• Title/Summary/Keyword: 자동화 시공

Search Result 237, Processing Time 0.025 seconds

Comparing String Similarity Algorithms for Recognizing Task Names Found in Construction Documents (문자열 유사도 알고리즘을 이용한 공종명 인식의 자연어처리 연구 - 공종명 문자열 유사도 알고리즘의 비교 -)

  • Jeong, Sangwon;Jeong, Kichang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.125-134
    • /
    • 2020
  • Natural language encountered in construction documents largely deviates from those that are recommended by the authorities. Such practice that is lacking in coherence will discourage integrated research with automation, and it will hurt the productivity in the industry for the long run. This research aims to compare multiple string similarity (string matching) algorithms to compare each algorithm's performance in recognizing the same task name written in multiple different ways. We also aim to start a debate on how prevalent the aforementioned deviation is. Finally, we composed a small dataset that associates construction task names found in practice with the corresponding task names that are less cluttered w.r.t their formatting. We expect that this dataset can be used to validate future natural language processing approaches.

Stress Analysis of a Window Cleaning Robot using 3D Modeling and Improvement Plan (3D 모델링을 통한 유리창 청소로봇의 응력해석 및 설계 개선방안 도출)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.161-168
    • /
    • 2018
  • Recently, a prototype of a guide rail type window cleaning robot was developed, and is currently undergoing field testing. The size and the load of the robot have not yet been optimized. In this study, a stress analysis was performed to derive quantitative data to improve the current window cleaning robot and secure its structural safety. Through the analysis of its own weight, resistance to wind speed, and other factors, it was found that the robot can be improved in terms of the drooping caused by its own weight and the drag force against wind pressure. The analysis results obtained will be directly applied to improve the design of the window cleaning robot, and it is expected that this will advance the completeness of the robot's design.

Development of a Real-time Lifting-path Tracking System of a Tower-crane for Steel Members based on an Integrated Wireless RF Modem and GPS System (무선 RF모뎀과 GPS를 통합한 타워크레인의 철골부재의 실시간 양중위치 추적시스템 개발)

  • Yun, Seok-Heon;Lee, Ghang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.65-70
    • /
    • 2010
  • Steel frame construction in high places entails many risk factors. In order to improve the safety and productivity of steel frame construction, a project to develop a robotic tower-crane has been undertaken. As the first step, a real-time lifting-path tracking system is being developed. In a previous study, a laser-based tracking system was proposed. While a laser-based tracking system requires at least three laser sensors to detect the x, y, z coordinates of a lifted steel member, a GPS-based system has an advantage over the laser-based system, in that the x, y, z coordinates of a lifted steel member can be detected by a single GPS sensor. To improve the accuracy, arelative positioning method using two GPS sensors was proposed in a previous study. This paper reports an improved GPS-based lifting-path tracking system of a tower crane based on an integrated RF modem and GPS system. The results showedthat the RF modem could successfully send the identifier information to a server a maximum distance of 1 km away from the lifted steel beam, and the lifting path information of each beam captured by the GPS-based tracking system was successfully saved together. Also, byusing an improved algorithm for the GPS relative positioning method, the deviation was reduced to 0.61 m on average.

A Study on modular construction method in military facilities (모듈러 공법을 적용한 군시설공사의 개선방안에 관한 연구)

  • Park, Jae-Sig;Park, Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.642-647
    • /
    • 2006
  • Recently Ministry of National Defense is reconstructing old facilities using modular construction method for enhancing soldiers' quality of living. In the future, the use of modular construction method is expected to be increased. But in beginning stage as ROK military facilities that was built by modular was not designed and constructed efficiently, problems for pilot projects need to be analyzed by phases and construction methods should be improved. For the maximized efficiency, design should be made to minimize on-site works, factory automation in an assembly plant should be installed for the better productivity, roads that will be used for transportation should be checked, and joint and connection methods between modules in on-site assembly should be improved for a better quality.

  • PDF

Development of Crack Monitoring System for Self-healing Repair Mortar Surface Using Image Processing Technique (이미지 처리 기법을 이용한 자기치유 보수 모르타르 시공표면의 균열 모니터링 시스템 개발)

  • Oh, Sang-Hyuk;Moon, Dae-Jung;Lee, Kwang-Myong
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.3
    • /
    • pp.359-366
    • /
    • 2021
  • In this study, It was developed an monitoring cracks system based on image processing techniques in order to measure cracks, which are major damages in concrete, and to convert them into a database. The crack monitoring system consists of crack image captured equipment and a crack detection and analysis software. This system provides objective and quantitative data by replacing the conventional visual inspection. The crack detection algorithm w as verified through an indoor test using virtual cracks, and the amount of crack detection and crack width change was monitored by applying it to the self-healing repair mortar construction site. In the case of the crack width detected through image analysis, the maximum difference from the actual crack width was 0.0334mm. It was possible to detect microcracks of 0.1mm or less, and the effect of crack healing over time of the self-healing repair mortar was confirmed trough the field test.

