• Title/Summary/Keyword: 전원의무

Search Result 49, Processing Time 0.033 seconds

A Simulation Program for Protection Coordination in the Power Distribution System with Distributed Generators (분산전원 연계 배전계통의 보호협조 정정 프로그램 개발)

  • Kim, Sang-Ok;Seo, In-Yong;Lee, Heung-Ho;Rho, Dae-Seok
    • Journal of the Korea Society for Simulation
    • /
    • v.22 no.1
    • /
    • pp.1-8
    • /
    • 2013
  • A higher penetration of renewable energy sources and adoption of renewable portfolio standard(RPS), the penetration of distributed generators(DGs) into power distribution network is becoming a threat for the safe operation of distribution network. The ground fault current of DGs can cause parasitic trip and mal-trip of protective device in the power distribution network. KEPRI has developed a simulation program for current setting of protective devices in DGs connected distribution network. In this study, we analyzed fault currents of a sample network in two cases, i.e. case 1 is for no DG connection, case 2 for a DG connection. We performed protection coordination for relays installed in the network and analyzed the contribution of a DG.

The Study of Economic Feasibility of Wood Pellet in Domestic Power Plants Sector (국내 발전부문에서의 목재펠릿 경제성 연구)

  • Jeong, Nam-Young;Kim, Lae-Hyun
    • Journal of Energy Engineering
    • /
    • v.19 no.4
    • /
    • pp.251-257
    • /
    • 2010
  • Korea have a plan to enforce the Renewable Portfolio Standard(RPS) in 2012 for climate change action and effective use of energy but because of lack of renewable energy resources and limits of technology development, it will be hard to fullfill a target for RPS obligation in domestic power generation sector and woodchip biomass cofiring with coal combustion is the one of the alternative methods of the goal. Woodchip biomass cofiring with coal combustion is easy to approach technical design and has competitiveness of $CO_2$ & renewble energy certificate benefit and also has much lower generation cost than any other renewable energy resources. Because of that reason, woodchip biomass cofiring with coal combustion should be needed to fullfill the goal for RPS obligation in domestic power generation sector with midlong-term direction.

Interhospital Transfer of Emergency Patients and Informed Consent (응급환자의 전원과 의사의 설명의무)

  • Bae, Hyun-A
    • The Korean Society of Law and Medicine
    • /
    • v.13 no.1
    • /
    • pp.249-293
    • /
    • 2012
  • Inter-hospital transfer, depending on its medical and legal appropriateness, affect the prognosis of patients and can even lead to legal disputes. As Emergency Medical Service Act, any physician shall, in case where deemed that pertinent medical service is unavailable for such patient with the capacities of the relevant medical institution, transfer without delay such patient to another medical institution where a pertinent medical service is available. For medico-legally appropriate inter-hospital transfer, the head of a medical institution shall, in case where he transfers an emergency patient provide medical instruments and manpower required for a safe transfer of the emergency patient, and furnish the medical records necessary for a medical examination at the medical institution in receipt of such patient. And transfer process must comply with the requirements prescribed by executive rule such as attachment of the referral, provision of ambulance, fellow riders and informed consent of transfer. Those engaged in emergency medical service shall explain an emergency medical service to an emergency patient and secure his consent. In addition to the duty to inform about emergency medical service to the patient and his or her legally representative, there is also a duty for doctors to sufficiently explain to the patient and his or her legally representative during inter-hospital transfer that the need for the transfer, the medical conditions of the patient to be transferred and emergency treatment that will be provided by the hospital from which the patient is going to transferred. Likewise, the hospital to which the patient is transferred must be thoroughly informed about matters such as the patient's conditions, the treatment the patient was given and reasons for transfer by transferring doctors.

  • PDF

Climate Change Policy Analysis Considering Bottom-up Electricity Generation System (발전부문 하이브리드 모형을 사용한 기후변화 정책효과 분석)

  • Oh, Inha;Oh, Sang-Bong
    • Environmental and Resource Economics Review
    • /
    • v.22 no.4
    • /
    • pp.691-726
    • /
    • 2013
  • We develop a hybrid model which allows the change in electricity generation mix by adding the electricity-sector components of bottom-up model to the conventional CGE model. The electricity sector is represented as a sum of separate generation technologies, each of which has the form of DRTS (Decreasing Returns to Scale) production function, unlike the conventional CGE model. We compare the effects of the 30% emission reduction target using the hybrid model with those using the conventional CGE model. The cost of meeting the target is lower with the hybrid model than the conventional CGE. It is consistent with previous studies in that adding the bottom-up components to the top-down model reduces the cost of emission reduction. In an extra analysis we find that an additional regulation like RPS (Renewable Portfolio Standard) increases the cost.

