Improvement of Non-Working Day Estimation Affected by Weather Conditions in the Construction Projects in Korea (국내 건설공사의 기후조건에 의한 작업불능일 예측방법 개선)

  • Lee, Keun-Hyo;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.100-108
    • /
    • 2006
  • Non-working days affected by weather conditions of the construction-sites have been estimated without proper data. They are usually estimated based on project engineer's own experience and intuition. As a result, they cause not only economic loss to time-adjustment but also conflicts among project participants. It becomes more difficult to predict the weather nowadays than before due to tendency of recently weather change. Therefore, this paper presents an improved estimation method for non-working days, which could minimize estimation errors. The estimation method is developed based on analysis of regional characteristics and weather conditions which affect project duration.

Optimal Period by Calculating and Appling Correction Factor based on Setting of Non-Working Days of Construction Projects (건설공사의 작업불능일 기준설정에 의한 보정계수 계산 및 적용을 통한 최적공기 산정)

  • Lee, Pil-Yoon;Lee, Seong-Won;Byun, Yo-Seph;Cho, Choong-Yeun;Lee, Min-jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.669-676
    • /
    • 2018
  • Schedule management in construction work is an important step for determining the construction period. On the other hand, there is a difference between the planned schedule and execution schedule because the estimation and calculation of Non-Working days, in which possible at the design stage is not performed properly. This paper proposes a method for estimating the working days by analyzing characteristics of the major work type and estimating the Non-Working days reflecting the Chuseok and New Year Holidays, which is the closest method to the actual work in the schedule planning. By applying the correction factor of the existing method and the improved method for the same construction in the same site, improved method was reduced by 22 days (9.1%) based on the actual working days. The importance of schedule management was confirmed as an example by comparing the data before and after the application of the standard (plan). These results show that the schedule delays, which are caused by the inconsistency between actual working days calculation that had been practiced conventionally and the working days on the schedule table, can be prevented. In addition, it will help to establish a schedule plan that is closer to reality.