Korean Journal of Construction Engineering and Management
/
v.10
no.1
/
pp.91-101
/
2009
The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.
KSCE Journal of Civil and Environmental Engineering Research
/
v.38
no.6
/
pp.967-977
/
2018
The problems of lack of skilled worker and poor productivity at the construction site continue to be raised, and the introduction of construction automation as one of the solutions to this has been considered. The development of various types of equipment and systems has been carried out, especially for earthwork operations with multiple construction equipment. However, the level of commercialization of developed equipment or systems is very limited. Although the single-product type of earthwork equipment has been applied to the site, the integrated type of earthwork system is still in the field testing stage. Considering these constraints, the limited budget and research period, a strategy is needed to identify which technology areas and core technologies should be developed first. In this study, the technology areas and detailed core technologies that are essential for the development of earthwork systems at the level of commercialization are set and the priority of development is determined. In addition, the earthwork system that has been developed so far is analyzed and the detailed development direction is presented based on it. The findings can be used for a decision making to set the priority for core technologies that should be developed first in the limited budget and period.
요통(Lowback Pain)을 유발하는 주요원인으로 알려져있는 MMH(Manual Materials Handling) 작업에 있어서 작업조건의 변화가 근육의 활동과 피로도에 미치는 영향을 평가하기 위해 4가지 서로 다른 작업조건하에서 몸통부위(Trunk)의 주요근육에 대한 EMG 파형분석을 실시 하였다. 본 연구에서의 분석대항작업은 실제 작업조건과 유사하레 설계된 120분간의 단속적인 인양(Lifting)/하역(Lowering) 작업으로서 작업중량은 작업자의 MVIS(Maximum Voluntary Isometric Strength)를 기준으로 설정되었으며, 매 10분 간격으로 EMG 측정이 이루어졌다. 작업물이 작업자의 정면에 위치한 대칭형(Symmetric) 작업의 경우 배면부(Dorsal) 근육인 천극근(Erector Spinae)과 활배근(Latissimus Dorsi)이 활동근(Active Muscle)인 것으로 나타났으며, 정중면(Medial Plane)을 중심으로 좌우측 근육이 동일한 근력을 발휘하였다. 작업물이 작업자의 한쪽 측면에 위치한 90도 비대칭형(Asymmetric) 작업의 경우 천극근과 활배근외에 작업물과 반대쪽 외사근(External Oblique)이 활동근으로 추가되었으며, 작업물과 반대쪽의 근육들이 더욱 큰 근력을 발휘하였다. 작업의 반복에 따른 근육의 피로도를 평가하기 위해 실시한 EMG 파형의 Spectral Analysis 결과, 비대칭형 작업시 작업물과 반대쪽의 천극근에서 작업시간의 경과에 따라 중위주파수(Median Power Frequency)가 저주 파수대로 천이(Lower Shift)하는 현상이 나타났으며, 일정한 작업량이라도 작업중량을 줄이고 작업 빈도를 높여서 작업할 경우에 이러한 현상이 더욱 두드러졌다. 작업시간의 경과에 따른 MVIS의 감소 현상은 작업빈도가 높고 비대칭형 작업일 때 가장 크게 나타났다. 총손실을 줄이고, 상대적 비용절감효과를 갖게할 수 있다고 하였다. 따라서 본 연구에서는 성인 여성기성복의 치수적합성을 높이기위하여 출산 후 중년에 접어 들면서 체형이 변화되는 것을 고려하여 연령을 분류하고(18세-34세, 30세-51세), 각 연령 집단에 따른 체형을 각각 3가지로 분류하였다. 이에 따라 의복 생산시의 총손실을 줄이기위한 상의, 하의생산시 필요한 부위별 최적규격치 간격을 제시하였다.적인 기능으로 보여지는 것에 좁혀서 작업능력의 연령증가 변화에 대하여다원적 평가를 하는 것이 실제적이라고 할 수 있다. 따라서 본 연구에서는 인간이 가지고 있는 다수의 기능중에서 수지교 치성과 연령증가와의 관계를 조사한다. 만약 연령증가 만으로 수지교치성을 평가 할 수 없는 경우에는 어떠한 요인이 수지기민성의 변화에 영향을 미치는가를 검토한다.t list)에서 자동적으로 사건들의 순서가 결정되도록 확장하였으며, 설비 제어방식에 있어서도 FIFO, LIFO, 우선 순위 방식등을 선택할 수 있도록 확장하였다. SIMPLE는 자료구조 및 프로그램이 공개되어 있으므로 프로그래머가 원하는 기능을 쉽게 추가할 수 있는 장점도 있다. 아울러 SMPLE에서 새로이 추가된 자료구조와 함수 및 설비제어 방식등을 활용하여 실제 중형급 시스템에 대한 시뮬레이션 구현과 시스템 분석의 예를 보인다._3$", chain segment, with the activation energy of carriers from the shallow trap with 0.4[eV], in he amorphous regions.의 증발산율은 우기의 기상자료를 이용하여 구한 결과 0.05 - 0.10 mm/hr 의 범위로서 이로 인한 강우손실량은 큰 의미가 없음을 알았다.재발이 나타난 3례의 환자를 제외한 9례 (75%)에서는 현재까지 재발소견을 보이지 않고 있다. 이러한 결과는 다른 보고자들과 유사한 결과를
As workplace incidents has been being declining in Korea, there is criticism of the effectiveness of occupational safety policy implementation. It is unknown that which policy target group needs to be targeted to yield effective injuries prevention. The purpose of this paper is to analyze and reveal the policy intervention group with a high priority in terms of industrial incident prevention and the related investment cost. A Policy Priority Model(PPM) is composed of 6 indicators regarding influences of both the incident reduction and the cost reduction. Z-score analyses are used to confirm the high policy priority area or policy target group. Overall, workplace with worker below 50 persons, construction site with the sales of more than a hundred million won, workplace with relatively small percentage of female employees and relatively higher percentage of older worker should be prioritized to reduce workplace injuries. This paper provides an analytic way that can be used to decide the policy priority workplace in order not only to reduce work-related injuries&illnesses and the related investment cost but to further lessen the related societal costs.