Experimental Study on the Development of Void Precast Concrete Slab using Rubber Tube Mold for Inner Core (고무튜브 몰드 프리캐스트 콘크리트 유공 슬래브 개발에 관한 실험적 연구)

  • Bae, Kyu-Woong;Hong, Sung-Yub
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.293-303
    • /
    • 2021
  • The void PC slab has a structurally reasonable cross-section by forming the hollow section of the neutral axis that is unnecessary for bending behavior. Domestic PC factories have introduced automation equipment to produce hollow PC slabs, and are achieving hollow sections through inserts. However, since the excessive initial investment cost of the PC factory is the main factor in the increase in production cost, other alternatives are needed. Therefore, in this study, when producing hollow PC slab members, by using a rubber tube as a formwork to form an internal hollow space, it is intended to contribute to securing productivity through molding various hollow shapes, making it larger, lightweight, and enabling rapid production. To implement a hollow PC slab using a rubber tube mold, the shape of a hollow cross-section in which the tube is combined was implemented by considering the shape of the rubber tube first. In addition, to secure the concrete quality of the hollow part, the finish properties of the rubber tube mold and concrete were evaluated, and the hollow PC production process was established.

A Conceptual Design and Feasibility Analysis of a Window Cleaning Device (유리창 청소장치의 개념 디자인 및 경제적 타당성 예측)

  • Kim, Kyoon-Tai;Jun, Young-Hun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.537-543
    • /
    • 2020
  • The window cleaning works are manpower-dependent and are performed in an unstable posture at high altitude, so that there is a risk of falling. Therefore, there is an urgent need to improve the safety of workers. In this study, a conceptual design was proposed for the cleaning of exterior windows of a building, and the economic feasibility of the proposed conceptual model was analyzed. The proposed model is designed to avoid protrusions such as window frames, and to be able to respond even if the shapes of the upper and lower parts are different. As a result of analyzing the economic feasibility of the designed conceptual model, the benefit cost ratio was 4.48, which was significantly higher than 1. Therefore, the economic feasibility of the proposed window cleaning device is expected to be sufficient. The results analyzed in this paper will be used in the development and marketing of the window cleaning device.

An Automated Process to Produce Shop Drawings for MEP Works in BIM Environment (BIM기반 MEP공사 시공용 도면 작성 자동화 프로세스 제안)

  • Choi, Chang-Hyun;Kwon, Dae-Yong;Cho, Sang-Ho;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.10 no.4
    • /
    • pp.22-31
    • /
    • 2020
  • Shop drawing tasks conducted after finishing coordinated or engineering design have great influences on the quality and cost of a project. However, despite the development of commercial BIM applications, shop drawings have mainly produced manually in certain engineering fields. Incorrect shop drawings with human errors have occurred various problems such as cost overrun, time delay and reworks. An automated shop drawing publishing from BIM is expected to resolve these problems. Despite attempts for automate shop drawing production, the field of mechanical, electrical and plumbing (MEP) is yet regarded challenging due to complexity of components and connection. In this research, we develop a process for automated producing 3D MEP shop drawings in BIM environment as following steps: to analyze conventional MEP shop drawing process, to identify detailed process that can be automated, to classify existing MEP objects and assign codes usable in BIM, and to develop an application. The validation of automated process is conducted against 10 clean room projects in which MEP is more complex and its cost is higher than other projects in terms of productivity and workers' satisfaction. Results show that the number of manpower for shop drawing is reduced by 30%, and the working time is shortened by 31%. Personal opinions of involved practitioners is interpreted as positive as the average rate of agrement on practicability, easy-to-use and necessary retouch tasks is around 66%.

Automation of BIM Material Mapping to Activate Virtual Construction (가상건설 활성화를 위한 BIM 재질 매핑 자동화 기술)

  • Seo, Myoung Bae
    • Smart Media Journal
    • /
    • v.9 no.3
    • /
    • pp.107-115
    • /
    • 2020
  • Recently, BIM has become mandatory in the construction field, research on various use cases is increasing. In particular, when virtual reality technology, one of the core technologies of the 4th industrial revolution, and BIM are combined, it can be used in various fields such as preliminary design review and construction simulation. Until now, however, virtual reality grafting technology is only used as a simple prototype or as a model house. Also, it is difficult to activate virtual construction because it is expensive to produce high-quality virtual reality contents. Therefore, in this paper, in order to increase the utilization and quality of the virtual construction field, a study was conducted to shorten the material mapping time, which takes a lot of time when producing virtual reality contents using BIM. To this end, object properties were assigned to enable material mapping in the BIM model, and materials most used in the construction field were configured, and automated material function development and final tests were conducted that automatically map properties and materials. For the test, 10 models were used and the test was repeated three times, and the productivity improvement of about 50.16% was finally achieved. In the future, we plan to conduct research on physical data weight reduction based on the advanced material mapping automation function and the large-capacity BIM model.

Development of an Algorithm for Automatic Quantity Take-off of Slab Rebar (슬래브 철근 물량 산출 자동화 알고리즘 개발)

  • Kim, Suhwan;Kim, Sunkuk;Suh, Sangwook;Kim, Sangchul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.52-62
    • /
    • 2023
  • The objective of this study is to propose an automated algorithm for precise cutting length of slab rebar complying with regulations such as anchorage length, standard hooks, and lapping length. This algorithm aims to improve the traditional manual quantity take-off process typically outsourced by external contractors. By providing accurate rebar quantity data at BBS(Bar Bending Schedule) level from the bidding phase, uncertainty in quantity take-off can be eliminated and reliance on out-sourcing reduced. In addition, the algorithm allows for early determination of precise quantities, enabling construction firms to preapre competitive and optimized bids, leading to increased profit margins during contract negotiations. The proposed algorithm not only streamlines redundant tasks across various processes, including estimating, budgeting, and BBS generation but also offers flexibility in handling post-contract structural drawing changes. In particular, the proposed algorithm, when combined with BIM, can solve the technical problems of using BIM in the early phases of construction, and the algorithm's formulas and shape codes that built as REVIT-based family files, can help saving time and manpower.