Less execution of the electron arc treatment could in large part be attributed to the lack of an adequate planning system. Unlike most linear accelerators providing the electron arc mode, no commercial planning systems for the electron arc plan are available at this time. In this work, with the expectation that an easily accessible planning system could promote electron arc therapy, a commercial planning system was commissioned and evaluated for the electron arc plan. For the electron arc plan with use of a Varian 21-EX, Pinnacle3 (ver. 7.4f), with an electron pencil beam algorithm, was commissioned in which the arc consisted of multiple static fields with a fixed beam opening. Film dosimetry and point measurements were executed for the evaluation of the computation. Beam modeling was not satisfactory with the calculation of lateral profiles. Contrary to good agreement within 1% of the calculated and measured depth profiles, the calculated lateral profiles showed underestimation compared with measurements, such that the distance-to-agreement (DTA) was 5.1 mm at a 50% dose level for 6 MeV and 6.7 mm for 12 MeV with similar results for the measured depths. Point and film measurements for the humanoid phantom revealed that the delivered dose was more than the calculation by approximately 10%. The electron arc plan, based on the pencil beam algorithm, provides qualitative information for the dose distribution. Dose verification before the treatment should be mandatory.
Journal of the Korean Institute of Landscape Architecture
/
v.39
no.3
/
pp.10-25
/
2011
Since 1950, the city of Yokohama has been demanding the return of US. military base sites in Yokohama. Yokohama has established a systematic utilization plan for these relocation sites. The Fukaya communication site is one of former US. military bases verified for return in 2004. The Fukaya communication site is distinctively circular in shape and is entirely national land. Yokohama took an idea competition to its citizens to create a new park at the relocation of the Fukaya communication site, involving lots of citizen opinion in its utilization goals. This study determined the process of the idea competition at the Fukaya communication site in encouraging civic participation and analyzing citizen demands for the utilization of the relocation site. Through the idea competition, Yokohama city was able to obtain several ideas on the new park from various angles such as the function and shape of the urban open spaces. Citizens showed great interest in creating a park as green infrastructure on the Fukaya communication site. In addition, beyond utilization as an urban open space, many ideas suggested new lifestyles for the region in connection with the natural environment in the vicinity. Yokohama city tried to share the process and results of the idea competition with as many citizens as it could through a variety of means such as Participation, Judging, Support, Observation and Understanding. The case study on the idea competition at the Fukaya communication site is a good example of community design practice in public projects, and is full of suggestions for military bases in Korea, which has just established the plan of utilizing relocation sites as parks. Based on this case study, it can be concluded that it is important to make a systemic form for utilization planning with a clear process, open information and partnership in a variety of participatory design processes in order to ensure maximum civic utilization of relocation sites.
There was a new wave in grocery business with development of information and technology, thus a movement from traditional stores to online stores, In order to expand the scale of traditional supermarket and to satisfy the customers' needs, they provide offline and online services simultaneously. This paper is based on the previous studies which had been researched in developed countries from late 1990s to early 2000s and the purpose of this study is to introduce the idea and operation system of e-Grocery business. Moreover, we suggest the alternatives on delivery service methods in order to satisfy the customers' needs through analyzing the current condition of e-Grocers in Korea. According to the result of this study, Korean e-Grocers offer only attended home delivery services. In our opinion, Korean supermarkets have to take hybrid model which Tesco.com is using. There are some alternatives to increase the profits of Korean e-Grocers and to provide better services to their customers as follows: As an alternatives for delivery services, picking service is the easiest and cheapest way to apply for supermarkets. This is very useful for working women and also it is possible to order by smartphone recently. They can order the goods to the closest local supermarkets from working place, and then they pick them up on the way home from working off. In order to improve the quality of delivery services, to use the reception box will be the way to provide better services to the customers. The reception box is a way to protect the quality of goods such as fresh-cut product, which require the freshness through the temperature adjustment, and also to keep the safety of ordered goods through locking system Through this system, supermarkets are able to use attended or unattended services under the customers' satisfaction. However, using the reception box is expensive, so shared reception box will be an alternative. As an alternative for development of e-Grocery business, the advertisement for e-Grocery business has to be supported in order to attract potential customers in e-Grocery business. Furthermore, the main concerns of e-Grocery business such as the sanitation and safety of goods, and convenience must be guaranteed in order to keep the loyal customers and to attract new customers.
This study was performed to evaluate the influence of composting process with an intermittent aeration on the variation of rhizosphere soil temperature, $CO_2$ and $NH_3$ release, and the growth reponse of tomato plantlet in traditional and composting greenhouse. As the temperature of composting materials increased, rhizosphere soil temperature in 30cm depth rose up to $32^{\circ}C$ at one week after introduction. This was $18^{\circ}C$ higher than that of traditional greenhouse. After 20 days of active composting, temperature of rhizosphere soil started to decrease and remained constant at $23^{\circ}C$ after 35 days. For the traditional greenhouse, the averaged temperature ranged at $14{\sim}15^{\circ}C$. This results showed that composting greenhouse had the greater effect on increasing the underground temperature. Average value of evoluted $CO_2$ from the composting greenhouse for 70 days was $782{\sim}1154ppm$. This was $1.7{\sim}2.6$ times higher than that of the traditional greenhouse with an average of $440{\sim}462ppm$. $NH_3$ release was highest during $2{\sim}10$ days in intermittent aerated composting and reached to 134 ppm maximum on the 5th day, then decreased rapidly, and maintained at $3{\sim}4ppm$ after 17 days. Increased photosynthesis due to the $CO_2$ gas and a favorable rhizosphere environment due to the increased underground temperature resulted in improved growth, yield, and Brix degree of tomato fruit.