PURPOSES: This study aims to establish the priority of introducing anti-icing spray system for regions of the National Highways in South Korea. Using this study, a logical plan for instituting such an anti-icing spray system can be established for the National Highways. METHODS : The Analytical Hierarchy Process (AHP) was employed to prioritize the implementation of an anti-icing spray system on Korean highways. For this purpose, an existing scoring table developed by the Ministry of Land, Infrastructure Transport Affair was slightly modified in order to reflect recent trends in winter maintenance. A survey was conducted to gather the preferences regarding the developed hierarchy of road experts and agencies. Finally, the final score was produced by integrating the scoring results with estimated weights for each evaluation criterion. RESULTS: In general, Honam and the metropolitan areas have relatively high priority while other areas such as Chungcheong, Young Nam, and Gang Won appear to be uniform in importance in terms of establishing an anti-icing spray system. This result may indicate that historical weather data and traffic volumes are significant factors in deciding in winter maintenance polices CONCLUSIONS : In this study, useful insights are suggested regarding winter maintenance by simultaneously performing rapid snow removal and proactive treatment. Issues of resource allocation may be potential research items in the field transportation engineering.
Korea Hydro & Nuclear Power Co. (KHNP) has implemented engineering programs for operating nuclear power plants. Engineering programs are maintenance rule (MR), functional importance determination (FID), single point vulnerability (SPV) and functional equipment group (FEG). Recently, KHNP has developed engineering programs for APR1400 feedwater supplying system to establish the advanced engineering system and will verify the suitability of engineering programs through implementing in new nuclear power plant. Consequently, it is expected that the reliability of APR1400 feedwater supplying system will be improved by implementing engineering programs.
Despite intensive therapy, a large proportion of stroke survivors are left with significant disabilities. To improve the disable condition, a major component of stroke management is aimed at facilitating functional independence and community reintegration. There are many evidences that community-based rehabilitation after stroke is most effective when provided by a well-organized multidisciplinary team. Key to the implementation of community-based rehabilitation(CBR) is that the disabled person, their family and their community decide on what the priorities of the service should be. The stroke patients in the community need a wide range of services, including the traditional rehabilitation services of physiotherapy, occupational therapy, speech therapy, social workers, orthotists, nurses and so on. The purpose of this research was to investigate necessity and methods of community-based rehabilitation system in Korea.
For the purpose of evaluating the availability of manifold safety devices installed in the LPG(Liquefied Petroleum Gas) refuelling stations, the quantitative analysis of the frequency on BLEVE(Boiling Liquid Expanding Vapor Explosion) scenario was performed. The amount of frequency reduction was the way of assessing safety devices availability. In this analysis, we could find out what sorts of safety devices are essential to satisfy acceptable social risk criteria and are prioritized to install in the future.
Recently in the IoT(Internet of Things) environment, a data collection in real-time through device's sensor has increased with an emergence of various devices. Collected data from IoT environment shows a large scale, non-uniform generation cycle and atypical. For this reason, the distributed processing technique is required to analyze the IoT sensor data. However if you do not consider the optimal scheduling for data and the processor of IoT in a distributed processing environment complexity increase the amount in assigning a task, the user is difficult to guarantee the QoS(Quality of Service) for the sensor data. In this paper, we propose APQTA(Adaptive Priority Queue-driven Task Allocation method for sensor data processing) to efficiently process the sensor data generated by the IoT environment. APQTA is to separate the data into job and by applying the priority allocation scheduling based on the deadline to ensure that guarantee the QoS at the same time increasing the efficiency of the data processing.
This paper shows the Applied Q-learning Algorithm which supports selecting the waiting position of a robot and the part serviced next in the Flexible Manufacturing Cell (FMC) that consists of one robot and various types of facilities. To verify the performance of the suggested algorithm, we design the general FMC made up of single transfer robot and multiple machines with a simulation method, and then compare the output with other control methods. As a result of the analysis, the algorithm we use improve the average processing time and total throughputs as well by increasing robot utilization, reversely, by decreasing robot waiting time. Furthermore, because of ease of use compared with other complex ways and its adoptability to real world, we expect that this method contribute to advance total FMC efficiency as well.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.