로 추진할 수 있는 밑바탕이 될 수 있을 것이다.
This study analyzes the military and political factors that influenced the Participatory Government's resolution in Wartime Operational Control (OPCON) Transition. The research on key factors in OPCON transition firstly implemented literature research and then increased feasibility through additional use of AHP. The analysis results showed that there was a negative effect for Korean Peninsular Defense in the 'ROK-US Alliance Asymmetry' area, a positive effect to increase ROK-led Capability of Theater Operation in the 'ROK and U.S. Alliance Interdependence' area and a positive effect for Invocation of ROK Self-Defense Power in the 'Interests of Participatory Government's Liberal Regime' area respectively. After applying AHP, "ROK exercise of Self-defense" in the 'Interests of Participatory Government's Liberal Regime' area received the highest assessment, while the "Increasement of North Korea's Threat" in the 'ROK-US Alliance Asymmetry' area received the lowest assessment. This study is meaningful in that it analyzed the key military and political factors in the Participatory Government's resolution of Wartime OPCON Transition using AHP.
세계적으로 화학, 생물학 및 방사능 무기의 근절을 위해 CWC와 같은 여러 가지 국제조약이 결성되고 있으나 힘의 논리와 자국 이익의 논리가 앞서는 한 근본적인 근절은 어려운 실정이다. 이 글에서는 화생방전의 피해를 최소화하기 위한 통합 시스템을 소개하고 각 시스템에서 필요한 기술을 나열하였다. 특히 이러한 기술들 중에서 많은 부분이 원자력 분야에서 개발되었으나 개발 중이어서 군용으로의 전환이 용이할 것으로 기대된다.
Proceedings of the Korean Operations and Management Science Society Conference
/
2004.10a
/
pp.603-606
/
2004
본 연구는 반도체 검사공정 중의 하나인 MBT 공정의 Rework 투입정책에 관한 연구이다. MBT 공정에서는 제품의 신뢰성과는 상관없이 설비오류로 인한 불량품이 다량으로 발생한다. 이러한 불량품을 MBT 공정의 재검사 작업인 Rework을 통해 양품으로 전환하게 된다. MBT 공정의 Rework은 FAB 공정 이후의 많은 공정을 거치지 않고 단일공정 진행으로 새로운 양품을 얻을 수 있는 이점을 가진다. 반면에 Rework 비용 및 공정재고비용이 발생하는 특징이 있다. 현재 MBT 공정의 Rework 작업은 정해진 규칙 없이 작업자 경험에 의존하여 진행하며, 제품의 중요도 및 재고량에 따라 투입이 정해진다. 또한 주문 작업의 투입일정과 납기를 고려하지 않은 Rework 작업으로 인해 납기차질이 발생하기도 한다. 본 연구에서는 Rework 작업이 생산계획에 영향을 주지 않는 범위 안에서의 투입계획을 제안한다. 또한 MBT 공정의 Rework 이익인 제조원가 절감이익과 비용인 Rework 비용, 재고비용을 고려한 Rework 제품 투입정책을 제안한다.
One form of the anomalies of stock price changes as reaction to earnings information is believed to be caused by the so-called earnings fixation, which is the overreaction of stock prices to earnings. According to the Sloan (1996) study, stock price changes are positively associated with earnings at the time of earnings releases, but the association becomes negative after that, as the early overreaction is corrected. However, the problem in his study is to use cash flows computed by adjusting earnings with appropriate income statement and balance sheet items. As Bahnson et al. (1996) show, these cash flows substantially deviate from SFAS No. 95 cash flows and the sample used in this study is found to be subject to this substantial measurement error. Therefore, the result of Sloan might be driven by this error and the reexamination of earnings fixation is warranted. The results are generally consistent with those in Sloan. First, earnings is positively associated with stock price changes at the time of earnings releases, but the association becomes negative after that. Second, cash flows show a weak association with stock price changes at the time of earnings releases, but the association become stronger thereafter. Third, when seperated from cash flows, accruals have an incremental explanation about stock price changes beyond that of cash flows, accruals have a negative association later on. This finding is consistent with stock price overreaction to accruals, even when more cleaner cash flow data are used.
Journal of the Korean Society of Hazard Mitigation
/
v.8
no.4
/
pp.61-66
/
2008
As the water distribution system which is one of the critical lifeline system is deteriorated and pipe failures occur frequently, the more efficient pipe monitoring system becomes a critical issue in the water industry. One of the pipe monitoring systems is called "Smart-pipe System" which is permanent, comprehensive and an automated SIM (Structural Integrity Monitoring) system and has superiorities to existing monitoring system. To implement a smart-pipe system on a water distribution system, assessment of its indirect benefit obtaining from smartpipe such as the ratio of preventing water main failures must be preceded. However, only some researches on this field have been performed. In this paper, the concept of smart-pipe system is compared with the current monitoring systems for a water distribution system, and a method to quantify its benefit using the inconvenient time for customers is suggested. The suggested method was applied to a real water distribution system to estimate its applicability and benefit.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.