Ham, Jong-Hum;Hwang, Jae-Bong;Kim, Joon-Ho;Lee, Gui-Won
The Korean Journal of Nuclear Medicine Technology
/
v.13
no.3
/
pp.110-122
/
2009
Purpose: Nowadays, A medical institution assesment could get more interest about a quality of medical services from many hospitals that developed the active activities for improving medical services. Also, there is an other additional issue which is the patients risk management. Uijeongbu ST. Mary's hospital Nuclear Medicine department has been changed many work process after PET-CT introduction and renovation of its place since 2008. Therefore, modified structure and the way of existing work process have contained risk factors. The purpose of this study would be the appropriate risk management process while imaging examination process, the removal risk factors and improved activities through the analysis risk factors. Materials and Methods: Nuclear Medicine department new process should analysis through many-sided, Firstly, make and trained risk management manual after then apply an actual work. Result analysis showed the number of risk accident occurrence that comparing the last year and after the improved activities. Secondly, producing risk management public relations film has been showed an applicable patient after then the customer service measurement checked for a hundred patient by questionnaire. Lastly, Risk factors were eliminated through the facilities participation improving activities which could change for the better risk factors. Results: The number of safety accident occurrence(medication error, fall and collision) were checked as zero after the improving activities both PET-CT and gamma camera examination. The results of questionnaire showed as follows; 74% marked as understanding of the test process and 81% checked "satisfaction" after the public relations film showing. The question "Did you consider about the risk factors?", both PET-CT and gamma camera checked as 94% and 89% respectively. Customer risk management could be accomplished effectively through the improving activities at the nuclear medicine department. Conclusions: The study would be an opportunity that spread risk factors were systematically showed and analyzied. Also, It showed the possibility of the minimized safety accident and its feedback, if application of the response manuel that could be a standard of radiology technician's work method to react safety accident. It was the more effective that visual material could be easy to approach as a methodology of risk factors. As far as I have concerned that It could help the safety and convenience through continuous and detailed activities that offer to patients.
Journal of the Korean Institute of Landscape Architecture
/
v.46
no.5
/
pp.44-58
/
2018
Cities face new challenges not only in natural disasters by climate change but also in social and economic fluctuations. With the existing simple reconstruction method, it is difficult to solve the overall problems that a city or region may face. As a new approach to cope with various changes, the concept of resilience is emerging. Resilience is also one of the themes of recent major urban design projects. Design with the concept of resilience is a new strategy that can deal with various changes of urban space, rather than a temporary trend. The purpose of this paper is to explore the design method by analyzing cases where the concept of resilience is employed. We aim to examine what kind of design strategies are needed for the resilience design and how this design process differ in character, as compared to general design projects. Cases for this study include the "Rebuild by Design" competition held in 2013 and the "Resilient by Design/Bay Area Challenge" competition held in 2017. This paper consists of literature reviews and case studies. The latter is divided into two aspects: content analysis based on the theory of resilience and characteristics of the design process. Cases are analyzed through literature reviews and process characteristics of resilience design in response to the general design process. The main categories for urban resilience used as the framework for analysis include: Urban Infrastructure, Social Dynamics, Economic Dynamics, Health and Wellbeing, Governance Networks, and Planning and Institutions. As a result, the aspects of resilience concepts considered and design strategies undertaken by each team were identified. Each team tried to connect all 6 categories to their design strategies, placing special value on the role of governance, a system that enables collaborative design and project persistency. In terms of the design process, the following characteristics were found: planning the whole project process in the pre-project phase, analyzing predictable socioeconomic risk factors in addition to physical vulnerabilities, aiming for landscape-oriented integrated design, and sustainable implementation strategies with specific operations and budget plans. This paper is meaningful to connect the concept of resilience, which has been discussed in various articles, to design strategy, and to explore the possibility of constructing a practical methodology by deriving the characteristics of the resilience design process. It remains a future task to research design strategies that apply the concept of resilience to various types of urban spaces, in addition to areas that are vulnerable to disasters.
