• Title/Summary/Keyword: 전단-축력 상호작용

Search Result 10, Processing Time 0.03 seconds

Nonlinear Earthquake Analysis of a Steel Girder Bridge using Point Hinge Models (힌지모델을 이용한 강 거더 교량의 비선형 지진해석)

  • Lee, Do Hyung;Kim, Yong Il;Lee, Doo Ho;Jeon, Jeong Moon
    • Journal of Korean Society of Steel Construction
    • /
    • v.21 no.4
    • /
    • pp.403-411
    • /
    • 2009
  • In the present study, nonlinear earthquake analysis was carried out for a steel girder bridge that had been damaged by the 1995 Kobe earthquake. For such analysis, the use of hysteretic models describing flexure-axial and shear-axial interaction was suggested. The models were incorporated into a structural analysis program in terms of the joint elements representing hinge models, and then a simplified analysis scheme using the hinge models was employed for bridge piers. The analytical predictions of the flexure-axial interactive hinge model show a good correlation with those of the detailed fiber element model. In addition, the analytical predictions of the flexure-shear-axial interactive hinge model enable a displacement component to be separately captured. It is thus recognized that the present study can be a useful scheme for the healthy evaluation of the global displacement performance of piers subjected to earthquake excitation.

Experimental Study for Concrete Base to Sleeve connection of Hybrid Substructure for Offshore Wind Turbine (하이브리드 해상풍력발전 지지구조물의 콘크리트 베이스-슬리브 연결부에 대한 실험 연구)

  • Lee, Jeong-Hwa;Byun, Nam-Joo;Kim, Seong-Hwan;Park, Jae-Hyun;Kang, Young-Jong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.17 no.1
    • /
    • pp.79-87
    • /
    • 2016
  • In this paper, concrete base to sleeve connections of hybrid substructures for offshore wind turbines were suggested and investigated experimentally. Punching shear strength tests with well-instrumented three connections under different reinforcement ratios and loading conditions were conducted to investigate the punching shear strength and the behavior of the concrete base to a sleeve connection. The test results showed that the punching strength and stiffness of the connections are affected mainly by the reinforcement ratios. The loading conditions with an axial load and proportional moment cannot affect the stiffness but affect the strength of the connections because of the axial load-moment interaction. The punching shear failure and critical section of the each test specimen are also discussed.

A Study on the Behaviour of a Single Pile to Tunnelling Including Soil Slip (Soil slip을 고려한 터널굴착에 의한 단독말뚝의 거동연구)

  • Lee, Cheol-Ju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.5
    • /
    • pp.59-67
    • /
    • 2009
  • Three-dimensional (3D) numerical analyses have been conducted to study the behaviour of a single pile to tunnelling. The numerical analysis has included soil slip at the pile-soil interface. In the numerical analyses the interaction between the tunnel and the pile constructed in weathered soil and rock has been analysed. The study includes the pile settlement, the relative shear displacement between the pile and the soil and the shear stresses at the interface and the axial force on the pile. In particular, the shear stress transfer mechanism at the pile-soil interface related to the tunnel advancement has been rigorously analysed. Due to changes in the relative shear displacement at the pile-soil interface during the tunnel advancement, the shear stress and the axial force distributions along the pile have been changed. Upward shear stress developed at most part of the pile (Z/L=0.0-0.8), while downward shear stress is mobilised near the pile tip (Z/L=0.8-1.0) resulting in tensile force on the pile, where Z is the pile location and L is the pile length. Some insights into the pile behaviour to tunnelling obtained from the numerical analyses will be reported and discussed.

  • PDF

Nonlinear Finite Element Analysis of Reinforced Concrete Column using Timoshenko Beam Theory and Fiber Section Model (Timoshenko보 이론 및 층상화 단면모델을 이용한 RC 기둥의 비선형 유한요소해석)

  • Park, Soon Eung;Park, Moon Ho;Kwon, Min Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4A
    • /
    • pp.577-585
    • /
    • 2006
  • In this research, nonlinear Timoshenko beam element that is able to capture nonlinear shear deformation is developed. The proposed model shows more reasonable prediction than Bernoulli beam theory in short columns or strong shear column due to the consideration of shear deformation. The cross-section is modeled as fiber approach. Since the model is based on the fiber approach for section discretization, the plastic progress of the section can be traced and the coupling effect of the axial and flexural response. The developed element is implemented into the finite element program to analysis general reinforced concrete structures. As parametric study, reinforced concrete columns are analyzed and compared with experimental results, analyzed the property of behavior for reinforced concrete columns.

