A Study on the Review of Repair Methods and Repair Materials for the Prevention of Fire spread of Building Exterior Materials (건축물 외장재의 화재확대방지를 위한 보수구법 및 보수재료 검토에 관한 연구)

  • Lee, Byeong-Heun;Jin, Seung-Hyeon;Park, Sung-Ha;Kwon, Young-Jin
    • Fire Science and Engineering
    • /
    • v.33 no.3
    • /
    • pp.105-111
    • /
    • 2019
  • In Korea, the results of a field survey on the construction of flammable exterior materials implemented in 2018 revealed that 147,559 buildings belong to this category. It was found that the fire spreading cases in upper and adjacent constructions are about 3,500 per year, the fires of starting in flammable exterior material are about 1,500 per year. In this study, we investigated the repair method of buildings constructed by flammable exterior material and conducted performance verification of each repair materials for prevention of similar fire. In the case of the repair method, a method of reinforcing with a repair material after removing the existing building finishing material and a method of attaching the repair material after performing the face finishing are proposed. In addition, we conducted cone calorimeter tests of 6 materials such as fireproof gypsum board, mineral wool, hard urethane foam, ceramic board and ALC panel as dryvit and repairing materials, and investigated basic combustion performance of that materials.

Stability Analysis and Design of the Pretension Soil Nailing System (프리텐션 쏘일네일링 시스템의 안정해석 및 설계)

  • Park Si-Sam;Kim Hong-Taek;Choi Young-Geun
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.197-206
    • /
    • 2004
  • The ground anchor support system may not be occasionally used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then could play important roles to reduce deformations mainly in the upper part of the nailed-soil excavation system as well as to improve local stability. In this study, a newly modified soil nailing technology named as the PSN (Pretension Soil Nailing), is developed to reduce both facing displacements and ground surface settlements in top-down excavation process as well as to increase the global stability. Up to now, the analytical procedure and design technique are proposed to evaluate maximum pretension force and stability of the PSN system. Also, proposed are techniques to determine the required thickness of a shotcrete facing and to estimate probability of a failure against the punching shear, Based on the proposed procedure and technique, effects of the radius of a influence circle and dilatancy angle on the thickness of a shotcrete facing, bonded length and safety factors are analyzed. In addition, effects of the reduction of deformations expected by pretension of the soil nails are examined in detail throughout an illustrative example and the $FLAC^{2D}$ program analysis. And a numerical approach is proposed PSN system using the shear strength reduction technique with the $FLAC^{2D}$ program.

Lateral Earth Pressure Caused by Action on Earth Retaining Wall in Clay Foundation Ground with Consideration of Construction Speed (지중 구조물에 작용하는 측방토압에 대한 성토 재하 속도의 영향)

  • Im Eun-Sang;Lee Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.57-68
    • /
    • 2004
  • When an embankment is constructed on soft clay ground, the lateral displacement generally called as lateral flow is generated in the foundation ground. It strongly affects stabilities of structures, such as foundation piles and underground pipes, in and on the foundation ground. The lateral earth pressure induced by the lateral flow is influenced by the magnitude and construction speed of embankment, the geometric conditions and geotechnical characteristics of the embankment, and the foundation ground, and so on. Accurate methods for estimating the lateral earth pressure have not ever been established because the lateral flow of a foundation ground shows very complicated behavior, which is caused by the interaction of shear deformation and volumetric deformation. In this paper, a series of model tests were carried out in order to clarify effects of construction speed of an embankment on the lateral earth pressure in a foundation ground were design. It was found that the magnitude and the distribution of the lateral earth pressure and its change with time are dependent on the construction speed of the embankment. It was found that a mechanism for the lateral earth pressure was generated by excess pore water pressure due to negative dilatancy induced by shear deformation under the different conditions of construction speeds of embankments.

