• Title/Summary/Keyword: 임시경계점표지

Search Result 2, Processing Time 0.015 seconds

A Study on the Establishment of Boundary Monuments and Management of Records in Cadastral Resurvey Project (지적재조사사업의 경계점 표지 설치 및 등록부 관리의 개선 방안)

  • Lee, Hyun-Joon;Hong, Sung-Eon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.10
    • /
    • pp.4514-4522
    • /
    • 2012
  • In this study, we presented the improved plans for establishment of boundary monuments and management of records in cadastral resurvey project after examining the Special Act on Cadastral Resurvey which has some problems of them. As the result, we proposed that it is necessary to change the color of boundary monuments for distinguishing with the existing one. And also, they should be established at the confirmed boundary points which land owners have already accepted through the temporary boundary monuments. In addition, the register of boundary monuments has to be unified with present records because they are very similar. We hope that the government should adapt these proposals for the successful project.

A Study on Efficient Methods of Cadastral Resurvey Responsible Agency Operation (지적재조사 책임수행기관 운영의 효율화 방안 연구)

  • Lee, Jae-Hyuk;Hong, Sung-Eon
    • Journal of Industrial Convergence
    • /
    • v.20 no.8
    • /
    • pp.33-40
    • /
    • 2022
  • In this study, we tried to suggest a plan to improve the efficiency of operation after analyzing the actual conditions by selecting case areas operated by the cadastral resurvey responsible agency system. The research results are as follows. In the evaluation of the selection of a cadastral resurvey agency, a method to raise the qualitative evaluation score was suggested. The expansion of support for the cadastral resurvey agency made it possible to automatically connect and install when the LandyGo program is updated, and suggested that prior training should be stipulated in the related regulations. In the performance of cadastral resurvey surveying and division of duties, the installation of temporary boundary monuments and determine boundary monuments should be integrated. And this suggested the direction of conserving the project cost of the cadastral resurvey agency through joint implementation. Also, in the short-term and long-term perspectives, a plan for realization of project cost distribution in connection with the expansion of the entrustment of the cadastral resurvey responsible agency was presented. If the responsible agency system is operated by reflecting the results of this research, it is expected to improve the satisfaction of the project participants and shorten the project period.