The Response of a Single Pile and Pile Groups to Tunnelling Performed in Weathered Rock (풍화암에서 실시된 터널굴착으로 인한 단독말뚝 및 군말뚝의 거동)

  • Lee, Cheol Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.5C
    • /
    • pp.199-210
    • /
    • 2012
  • The effects of tunnelling in weak weathered rock on the behaviour of a pre-existing single pile and pile groups ($3{\times}3$ and $5{\times}5$ pile groups) above a tunnel have been studied by carrying out three-dimensional (3D) elasto-plastic numerical analyses. Numerical modelling of such effects considers the response of the single pile and pile groups in terms of tunnelling-induced ground and pile settlement as well as changes of the shear transfer mechanism at the pile-soil interface due to tunnelling. Due to changes in the relative shear displacement between the pile and the soil at the pile-soil interface with tunnel advancement, the shear stresses and axial pile force distributions along the pile change drastically. Based on the computed results, upward shear stresses are induced up to about Z/L=0.775 from the pile top, while downward shear stresses are mobilised below Z/L=0.775, resulting in a reduction in the axial pile force distribution with depth equivalent to a net increase in the tensile force on the pile. A maximum tensile force of about $0.36P_a$ developed on the single pile solely due to tunnelling, where $P_a$ is the service axial pile loading prior to tunnelling. The degree of interface shear strength mobilisation at the pile-soil interface was found to be a key factor governing pile-soil-tunnelling interaction. Overall it has been found that the larger the number of piles, the greater is the effect of tunnelling on the piles in terms of pile settlement, while changes of the axial pile forces for the piles in the groups are smaller than for a single pile due to the shielding effect. The reduction of apparent allowable pile capacity due to tunnelling-induced pile head settlement was significant, in particular for piles inside the groups.

A Study on the Behaviour of a Single Pile to Adjacent Tunnelling Conducted in the Lateral Direction of the Pile (단독말뚝의 측면으로 시공되는 터널에 의한 말뚝의 거동 연구)

  • Lee, Cheolju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.1
    • /
    • pp.41-50
    • /
    • 2011
  • Three-dimensional(3D) numerical analyses have been conducted to study the behaviour of a single pile to adjacent tunnelling conducted in the lateral direction of the pile. In the numerical analyses, the interaction between the tunnel, the pile and the soil next to the pile has been analysed. The study includes the pile settlement, the relative shear displacement between the pile and the soil, the shear stresses at the soil next to the pile and the axial force on the pile. In particular, the shear stress transfer mechanism along the pile related to the tunnel advancement has been rigorously analysed. Due to changes in the relative shear displacement between the pile and the soil next to the pile during the tunnel advancement, the shear stress and the axial force distributions along the pile have been changed. Downward shear stress developed above the tunnel springline (Z/L=0.0-0.7~0.8), while upward shear stress is mobilised below the tunnel springline (Z/L=0.7~0.8-1.0) resulting in compressive force on the pile, where Z is the pile location and L is the pile length. Maximum compressive force of about $0.475P_a$ was developed on the pile after completion of tunnel advancement, where $P_a$ is the allowable pile capacity. Some insights into the pile behaviour to tunnelling obtained from the numerical analyses will be reported and discussed.

A Study on the Behaviour of Single Piles to Adjacent Tunnelling in Stiff Clay (견고한 점토층에서 실시된 터널근접시공으로 인한 단독말뚝의 거동에 대한 연구)

  • Jeon, Youngjin;Lee, Cheolju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.6
    • /
    • pp.13-22
    • /
    • 2015
  • In the current work, a series of three-dimensional (3D) numerical modelling has been performed in order to study the effects of the relative locations of tunnels with respect to the position of pile tips which governs the behaviour of pre-existing, adjacent single piles. In the numerical analyses, several governing factors, such as tunnelling-induced pile head settlements, relative displacements, volume losses, axial pile forces, interface shear stresses and apparent factors of safety have been analysed. When the pile tips are inside the tunnelling influence zone, of which the pile tip location is considered with respect to the tunnel position, tunnelling-induced pile head settlements are larger than the ground surface settlements, resulting in tunnelling-induced tensile pile forces. On the contrary, when the pile tips are outside the influence zone, compressive pile forces associated with downward shear stresses at the upper part of the piles are developed. Based on computed load and displacement relation of the pile, the apparent factors of safety of the piles inside the tunnelling influence zone have been reduced by 36% in average. The shear transfer mechanism based on the relative tunnel locations has been analysed in great detail by considering tunnelling-induced pile forces, interface shear stresses and the apparent factors of safety.