A Study on the Pile Behaviour Adjacent to Tunnel Using Photo Imaging Process and Numerical Analysis (Photo Imaging Process 기법 및 수치해석을 이용한 터널주변 파일기초거동에 대한 연구)

  • Lee Yong-Joo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.9
    • /
    • pp.87-102
    • /
    • 2005
  • In the congested urban areas, tunnelling close to existing structures or services often occurs due to the lack of surface space so that tunnelling-induced ground movements may cause a serious damage to the adjacent structures. This study focused on the two dimensional laboratory model pile-soil-tunnelling interaction tests using a close range photogrammetric technique. Testing equipments and procedures were Introduced, particularly features of aluminium rods regarded as the frictional granular material. The experimental result showed that the photo imaging process by the VMS and EngVis programs proved to be a useful tool in measuring the pile tip movements during the tunnelling. Consequently, the normalised pile tip movement data for the influence zones can be generated by the laboratory model tests using the Photogrammetric technique. This study presents influence zones associated with the normalized pile tip settlements due to tunnelling in the cohesionless material. The influence zones were Identified by both a laboratory model test and a numerical analysis. The normalized pile tip movements from the model test were in good agreement with the numerical analysis result. The influence zones proposed in this study could be used to decide the reasonable location of tunnel construction in the planning stage. However, the scale of model pile and model tunnel sizes must be carefully adjusted as real ones for practical application considering the ground conditions at a given site.

Lateral Load Test on the Bar-type Anti-buoyancy Anchors in the Weathered Rock (풍화암에 시공된 Bar Type 부력앵커의 수평재하시험)

  • Park, Chan-Duk;Lee, Kyu-Hwan;Ryu, Nam-Jae;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.8 no.4
    • /
    • pp.165-174
    • /
    • 2004
  • This study is about a horizontal load test of buoyance anchor installed in the section where underground water level happens in the depth of 5m under the ground when the ground is excavated, because the section as a excavation section of high speed railway ${\bigcirc}{\bigcirc}$ station is near a rivers and because the section always has a reservoir of full water level on the left. Therefore, in this study we will appraise the long-term stability of the structure permanently being taken buoyance by the underground water level, through the spot test of the buoyance anchor installed in the section where underground water level happens. For that, Bar Type anchor is used, which can get enough pulling-out force by a method to resist buoyance by using friction force against the ground by high strength steel rod or steel wire. Anti-buoyance anchor is installed on the bottom slab of underground structure being taken horizontal force by the braking and accelerating of high speed train. And, It is aimed to analyze and grasp the review result of stability for the horizontal force that happens at the parking and stopping of high speed train, by executing horizontal load test for the grasping of the movements characteristic of buoyance anchor.

An Experimental Study on Behavior Characteristics of the Pretension Soil Nailing Systems (프리텐션 쏘일네일링 시스템의 거동특성에 관한 실험적 고찰)

  • Choi, Young-Geun;Shin, Bang-Woong;Park, Si-Sam;Kim, Hong-Taek
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.2
    • /
    • pp.87-96
    • /
    • 2004
  • Application of the soil nailing method is continuously extending in maintaining stable excavations and slopes. However, ground anchor support system occasionally may not be used because of space limitations in urban excavation sites nearby the existing structures. In this case, soil nailing system with relatively short length of nails could be efficiently adopted as an alternative method. The general soil nailing support system, however, may result in excessive deformations particularly in an excavation zone of the existing weak subsoils. Pretensioning the soil nails then could play important roles to reduce deformations mainly in an upper part of the nailed-soil excavation system as well as to improve local stability. In this study, a newly modified soil nailing technology named as the PSN (Pretension Soil Nailing) is developed to reduce both facing displacements and ground surface settlements in top-down excavation process as well as to increase the global stability. Up to now, the PSN system has been investigated mainly focusing on an establishment of the design procedure. In the present study, laboratory model tests are carried out to investigate the failure mechanism and behavior characteristics of the PSN system. Various results of model tests are also analyzed to provide a fundamental basis for the efficient design.

