• Title/Summary/Keyword: 작업 우선순위

Search Result 234, Processing Time 0.025 seconds

Evaluation Factor and Enhancement of Gwangyang International Port's Competitiveness (광양항의 경쟁력 평가요인과 강화전략)

  • Jeong, Bonghyun
    • Journal of Korea Port Economic Association
    • /
    • v.30 no.1
    • /
    • pp.119-142
    • /
    • 2014
  • This study aims to evaluate the factors which affect the competitiveness of Gwangyang port, and to suggest strategies for the enhancement of its competitiveness by priority. This study inquires both 5 key rating factors: port location, port operations management, port costs, port facilities, and hinterland conditions and the priority of 14 detailed assessments through AHP method. First, the importances of main evaluation items for port competitiveness are analysed in the following orders: port location, port facilities, port costs, port operations, hinterland conditions. Second, the comprehensive importances based on the detailed evaluation properties complex weighting are identified in the following orders: connectivity with hinterland, accessibility of international harbor, incentives, the area of terminal, expertise and skills of port operations personnel, container throughput, and scale berths. Third, the strategies referring to the port location like centrality, transit, and merit on use should be actively conducted for the promotions of Gwangyang port's competitiveness, according to its international port competitiveness analysis. This study will provide both academic and policy implications with its related scholars, government, and research institutions. In addition, this will be contributed to formulating a basic theory for port competitiveness evaluation and providing a basic framework of evaluation analysis.

Program-level Maintenance Scheduling Support Model for Multiple University Facilities (프로그램레벨 다수 대학시설물 유지보수 일정계획 지원 모델)

  • Chae, Hong-Yun;Cho, Dong-Hyun;Park, Sang-Hun;Bae, Chang-Joon;Koo, Kyo-Jin
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.303-312
    • /
    • 2018
  • The university facility is made up of multiple buildings and has many maintenance items. In addition, administrative constraints need to be handled within a limited period. Most maintenance work is small scale and multi-work construction, such as waterproofing, needs to be organized. The facility manager makes annual unit price contract with a maintenance company and carries out the maintenance work. On the other hand, delay and rework is occurring because existing maintenance work performed without scheduling based on the manpower input. This study proposed a scheduling model that can support the facility manager to manage maintenance works of multiple university facilities at the program level. The model consists of three stages in order. In object analysis, details of the maintenance items were analyzed and the quantity is calculated based on the quantity takeoff sheet. In resource analysis, the craftsmen and construction period of detailed works are derived for the effective input of craftsmen. In scheduling, the priority of each work and the optimal manpower input are derived. The optimal schedule is selected according to the goodness of fit. The applicability and effectiveness of the prototype was evaluated through a case study and interviews with case participants. The model was found to be an effective tool to support the scheduling of maintenance works for the facility manager.

Development of a Lifestyle Redesign Program for College Students (대학생을 위한 라이프스타일 재설계 프로그램 개발)

  • Lee, Chun-Yeop;Park, Young-Ju
    • Journal of Korea Entertainment Industry Association
    • /
    • v.15 no.8
    • /
    • pp.337-349
    • /
    • 2021
  • This study tried to develop a lifestyle redesign program that can be applied to college students. For program development, the Delphi research method was implemented with 8 experts. Based on previous studies on lifestyle and time use, the first Delphi survey investigated the prioritization of occupations through evaluation instruments, lifestyle types, and living time survey tables. In the second Delphi survey, it was constructed based on the opinions of experts, and when the content validity ratio was low, it was reconstructed by modifying and supplementing it. In the third Delphi survey, while maintaining the framework of the secondary content, the experts' own responses from the second time and the second average score with other experts were presented together. As a result of this study, a program with an average score of 3.88~4.00, a content validity ratio of 1.00, and a convergence of 0.00 was finally derived. In the lifestyle redesign program for college students, the first step of the pre-intervention evaluation is to identify the lifestyle type, apply evaluation tools, and select occupations. In the second step, the lifestyle is redesigned by the intervention execution, and the facilitator intervenes to help college students do well their tasks. The program was developed by encouraging them to practice, checking the lifestyle type change as a result of the intervention in step 3, applying evaluation instruments after the intervention, and ending the program in the last step. This study provided a rationale for using lifestyle redesign program as an intervention to change their occupational performance patterns in order to successfully carry out the life they want.

Development of Emergency Restoration Scenarios for Railway Accident using Analytic Network Process (네트워크분석적 의사결정기법을 이용한 철도사고 임시복구시나리오 개발)

  • Sung, Deok-Yong;Park, Yong-Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.727-737
    • /
    • 2011
  • The emergency restoration scenarios for efficient railway accident management and restoration were developed. The emergency restoration procedures defined by the worst case of emergency restoration and the important events was proposed based on questionnaires from specialists and the result of survey. Via these studies, the railway accident in the tunnel could be the worst case among all railway accident types. Therefore, educations for a restoration team in confined area condition should be planned and performed to recover the worst case accident. In order for the emergency restoration, when a railway accident is occurred, the restoration should be performed in orders of handing collapse of facilities, burying track, and derailment of vehicle in tunnel based on the statistical analysis. The result of priorities were established by the period of restoration. The standard operation system for efficient railway accident management was developed by synthesizing the worst case for rapid emergency restoration, and important events for the standard operation procedures according to each emergency restoration type. Through this study, the restoration operation system of railway accident are recommended. This paper suggests to develop emergency restoration scenarios for the efficient railway accident management and recovery system. The study results will contribute not only for insuring punctuality, but also for minimizing delays from accidents. Therefore, emergency restoration scenarios will play a major role in the SOP for the damage limitation and the prevention of accident spread.