This study examined an automated irrigation technique by a frequency domain reflectometry (FDR) sensor for scheduling irrigation for tomato (Solanum lycopersicum L. 'Starbuck F1') cultivation aimed at avoiding effluent from an open hydroponic system with coir substrate containing different ratios of chip-to-dust (v/v) content. Specifically, the objectives were to undertake preliminary measurements of irrigation volumes, leachate volume, volumetric water content and electrical conductivity (EC) in the substrate, plant growth, fruit yield, and water use efficiency resulting from variation in chip content as an initial experiment. Commercial coir substrates containing different percentages of chips and dust (0 and 100%, 30 and 70%, 50 and 50%, or 70 and 30%), two-story coir substrates with different percentages of chips in the lower layer and dust in the upper layer (15 and 85%, 25 and 75%, or 35 and 65%), or rockwool slabs were used. The results showed that a negligible or no leachate was found for all treatments when plants were grown under a technique for scheduling non-drainage irrigation using a frequency domain reflectometry (FDR) sensor. Daily irrigation volume was affected by chip content in both commercial and two-story slabs. The highest plant growth, marketable fruit weight, and water-use efficiency were observed in the plants grown in the commercial coir slab containing 0% chips and 100% dust, indicating that the FDR sensor-auto-mated irrigation may be more useful for tomato cultivation in coir substrate containing 0% chips and 100% dust using water efficiently and minimizing or avoiding leachate and thus increasing yield and reducing pollution. Detailed experiment is necessary to closely focus on determining appropriate irrigation volume at each of irrigation as well as duration of each individual irrigation cycle depending on different physical properties of substrates using an automated irrigation system operated by the FDR sensor.
Radiation treatment for skin cancer has recently increased in tomotherapy. It was reported that required dose could be delivered with homogeneous dose distribution to the target without field matching using electron and photon beam. Therapeutic beam of tomotherapy, however, has several different physical characteristic and irradiation of helical beam is involved in the mechanically dynamic factors. Thus verification of skin dose is requisite using independent tools with additional verification method. Modified phantom for dose measurement was developed and skin dose verification was performed using inserted thermoluminescent dosimeters (TLDs) and GafChromic EBT films. As the homogeneous dose was delivered to the region including surface and 6 mm depth, measured dose using films showed about average 2% lower dose than calculated one in treatment planning system. Region indicating about 14% higher and lower absorbed dose was verified on measured dose distribution. Uniformity of dose distribution on films decreased as compared with that of calculated results. Dose variation affected by inhomogeneous material, Teflon, little showed. In regard to the measured dose and its distribution in tomotherapy, verification of skin dose through measurement is required before the radiation treatment for the target located at the curved surface or superficial depth.
An animal experiment was designed for the evaluation of in vivo performance of the newly developed electrohydraulic type ventricular assist device and its influence on the left ventricular function during pal- satile left ventricular assist. Eight adult sheep were incorporated into the study and data were collected from seven sheep. Total as- sist time ranged from 69 minutes to 7 days. The performance of the device was satisfactory both in asyn- chr nous and synchronous mode within the range of given native heart rate. More than 4 liters of device output could be reached within the range of normal left atral pressure without development of negative pressure in the left atrium. Moderate to severe degree of hemolysis was noted as evidenced by significant increase of plasma free hemoglobin level after 3 days of left ventricular support along with the presence of the small amount of thrombi around the floating disc type polymer valve apparatus reflecting that further study and refinement of the device need to be done in regard of biocompatibility and thromboresistance. The hemodynamics showed increase in heart rate (p < 0.05), cardiac output and left ventricular minute work (p < 0.05) after placement of the device at the flow rate of 2.0∼2.5 Llmin. The left atrial pressure, left ventricular pressure and LV dpldt were decreased after the device placement(p < 0.05). The endocardial viability ratio and oxygen contents of the mixed ven us blood and coronary venous blood were all increased (p < 0.05) after the device placement suggesting effective unloading of the left ventricle was accomplished. The myocardial perfusion was thought improved in synchronous counterpulsation as suggested by sig- nificant increase in endocardial viability ratio and coronary venous blood oxygen content in synchronous assist mode comparing with asynchronous mode.
Journal of the Korean Society for Marine Environment & Energy
/
v.19
no.3
/
pp.227-235
/
2016
This paper emphasized the necessity of the marine spatial planning (MSP) through the analysis of the major developmental projects which could make a contradiction based on the adequacy of the site selection and environmental impacts. The conflicting affairs between space utilization and management plan happen in the following ways: marine renewable energy development, sand mining, reclamation, construction of golf course in coastal area, thermal effluent and waste heat, erosion causing port development. The conflict of stakeholder continues caused by the accumulated environmental impact. For the reasons mentioned above, we found two things. First, it is necessary to comprehend the fact of developmental planning and MSP. Second, it is still unsatisfactory to connect the relevance of laws related to the spatial planning. For the reinforcement of marine environmental policy management, it is necessary to consolidate the property of site selection and assessment of developmental scale. Especially, while the strategic environmental assessment is in progress based on site selection and property of scale, consistent diagnosis is needed in the following concerns: the fact of the marine spatial planning, the relevance between national developmental plan and regional developmental plan, fisheries regulation, marine protected animals. For the environmentally sound and sustainable development (ESSD), MSP should have to be prepared based in a way of top-down including coastal and EEZ plan, relevance of ocean-use zoning and sector planning, 3-D spatial information. And also integrated information system have to be prepared through high-tech marine spatial information. In conclusion, consistent and relevant strategy for MSP should have to include the whole information related to the maritime affairs such as harbor, fishing port, fishing ground, coastal management, marine ecosystem generally.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.