• Title/Summary/Keyword: 적정공사기간

Search Result 64, Processing Time 0.019 seconds

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

A Study on the Characteristics of Projects Following the Promotion of Private Park Special Projects (민간공원특례사업의 추진에 따른 사업특성에 관한 연구)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.112-124
    • /
    • 2021
  • This study was conducted to examine and analyze local governments, park status, project characteristics, and the implementation in detail for private park special projects across the country as a means of responding to the sunsetting of urban parks. As a result of the analysis, first, the private park special project, was found to be mainly implemented in cities with a population of more than 100,000, so there was a limit to the application on military installations or in local small cities. Therefore, rather than applying the special system collectively, it was judged that institutional flexibility, considering the characteristics and size of local government, was needed. Second, the current special projects by the park creation donation collection method shows monotonous development centered on apartment houses, so it is necessary to diversify the development by introducing a park preservation method that purchases and donates park sites. Third, it was found that the area standard needs to be eased to less than 50,000m2 to include parks with high utilization and good accessibility in urban areas of large cities, as the type and area of parks are limited. Fourth, most special projects are mountain parks, which are feared to damage the natural terrain and skyline, so separate ordinances should be established and applied, and development approaches should be made to allow nature and parks to coexist with the setting of detailed building guidelines for each type of facility. The guidelines should include, first, after the nationwide private park special projects are completed, standards for appropriate returns for similar projects should be established, institutional standards such as the recovery of excess profits should be established, and environmental reviews should be conducted. Second, it was found that local governments should institutionalize the composition of private consultations to promote the efficient management of projects through a cooperative system, and third, a roadmap for maintenance after the donation of special parks should be established.

A Study on Risk Factor Identification by Specialty Construction Industry Sector through Construction Accident Cases : Focused on the Insurance Data of Specialty Construction Worker (건설재해사례 분석에 의한 전문건설업종별 위험요인 탐색 : 전문건설업 근로자 공제자료를 중심으로)

  • Lee, Young Jai;Kang, Seong Kyung;Yu, Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.1
    • /
    • pp.45-63
    • /
    • 2019
  • The number of domestic construction company is expanding every year while the construction workers' exposure to disaster risk is increasing due to technological advancements and popularity of high-rise buildings. In particular, the industry faces greater fatalities and severe large scale accidents because of construction industry characteristics including influx of foreign workers with different language and culture, large number of aged workers, outsourcing, high place work, heavy machine construction. The construction industry is labor-intensive, which is to be completed under given timeline and consists of unique working environment with a lot of night shifts. In addition, when a fixed construction budget is not secured, there is less investment in safety management resulting in poor risk management at the construction site. Taking account that the construction industry has higher accident risk rate and fatality rate, risky and unique working environment, and various labor pool from foreign to aged workers, preemptive safety management through risk factor identification is a mandatory requirement for the construction industry and site. The study analyzes about 8,500 cases of construction accidents that occurred over the past 10 years and identified risk factor by construction industry sector to secure a systematic insight for risk management. Based on interrelation analysis between accident types, work types, original cause materials and assailing materials, there is correlation between each analysis factor and work industry. Especially for work types, there is great correlation between work tasks and industry type. For reinforced concrete and earthwork are among the most frequent types of accidents, and they are not only high in frequency of accidents, but also have a high risk in categories of occurrence.

The Private-Initiated Park Development Project in Terms of Securing Publicity Operation Characteristics Analysis - Busan Metropolitan City as a Case - (공공성 확보측면에서 민간공원특례사업 운영특성분석 - "부산광역시를 사례로" -)

  • Gweon, Young-Dal;Park, Hyun-Bin;Kim, Dong-Pil
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.1
    • /
    • pp.13-28
    • /
    • 2023
  • This study examines the process of project promotion in Busan, which introduced the private participation-type consultative body for the first time in the country in the promotion stage of the private-initiated park development project, and introduced flexible application of the system and differentiated policy elements in the implementation process, and examines the operational characteristics and we tried to analyze performance, etc. As a result of the analysis, first, the preferred bidder was selected by introducing a mixed method in the project method, which is an independent project method that cannot be seen in other local governments. Second, by specifying guidelines considering the characteristics of each park and detailed guidelines such as the location, area, and maximum height of non-park facilities, criteria for establishing a rational development plan utilizing regional identity and the basis of evaluation standards were laid. Third, in the project process, transparency was secured through the delegation-type roundtable, in which the private sector performs the functions and roles of key actors, thereby preventing disputes such as suspicion of preferential treatment. Fourth, in order to improve the quality of park facilities to be donated and to secure design adequacy, after approval of the implementation plan, a general planner was introduced and construction project management (design stage) services were performed to promote efficient implementation and specialization of luxury parks in the region. As a result, the city of Busan carried out the project efficiently by conserving 5 parks from sunset, a park area of 2.25km2, and reducing land compensation and park construction costs by KRW 740 billion. Reinforcement of the public nature of the private-initiated park development project was suggested. However, due to the application of these systems and verification procedures, the project period is prolonged, and park services are delayed along with the financial burden on private operators.