Population Strategy for Physical Activity in Korea (우리나라 신체활동 및 운동사업에서의 인구집단 전략)

  • Lee, Moo-Sik
    • Journal of agricultural medicine and community health
    • /
    • v.30 no.2
    • /
    • pp.227-240
    • /
    • 2005
  • Health promotion has more comprehensive approaches in recent years. Nevertheless we accept the concept of health promotion differently, we are agree on that community is the most important field in health promotion which includes population at the aspect of health policy, individual skill and, environment. And there are a number of different approaches to health promotion. In them, 'population approaches' and 'high -risk group approaches' has the most different characteristics. 'Population approaches' is equally important or more important than 'individual approaches' for maintaining and promoting population health. Almost part of this article contents is the summary of the guideline and population strategy of health promotion in Korea, 1999 - 2005. Community based health promotion program should be reinforced, integrated, comprehensive, collaborative through efficiently utilizing community resources. Recent new orientation of community health program is integrated health program, we can find this orientation at Ottawa charter 1986. Comprehensive approaches with the determinant factors for health are essential task. Physical activity is a key health determinant. The population-health approach suggests that educating people about physical activity is not enough. Individual behavior changes are important too, but need to be balanced with strategies for environmental change. Population strategy with physical activity for health promotion should be developed through improving social and physical supportive environment, linking and integrating community resources between public and private sectors in national, regional and local level. Continuous public education and social marketing should be provided through collaborating with community physical activity organization, facilities, work-places and school for increasing concern of all the people of community about physical activity. Governments, agencies and citizens should held and participate to building movement. And the strategy that various 'active for life' program should be developed, delivered, maintained and reinforced continuously. Basically, adequate and sufficient financing, developing human resources, policies and legislation would be provided and supported fully too. At last, research development and knowledge exchange are required domestically and internationally. In Korea, we had classified the category of strategic priority of physical activity programs by environmental support, life-course approach, high-risk group approach and disease group approach for physical activity program based on community health center. Community based core programs for physical activity that includes infrastructure building and establishment of supporting environment, community campaign, health promotion education and public service announcement, physical activity programs for elderly and obesity, exercise prescription program.

  • PDF

A Construction of TMO Object Group Model for Distributed Real-Time Services (분산 실시간 서비스를 위한 TMO 객체그룹 모델의 구축)

  • 신창선;김명희;주수종
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.30 no.5_6
    • /
    • pp.307-318
    • /
    • 2003
  • In this paper, we design and construct a TMO object group that provides the guaranteed real-time services in the distributed object computing environments, and verify execution power of its model for the correct distributed real-time services. The TMO object group we suggested is based on TINA's object group concept. This model consists of TMO objects having real-time properties and some components that support the object management service and the real-time scheduling service in the TMO object group. Also TMO objects can be duplicated or non-duplicated on distributed systems. Our model can execute the guaranteed distributed real-time service on COTS middlewares without restricting the specially ORB or the of operating system. For achieving goals of our model. we defined the concepts of the TMO object and the structure of the TMO object group. Also we designed and implemented the functions and interactions of components in the object group. The TMO object group includes the Dynamic Binder object and the Scheduler object for supporting the object management service and the real-time scheduling service, respectively The Dynamic Binder object supports the dynamic binding service that selects the appropriate one out of the duplicated TMO objects for the clients'request. And the Scheduler object supports the real-time scheduling service that determines the priority of tasks executed by an arbitrary TMO object for the clients'service requests. And then, in order to verify the executions of our model, we implemented the Dynamic Binder object and the Scheduler object adopting the binding priority algorithm for the dynamic binding service and the EDF algorithm for the real-time scheduling service from extending the existing known algorithms. Finally, from the numerical analyzed results we are shown, we verified whether our TMO object group model could support dynamic binding service for duplicated or non-duplicated TMO objects, also real-time scheduling service for an arbitrary TMO object requested from clients.

Customizable Global Job Scheduler for Computational Grid (계산 그리드를 위한 커스터마이즈 가능한 글로벌 작업 스케줄러)

  • Hwang Sun-Tae;Heo Dae-Young
    • Journal of KIISE:Computer Systems and Theory
    • /
    • v.33 no.7
    • /
    • pp.370-379
    • /
    • 2006
  • Computational grid provides the environment which integrates v 따 ious computing resources. Grid environment is more complex and various than traditional computing environment, and consists of various resources where various software packages are installed in different platforms. For more efficient usage of computational grid, therefore, some kind of integration is required to manage grid resources more effectively. In this paper, a global scheduler is suggested, which integrates grid resources at meta level with applying various scheduling policies. The global scheduler consists of a mechanical part and three policies. The mechanical part mainly search user queues and resource queues to select appropriate job and computing resource. An algorithm for the mechanical part is defined and optimized. Three policies are user selecting policy, resource selecting policy, and executing policy. These can be defined newly and replaced with new one freely while operation of computational grid is temporarily holding. User selecting policy, for example, can be defined to select a certain user with higher priority than other users, resource selecting policy is for selecting the computing resource which is matched well with user's requirements, and executing policy is to overcome communication overheads on grid middleware. Finally, various algorithms for user selecting policy are defined only in terms of user fairness, and their performances are compared.

