• Title/Summary/Keyword: 전환기

Search Result 420, Processing Time 0.028 seconds

The Site Installation Test of Single-Phase MJ81 Switch Point Machine Localization (단상 MJ81 전기선로전환기 국산품의 현장설치시험)

  • Baek, Jong-Hyen;Kim, Yong-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.12
    • /
    • pp.3632-3637
    • /
    • 2009
  • In this paper, we describe the performance results of the field installation test which is required to practicalize the single-phase MJ81 Switch Point Machine. This product has passed the certified test through performance improvement of driving parts in order to use 3 phase MJ81 Switch Point Machine, which is localized by taking over technology from Alstom and Cogifer when constructing Seoul-Busan rapid-transit railway, without change of the electrical equipment at track-side in domestic existing lines which single-phase 220V is used. KRRI and Samsung SDS have localized the single-phase MJ81 Switch Point Machine to improve the speed and safety of the conventional lines through the existing railway technology development project. For practicalization of this, we should, however, verify the performance through not only field installation test in real lines but also interface test with the interlocking. In this paper we verify the practicality of the domestic single-phase MJ81 Switch Point Machine through analysis on the performance result of the field installation test as well as the research contents for this test. Thereby, in Feb 2009 we have received an order from the Korea Rail Network Authority and are currently installing the single-phase MJ81 Switch Point Machine.

A Study on the Improvement of Reliability of Line Conversion Monitoring System using CCTV Camera (CCTV카메라를 활용한 선로전환감시시스템의 신뢰성 향상에 관한 연구)

  • Moon, Chae-young;Kim, Se-min;Ryoo, Kwang-ki
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2019.05a
    • /
    • pp.400-402
    • /
    • 2019
  • The electric point machine, which is used for the control of the turnout used to change the track of the train, is very important in the railway system. Various wired and wireless real-time monitoring systems are used to check the status of the point machine, but there is a possibility of malfunction due to sensor or network error. In this paper, a redundant monitoring system was designed that incorporates the point machine monitoring system and the CCTV camera control system to double check the operation of the point machine. In the point machine monitoring system, the operating state of the railway converter is monitored, alarmed and transmitted over the network. The CCTV camera control system, which received this information, was required to record the status of the turnout and the point machine in question and send it to the administrator. The manager of the railway line can check the conversion status of the railway through the monitoring screen for the railway line switcher first, and then confirm the switching status directly through the CCTV camera image, thereby improving the reliability of the point machine operation. It will also enable the safe and efficient operation of personnel for management. It is expected to contribute to preventing a derailment caused by a malfunction of the point machine.

  • PDF