The response of a single pile to open face tunnelling (Open face 터널시공으로 인한 단독말뚝의 거동)

  • Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.14 no.5
    • /
    • pp.529-545
    • /
    • 2012
  • Three-dimensional (3D) finite element analyses have been performed to study the behaviour of a single pile to open face tunnelling in stiff clay. Several key factors such as tunnelling-induced ground and pile settlement, and shear transfer mechanism have been studied in detail. Tunnelling resulted in the development of pile settlement larger than the Greenfield soil surface settlement. In addition, due to changes in the shear transfer between the pile and the soil next to the pile with tunnel advancement, axial force distributions along the pile change drastically. The apparent allowable pile capacity was reduced up to about 30% due to the development of tunnelling-induced pile head settlement. The skin friction on the pile was increased with tunnel advancement associated with the changes of soil stresses and ground deformation and hence axial pile force distribution was reduced. Maximum tunnelling-induced tensile force on the pile was about 21% of the designed pile capacity. The zone of influence on the pile behaviour in the longitudinal direction may be identified as ${\pm}1$-2D (D: tunnel diameter) from the pile centre (behind and ahead of the pile axis in the longitudinal direction) based on the analysis conditions assumed in the current study. Negative excess pore pressure was mobilised near the pile tip, while positive excess pore pressure was computed at the upper part of the pile. It has been found that the serviceability of a pile experiencing adjacent tunnelling is more affected by pile settlement than axial pile force changes.

Evaluation of Minimum Depth Criterion and Reinforcement Effect of the Soil Cover in a Long-span Soil-steel Bridge (장지간 지중강판구조물의 최소토피고 평가 및 토피지반 보강에 대한 수치해석)

  • 이종구;조성민;정현식;김명모
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.5
    • /
    • pp.67-78
    • /
    • 2004
  • Soil-steel bridges are made of flexible corrugated steel plates buried in the well-compacted granular soil. One kind of possible collapses of these structures could be initiated by shear or tension failure in the soil cover subjected to vehicle loads. Current design codes provide the requirements for the minimum depth of the soil cover to avoid problems associated with soil cover failures. However, these requirements were developed for short span (less than 7.7 m) structures which are made of unstiffened plates of standard corrugation (150$\times$50 m). Numerical analyses were carried out to investigate the behavior of long span soil steel bridges according to thickness of the soil cover. The span of structures were up to 20 m and deep corrugated plates (381$\times$140 m) were used. The analysis showed that the minimum cover depth of 1.5 m could be sufficient to prevent the soil cover failure in the structures with a span exceeding 10 m. Additional analyses were performed to verify the reinforcement effect of the concrete relieving slab which can be a special feature to reduce the live-load effects. Analyses revealed that the bending moment of the conduit wall with a relieving slab was less than 20% of that without a relieving slab in a case of shallow soil cover conditions.

A Comparative Study of Structural Analysis on DCM Improved by Pile and Block Type (말뚝식과 블록식이 혼합된 시멘트혼합처리공법(DCM)의 구조체 해석 비교 연구)

  • Shin, Hyun Young;Kim, Byung Il;Kim, Kyoung O;Han, Sang Jae
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.5-19
    • /
    • 2014
  • In this study, the structural analysis is performed on the method of shallow block and deep cement mixing pile, and then their characteristics and associated behaviors were analyzed. In the case of continuous beam analysis, the predicted settlement was very small, and shear force and bending stress are somewhat overestimated. The frame method is similar to numerical analysis in the internal force shallow block and long pile, but because the settlement of pile is underestimated, the additional calculation using the reaction of the long pile is necessary. For soil arching method and piled raft foundation method, the excessive axial force of long pile was predicted because the load sharing of pile is very large compared to the other methods. In the behavior of the shallow block and deep pile method, the settlement of shallow block and contact pressure are much in the center than the edge. In the estimating method considering the interaction between improved material and ground, the load sharing of the soil-cement pile ranges from 20% to 45%, and the stress ratio is 2.0~5.0 less than piled DCM. The maximum member forces at the boundary conditions of pile head are similar, but in fixed head the axial force and vertical displacement are different in accordance with pile arrangement.