A Study on the Solution of Y2K Problem (Y2k 문제 해결 방안)

  • 박민수;최수길
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 1999.11a
    • /
    • pp.270-273
    • /
    • 1999
  • Y2k will be able to enormous disaster. The many make an effort to find a solution to problem of Y2k. Problem of Y2k must solution to as follow. First, problem of Y2k solution organization must constructed. Second, in step with each stage-the first, developing and complete stage, stage of Y2k solution must be constructed. Third, solution of Y2k must construct to hierarchy. hierarchy structure constructed form six stage to first stage, first stage is investigation resources, second stage is estimation influence, third stage is planing conversion, fourth stage is working conversion, fifte spot, sixth stage is diffusion on the spot.

  • PDF

Two-level Scheduling for Soft Real-Time Systems (소프트 실시간 시스템을 위한 두 단계 스케쥴링 알고리즘)

  • Kim, Jae-Hun
    • The Transactions of the Korea Information Processing Society
    • /
    • v.6 no.2
    • /
    • pp.467-475
    • /
    • 1999
  • This paper presents an algorithm for scheduling jobs in soft real-time systems. To simplify the scheduling for soft real-time systems, we introduce two-level deadline scheme. Each job in the system has two deadlines, which we call first-level and second-level deadlines, respectively. The first-level deadline is the same as the deadline in traditional real-time systems. The second-level deadline is later than the first-level deadline, and defines the latest point in time when the result is still acceptable. Partial-credit is given for jobs meeting the second-level deadline but missing the first-level deadline, whereas jobs meeting the latter are given full credit. We heuristically compute priorities of jobs in a dynamic way by combining the first-level adn second-level deadlines with the partial-credit. Simulation results indicate that our two-level scheduling algorithm is a viable approach for dealing with both soft real-time systems and temporary overloaded hard real-time systems.

  • PDF

A Study of Database Setup for River Infrastructure Maintenance (하천 기반시설의 유지관리를 위한 데이터베이스 구성에 관한 연구)

  • Kim, Kyoung-Min;Jung, Jae-Hoon;Lee, Tae-Hoon;Kim, Tae-Jeong;Lee, Seung-O
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.371-371
    • /
    • 2022
  • 하천관리지리정보시스템(RIMGIS)은 하천정보의 표준화 및 전산화를 통한 정보제공과 하천에 관련한 업무를 지원하기 위해 개발된 시스템으로 5개의 지방국토관리청에서 관리하고 있는 하천대장 및 부도, 구조물도 등의 다양한 하천 관련 정보를 정보화하여 인허가 및 하천기본계획 등의 하천업무를 신속하고 효율적으로 수행할 수 있도록 운영되고 있다. 국가 주요 기반시설을 생애주기 관점에서 관리하고 소요재원의 확보근거를 마련하고자 "지속 가능한 기반시설 관리 기본법"이 제정되었고 최근에 시행되었다. 이에 따라 국토안전관리원에서는 도로·철도·철도 하천 등과 같은 사회기반시설(15종)의 노후화에 대비하여 전략적인 투자와 관리방식 도입을 목적으로 인프라 총조사 사업을 진하천 등과 같은 사회기반시설(15종)의 노후화에 대비하여 전략적인 투자와 관리방식 도입을 목적으로 인프라 총조사 사업을 진행하고 관리를 위해서 기반터 시스템을 도입하였다. 하천관리지리정보시스템과 기반터 시스템은 하천 기반시설의 정보가 데이터베이스에서 다뤄진다는 점에서 유사하지만, 기반터 시스템은 하천관리지리정보시스템과 달리 유지관리 측면에 대한 필요한 보수 주기, 필요 예산 등과 같은 정보를 산정할 수 있도록 프레임워크가 구성되어 있다. 그러나 하천과 기반시설의 코드를 연결하는 작업들은 현재 상황에서는 미흡한 실정이고, 유지관리와 시설물의 노후화를 가속화하는 홍수와 침수피해 등을 전체적으로 고려할 수 있는 방안에 대한 연구도 미진한 상황이다. 이에 본 연구에서는 하천 기반시설의 유지관리를 위해 하천, 제방, 인명에 대한 위험지수를 고려한 잠재 인명피해 위험도와 잠재 홍수피해 위험도를 평가기준으로 설정하고 적용하였다. 또한 이를 포함시킨 투자우선순위 평가기법을 도입하여 감가상각과 위험요소 등을 고려할 수 있는 데이터베이스 구성 방안을 제시하고자 한다.

  • PDF