Transient Stability Analysis of Vessel Power System Using Alternative Marine Power (육상전원공급장치(AMP) 이용한 선내 전원 공급 시 계통 안정도 분석)

  • Seung-pyo Kang;Jang-mok Kim;Hyun-jun Cho
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.29 no.2
    • /
    • pp.215-222
    • /
    • 2023
  • Alternative marine power (AMP) is continuously used in ports and on docks because of regulations on global ship emission reduction. In Korea, the use of AMP is also mandatory under the Special Act on Port Air Quality Improvement, and efforts are under way in connection with various eco-friendly ships, such as electric-propulsion ships. In this study, AC load flow analysis was performed by modeling the situation in which onboard power is supplied through AMP. This analysis made it possible to study the electrical parameters and losses when power was supplied to the ship. In addition, through a transient stability analysis, the high-speed generation transfer limit value for uninterruptible conversion through onboard generators in the event of a system accident was derived. The results obtained when it was applied are presented

Study on The Generation Expansion Planning Considering Emission Trading and LOLP (배출권거래와 공급신뢰도(LOLP)를 고려한 설비계획 방법론에 관한 연구)

  • Shin, Hye-Kyeong;Chung, Gu-Hyung;Hong, Hee-Jung;Han, Seoc-Man;Kang, Dong-Ju;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2007.11b
    • /
    • pp.214-216
    • /
    • 2007
  • Post 2012 기후변화협약 체제의 토래 및 강화되는 기후변화협약으로 인해 우리나라의 온실가스 의무감축이 확실하게 예견되고 있는 현 시점에서 우리나라의 온실가스 감축이행을 위한 대응책의 필요성이 증가하고 있다. 특히 발전부문은 우리나라의 온실가스 배출의 약 30%를 차지하고 있으며, 경제성장에 따라 온실가스 배출량이 빠른 속도로 증가하고 있으므로 Post 2012 기후변화협약 체제의 대응책이 보다 필요하다. 본 연구에서는 향후 발전부문에 온실가스 감축의무가 부담될 것을 고려하여 온실가스 배출량 제약 및 배출권거래제를 고려한 설비계획을 도출하고자 한다. 현재 우리나라의 전원 개발계획에서 사용되고 있는 전산모형(WASP, POWERSYM 등)은 온실가스 배출량 제약 및 배출권거래제를 고려하지 못하므로 MEFISET 모형을 이용하여 이를 고려하고자 한다. 그러나 MEFISET 모형은 설비예비력 제약조건을 통해 공급신뢰도를 만족하고 있다. 이러한 설비계획 결과는 공급신뢰도 기준 을 만족시키기 위해 과도한 설비계획 결과를 도출한다. 따라서 본 연구에서는 이를 보완하기 위해 Visual C를 통해 구현한 LOLP 프로그램을 통해 공급신뢰도 기준을 만족시키기 위한 적정 설비예비력을 추정하고자 한다.

  • PDF

Inverter Output Voltage Regulation based on P+Resonant Control (P+공진 제어기를 활용한 인버터 출력 전압 제어 방식 연구)

  • Lim, Kyungbae;Choi, Jaeho;Jang, Juyoung;Moon, Sangho;Kim, Jaesig
    • Proceedings of the KIPE Conference
    • /
    • 2013.11a
    • /
    • pp.249-251
    • /
    • 2013
  • 본 논문은 LCL 필터를 가진 계통연계형 인버터 기반 마이크로그리드가 독립 운전 모드에서 동작할때의 인버터 출력 전압 제어 방식에 대해 다루고 있다. 분산 전원 기반의 마이크로그리드가 독립 운전 모드로 전환될 경우 마이크로그리드는 분산 전원만으로 전체 지역적 부하를 담당해야 하는 의무를 지니게 된다. 따라서 이때 마이크로그리는 전압원으로 가정되며 이를 위해 전압 제어가 수행되어져야 하며 담당하고 있는 부하가 불평형 또는 비선형 부하 일 경우 역상차, 영상차, 특정 차수의 고조파가 발생되기 때문에 기존의 전압 제어 방식을 사용할 경우 출력 전압에 높은 THD 가 발생하게 되며 이는 부하의 성능을 저해하는 요소로 작용한다. 따라서 본 논문에서는 기존의 PI 제어기 대신 특정 주파수에서 높은 제어 게인을 갖게하는 P+ 다중 공진제어기를 선정하였으며 이를 특정 고조파 별로 다중으로 제어함으로써 비선형-불평형 부하 연결에 의한 악영향에 대처하고자 하였다. P+ 다중 공진제어에 의한 출력 전압 THD 개선 효과는 PSIM Simulation 을 통해 검증되었으며 기존의 PI, Advanced PI 제어기와 그 성능이 비교 분석되었다.

