• 제목/요약/키워드: 저압터빈 1단 회전익

Search Result 1, Processing Time 0.3 seconds

Extension Feasibility on Replacement Cycle of Rotor Blade Equipped for Low Pressure First Stage in a 150 MW Gas Turbine (150 MW급 가스터빈 저압 1단 회전익 교체주기 연장 가능성 연구)

  • Lim, Jong-Ho;Lee, Jae-Heon
    • Plant Journal
    • /
    • v.9 no.4
    • /
    • pp.31-36
    • /
    • 2013
  • In order to extend a hot gas parts replacement cycle of a gas turbine, blade row 1 from low pressure turbine, which has a significant impact on the cycle, has been selected from stored set after one cycle use. Taking into account the status of the first stage moving blade in LP turbine operated more than 27,000 equivalent operating hours(EOH) and the replacement cycle in the same type of gas turbine, the replacement of the high temperature components installed on the GT, a study subject, can be extended from 24,000 to 27,000 EOH.

  • PDF