Induction coordination of the 154KV system with direct grounding (154KV 계통직접접지전환에 따른 유도협조)

  • 손필영;원준희
    • 전기의세계
    • /
    • v.18 no.1
    • /
    • pp.33-37
    • /
    • 1969
  • 한전은 1968년 11월 3일 오전 10시 04분을 기하여 154KV 전계통의 직접접지방식 전환을 단행하였다. 종전의 P.C(소고선륜) 중성점접지방식을 직접접지방식으로 전환한것으로서 전력사상 특기 할 만한 근대화사업이며 다년간을 두고 추진해온 중요과제였다. 전력계통의 확대와 복잡화는 선진국가에서도 실시하고 있는 직접접지방식의 채택을 불가변하게 하였고 또한 1차 AID송배전차관도 이의 채택을 조건부로 승인되었던 것으로서 1968년 이후에 건설되는 송변전기기는 직접접지계에서만 운전할 수 있는 절연Level 650KV급이 도입되어 부산화력발전소 3호기가 준공되는 1968년 10월말까지는 직접접지전환이 반드시 이루어져야 하는 실정에 놓여 있었다. 그런데 직접접지방식의 단점인 인접통신선에 미치는 유도장해를 해결하는 문제가 다년간을 두고 진지하게 검토되어 왔으나 해결이 늦어지고 있었다. 사유는 154KV 계통에 인근된 통신선이라면 체신부, 내무부, 교통부, 국방부등 여러기관의 것이 있는데, 유도장해보안방법과 유도보상비문제에 대하여 전력측(상공부, 한전)과 통신측(상기의 체신부등)의 견해차가 해소되지 않기 때문이었다. 그것이 1968년 5월에 와서 전력.통신쌍방이 범국가적입장에서 제반애로를 무릅쓰고 최소한의 투자로 가능한 범위내의 보안책으로서 우선 Arrester 보안방식을 채택하기로 합의되어 경제장관회의를 거쳐 시공하기에 이른것이다. 이 란을 빌려 이 사업의 필요성과 경위및 통신선유도장해방지를 위한 보안방식내용을 간단히 소개함으로써 앞으로 이 분야의 항구적인 유도대책연구에 다소나마 참고가 된다면 다행으로 생각하겠다.면서 예측강우의 질이 저하되기 시작하였으나 QPM을 합성함으로써 생산한 BQPF는 보다 신뢰성있고 양호한 결과를 얻을 수 있었다. 이러한 결과들은 향후 정량적 분포형강우 예측을 이용한 실시간 홍수유출 예측시 댐운영자는 리드타임(홍수선행시간)을 충분히 확보함으로서 안정적이고 예측 가능한 홍수조절을 하는데 도움을 줄 수 있을 것으로 기대된다. 이와 같이 다양한 단기저수지 유입량의 예측정보 제공으로 다목적댐 저수지 운영모형의 효용성을 제고하여 향후 실제 저수지 유입량 예측에 이용함으로써 저수지 단기운영효율 개선에 기여할 수 있을 것으로 사료된다.다. 이것은 여름철 강수량이 증가하고, 호우발생빈도, 특히 8월의 강수일수가 증가하고 있다는 것과 밀접한 관련이 있다. 여름과 가을에 우리나라에 영향을 미치는 태풍의 수는 뚜렷한 추세를 보이지 않으나, 2002년 루사, 2003년 매미로 인하여 각각 6조원, 4조원 이상의 막대한 피해가 발생하였다. 태풍에 의한 피해액은 GDP 대비 약 0.9%(태풍 루사)로 최근 경제상장률과 비교해 보면, 상당한 비율을 차지한다. 우리나라에 영향을 미치는 태풍은 연근해의 해수면 온도가 높아지면 세기가 강해질 가능성이 높다. 폭설과 한파일수도 평년대비 최근 10년 감소하였고 일최저기온이 영하 $10^{\circ}C$ 이하인 날도 연간 발생일수가 감소하였다. 최근 10년간 우리나라 기후의 변화특성은 기온상승과 더불어 서리종료일이 앞당겨지고 열대야가 증가하고 폭설, 한파, 겨울철 일최저기온 영하 10도 이하인 날의 감소 등이 나타나고, 여름철 재해의 원인인 호우일수는 증가하는 추세이다.