  • PDF

Web based and Muti-Users Channelled a Probabilistic Reliability Assessment Simulation System considering Renewable Energy Generators (웹기반 및 다사용자 동시 접속 가능한 신재생에너지전원을 포함한 확률론적 신뢰도 및 발전모의 시스템의 구축)

  • Park, Jeong-Je;Wu, Liang;Choi, Jae-Seok;Ma, Dae-Young;Cha, Jun-Min;Song, Tae-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.581_582
    • /
    • 2009
  • 최근 국내외적으로 스마트그리드, 마이크로그리드와 같은 곧 다가올 미래형전력계통망에 대한 기반기술연구가 매우 중요하다. 이는 전력IT기술과도 깊은 관련성이 있는 것으로써 그 성공여부는 전력IT기술과 협조를 맺으면서 여하히 기술적으로 이를 실현화(Implementation)하는냐에 달려있다고 하겠다. 본 연구에서는 최근 국내외적으로 급부상하고 있는 스마트그리드 마이크로그리드와 같은 곧 다가올 미래형전력계통망에 대비하고 나아가 $CO_2$ 감축의무와 맞물려 있는 분산형 신재생에너지발전원의 계통병입이 전력에너지의 적정공급신뢰도에 미치는 영향을 정량적으로 분석할 수 있는 웹기반 확률론적인 신뢰도 및 발전비용모의를 인터넷의 사용이 가능한 곳이면 어느 장소 및 시간대(Any where & any time)에서나 실시할 수 있는 시스템인 가칭, WPRASS V1.0(Web based Probabilistic Reliability Assessment Simulation System V1.0)을 성공적으로 구축하였다.

  • PDF

The Criminal Liability of Physicians in the Case of Medical Accidents (의료사고에서의 형사책임 -원내감염사고의 해결을 향하여-)

  • Utsumi, Tomoko
    • The Korean Society of Law and Medicine
    • /
    • v.19 no.2
    • /
    • pp.3-40
    • /
    • 2018
  • Conventionally, there were few cases in which a medical accident became a criminal case in Japan. However, after the serious malpractice such as the Yokohama City University Hospital case, prosecutors came to be less hesitant to prosecute a malpractice. In a medical accident, the attribution of the responsibilities among medical personnel becomes one important element of the proof of negligence. The Supreme Court concluded that, when the attribution of the responsibilities is not established among medical personnel to confirm the identity of the patient like the Yokohama City University Hospital case, all the personnel who were involved bear the responsibilities to identify the patient. For serious cases which requireut most carefulness fortreatment such as the Saitama Medical University Hospital case, not only the chief physician in charge of the case concerned but also the director of the branch at the university hospital bear the responsibilities to confirm the treatment policy of the case. After the acquittal of the Ohno Hospital case, the voice demanding more prudent prosecution of malpractices has become stronger than before. Meanwhile, Ministry of Health, Labour and Welfare introduced Medical Accidents Investigation System for the prevention of medical accident and, has reinforced the third party inspection of medical accidents.

A Study on the Implementation and Modeling of 20kW Scale ESS Load Test Device for Emergency Generator (소방용 비상발전기의 현장부하시험을 위한 20 kW급 ESS 부하시험장치 모델링과 구현에 관한 연구)

  • Choi, Seung-Kyou;Lee, Hu-Dong;Choi, Sung-Sik;Ferreira, Marito;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.9
    • /
    • pp.541-550
    • /
    • 2019
  • An emergency generator is key equipment for fire-fighting to supply power to fire-fighting facilities, which protect property and people in cases of fire accidents. A rated load test for emergency generators must be carried out by connecting an emergency load to the generator in accordance with related regulations. However, a no-load test has been performed for emergency generators in general since serious problems can occur when the main power is cut off, including the damage of customer devices and shut down of critical loads. Therefore, this paper proposes a load test method for an emergency generator using energy storage system (ESS) without the interruption of main power. The emergency power system was also modeled based on PSCAD/EMTDC software, and a 200-kW scale ESS load test device was implemented. The simulation and test results show that the load test method is useful and practical for an emergency power supply system.