• Title/Summary/Keyword: 작전운용형태/임무유형

Search Result 2, Processing Time 0.016 seconds

A Study Techniques of OMS/MP Generation Using War Game Simulation (모의분석을 통한 OMS/MP 산출기법에 관한 연구)

  • Kim, Hae-Yean;Byun, Jae-Jung
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.15 no.6
    • /
    • pp.802-811
    • /
    • 2012
  • This study proposes an OMS/MP preparation methodology using a simulation method instead of a survey method. We applied our methodology to the next generation detection radar, providing reasonable peace- and war-time OMS/MP values. Based on these results, we propose the process to calculate RAM objective values. The previous survey method required to supplement its method since the method used data from a similar weapon system. In addition, the previous method didn't provide enough reliability for the future weapon system. Instead of using the previous survey method, we propose to use war game simulation, which provides a better OMS/MP values. Based on these results, we propose the logical consecutive process that prepares combat and simulation scenarios, peace- and war-time OMS/MP values and RAM objective values.

A Study on an Operational Availability Computation Model for Weapon Systems (무기체계 운용가용도 산정 모델에 관한 연구)

  • Kim, Hye-Lyeong;Baek, Soon-Heum;Choi, Sang-Yeong
    • Journal of the military operations research society of Korea
    • /
    • v.35 no.3
    • /
    • pp.17-30
    • /
    • 2009
  • In this study, we propose the operational availability computation model that can be used on the weapon system's requirement planning phase. The proposed model consists of the time parameters of Ao(Operational Availability) for a system and each time parameter's estimation method. The time parameters for Ao computation are TT(Total Time) and TDT(Total Down Time). The time parameters are defined by considering OMS/MP(Operational Mode Summary/Mission Profile) elements. TT is a calendar time as a specific mission time at wartime or one year at peacetime. TDT consists of TPM(Total Preventive Maintenance time), TCM (Total Corrective maintenance time), TALDT(Total Administrative and Logistics Down Time). Then the estimation method for these time parameters are presented by the weapon systems types.