  • PDF

A Comparison Study between Top-down Load Test and Bi-directional Load Test Analysis Method in Rock-socketed Small Size Drilled Shaft (암반소켓된 소구경 현장타설말뚝의 정재하시험과 양방향재하시험 분석법 비교연구)

  • Song, Myungjun;Song, Younghun;Jung, Minhyung;Park, Youngho;Park, Jaehyun;Lee, Juhyung;Chung, Moonkyung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.9
    • /
    • pp.5-12
    • /
    • 2013
  • In this study, each top-down load test and bi-directional load test has been performed on the 480mm diameter of two rock socketed drilled shafts, which are located next to each other, and the results have been compared. The result shows that the settlement from the equivalent load-settlement curve of bi-directional load test is smaller than one from top-down load test, because elastic is not considered in equivalent load-settlement curve of bi-directional load test. Therefore elastic shortening should be considered to obtain appropriate equivalent load-settlement curve. Three existing methods used to obtain equivalent load-settlement curve with consideration of elastic shortening has been compared with the result of top-down load test. The result shows that those existing methods are sufficiently applicable to the design. In addition, result of comparison between top-down load test and bi-directional load test shows that bi-directional load test was found to overestimate bearing capacity because it does not consider pile body failure.

Stability analysis of an existing utility tunnel due to the excavation of a divergence tunnel emerging from double-deck tunnel (복층터널의 분기터널 굴착에 따른 지하 공동구의 안정성 분석)

  • Nam, Kyoung-Min;Choi, Min-ki;Kim, Jung-Joo;Jafri, Turab H.;Yoo, Han-Kyu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.2
    • /
    • pp.231-248
    • /
    • 2017
  • Government plans to construct a double-deck tunnel under a portion of Gyeongbu Expressway that will solve traffic problems and could also be used as a flood storage facility. Divergence tunnels connect the main tunnel to the urban areas and their construction effects on adjacent structures at shallow depth need to be analyzed. This study primarily includes the numerical analysis of construction effects of divergence tunnels on utility tunnels. The utility tunnel was analyzed for three cases of volume loss applied to the divergence tunnel and two cases of the angle between main tunnel and divergence tunnel ($36^{\circ}$ and $45^{\circ}$). The results show that the more the volume loss was applied and the shorter the distance was between utility tunnel and divergence tunnel, the more the utility tunnel was affected in terms of induced displacements, angular displacement and stability. The worst scenario was found out to be the one where the angle between main tunnel and divergence tunnel was $36^{\circ}$ and the distance between divergence tunnel and utility tunnel was 10 m, resulting in the largest displacement and differential settlement at the bottom of the utility tunnel. A relationship between the angular displacement and the distance to diameter ratio was also established.

Behavior of Walls of Open-cell Caissons Using Filler under Abnormally High Waves (고파랑 대비 채움재를 이용한 오픈 셀 케이슨의 전단 벽체 거동 분석)

  • Seo, Jihye;Won, Deokhee;Park, Woo-Sun
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.29 no.2
    • /
    • pp.83-91
    • /
    • 2017
  • In order to cope with the abnormally high waves during the storm surge due to climate change, various methods have been proposed for interlocking adjacent caissons to enhance stability of harbor structures. Among the methods, it was studied the method based on an open-cell caisson having reduction effect increasing the cohesion with adjunction caissons by filling materials such as crushed rocks in an inter-cell formed by two facing open-cells which consist of transverse walls. It is necessary to investigate the shear behaviors of an inter-cell to secure the stability using calculating shear forces on inter-cell under oblique wave loadings. It was analyzed the shear force share ratio with the length of internal and external wall and the number of internal walls. Numerical results show that 60~70% of the shear load is transmitted to adjacent caisson through the internal walls, more than 30% is through the external wall. It was applicable in the assumption that filling materials was uniformly distributed in inter-cells, and further studies were worth consideration on other conditions under construction.