• 제목/요약/키워드: 자동부하분담장치

검색결과 2건 처리시간 0.022초

동적계획법을 이용한 선내 발전시스템의 최적부하분담 방법에 관한 연구 (A Study on Optimal Electric Load distribution of Generators on board using a Dynamic Programming)

  • 유희한
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제24권3호
    • /
    • pp.106-112
    • /
    • 2000
  • Since the oil crisis, we have been concerned about the energy saving techniques of electric generating systems. As a part of the effort to save energy, automatic electric load sharing device was developed. Usually, ship's electric generating system consists of two or three sets of generator. And, electric generating system is operated as single or parallel operation mode according to the demanded electric power. Therefore, it is important to investigate generators operating mode for the supply of required electric power in the ship in order to decrease the operating cost. So, this paper suggests the method to solve the optimal electric load distribution problem by dynamic programming. And, this thesis indicates that the proposed method is superior to the lagrange multiplier's method in obtaining optimal load distribution solution in the ship's electric generating system.

  • PDF

동기발전기의 계통병입 운전 조건과 실제 회로구성 (The Conditions and Circuits for Synchronous Generator Parallel Operation)

  • 김종안;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2060-2062
    • /
    • 2001
  • 전기를 에너지원으로 사용하는 각 종 부하는 가정, 공장 및 상가 등에 널리 분산되어 있고, 여기에 전기를 생산 공급하는 발전기도 지역적으로 분산되어 병렬운전이 되고 있다. 새로운 발전기가 병렬운전에 참여하기 위해서는 기존 운전되고 있는 전력계통과의 전압, 주파수, 상회전, 위상이 일치하여야 한다. 만약 이들 조건이 갖추어지지 않은 상태에서 임의 병렬 접속을 시도하게 되면 해당 발전기는 물론 전체 계통에 충격과 손상을 초래할 수 있다. 양측의 전압과 주파수 비교는 상용 계측기를 사용하여 비교적 쉽게 할 수 있느나, 상회전 방향과 위상차의 판별에는 세심한 주의가 필요하다. 최근의 발전기에는 병렬 운전 조건을 자동으로 조정, 확인을 하는 장치를 채용하고 있으며 구체적인 회로구성과 동작원리를 여기에서 살펴보았다. 병렬 접속이 이루어진 후 발전기 별 전력 분담과, 계통 주파수 변동에 따라 자동으로 발전기 출력 제어가 이루어지는 기능이 터빈 조속기 측에 설정되어 사용된다.

  • PDF