• Title/Summary/Keyword: 인접굴착

Search Result 177, Processing Time 0.026 seconds

An Analysis of Safety Zone Appropriateness of Urban Railway Box Structures by Adjacent Excavation Using Machine Learning Technique (머신러닝 기법을 적용한 인접굴착에 따른 도시철도 박스구조물의 안전영역 적정성 분석)

  • Jung-Youl Choi;Jae-Seung Lee;Jee-Seung Chung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.9 no.3
    • /
    • pp.669-676
    • /
    • 2023
  • This study analyzed the relationship between major parameters and numerical analysis results according to various excavations conducted around the urban railway, application of machine learning techniques and verified the scope of influence of the adjacent excavation on the existing urban railway box structure and the appropriateness of the safety area. This study targeted the actual negotiated adjacent excavation works and box structures around the urban railway, and the analysis was conducted on the most representative two-line box structures. The analysis confirmed that the difference in depth of urban railway, excavation depth of adjacent excavation, and depth of underground water level are important parameters, and the difference in excavation depth of adjacent excavation is the parameter that affects the behavior of underground box structures and is an important requirement for setting safety areas. In particular, the deeper the depth of the adjacent excavation work, the greater the effect on the deflection of the underground box structure, and the horizontal separation distance, one of the important requirements for determining the management grade of the existing adjacent excavation work, is relatively small.

A Case Study on Reinforcement Method by Excavation Adjacent to the Subway Tunnel using Numerical Analysis (수치해석을 통한 지하철 구조물 인접 굴착에 따른 보강공법 적용사례연구)

  • Byun, Yo-Seph;Jung, Kyoung-Sik;Chun, Byung-Sik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.12 no.9
    • /
    • pp.5-11
    • /
    • 2011
  • Recently, large and deep excavations are increasing. The damage of adjacent structures due to excavation has steadily increased with increasing construction demand. Especially in urban development and poor conditions, the excavation adjacent to the subway structures has caused a lot of problems. This paper was reviewed that the underground excavation and reinforcement of the status process through a case study on the field. And stability analysis through the case study evaluates applicability for reasonable reinforcement method by numerical analysis. As a result, the strata distribution condition of all 16 sites consisted of landfill from the top and distributed in the order of deposits, weathered soils, weak rock from the bottom. Also, when proceeding the excavation adjacent to structures, the location of site and layer conditions have highly effect on the results of the construction. Therefore, this study was applied reinforcement method to protect damage by excavation. Displacement and settlement were within allowable criterion and hence, stability of structure was analyzed as safe.

Analysis of ground settlement due to circular shaft excavation (원형 수직구 굴착에 따른 발생 지반침하 분석)

  • Moorak Son;Kangryel Lee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.25 no.2
    • /
    • pp.87-99
    • /
    • 2023
  • Ground excavation inevitably causes ground displacement of adjacent ground, and structures and facilities exposed to ground displacement may suffer various damages. Therefore, in order to minimize the damage and damage to adjacent structures and facilities caused by excavation, ground displacement (settlement and horizontal displacement) in the adjacent ground caused by excavation must first be predicted. There is many ground displacement information induced by general braced cut excavation, but the information is not enough for circular shaft excavation. This study aims to provide information on the estimation of ground settlement caused by circular shaft excavation through the case analysis of circular shafts and comparison with braced cut excavation. From this study, it was found that the use of the settlement criterion of braced cut excavation as the settlement management criterion for circular shaft excavation is a conservative approach in terms of safety. But when considering the economic aspect, it may result in overdesign of the wall and therefore, a more reasonable settlement criterion can be needed for circular shaft excavation.

Numerical Analysis of Track Irregularity in Excavation Adjacent to Railway Trackbed (수치해석을 통한 철도노반 인접 굴착 시 궤도틀림 분석)

  • Seokjun Lee;Dongwook Oh;Seongmin Jang;Batchimeg, Banzragchgarav;Hyuksang, Jung
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.12
    • /
    • pp.39-45
    • /
    • 2023
  • In this paper, a track irregularity according to adjacent deep excavation of railway was analyzed using three-dimensional numerical analysis. The construction for excavation adjacent to the railway track is likely to have a negative impact on train operations. Despite mandatory assessments of the stability and impact on adjacent structures during construction, reports continue to indicate ongoing settlement and track irregularity resulting from construction. Changes in the groundwater level and stress state of the ground due to excavation are pointed out as causes for settlement and track irregularity in structures adjacent to the excavation. In this study, therefore, numerical analysis was conducted taking into account factors that induce track irregularity during adjacent excavation work as variables. The KRL-2012 standard train load was applied to simulate operating trains. As a results, The position of the train load, the distance from the excavation point, had a significant impact on track irregularity, and there was a significant occurrence of track misalignment when the train load was applied. The impact of the groundwater level was not significant.

A Study on Track Deformation Characteristics of Turnout System by Adjacent Excavation Work on Urban Transit (인접굴착공사에 따른 도시철도 분기기 궤도의 변형 특성에 관한 연구)

  • Kim, Hae-Sung;Choi, Jung-Youl;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.8 no.5
    • /
    • pp.477-482
    • /
    • 2022
  • The structure of the turnout track is very complex, so it is a facility that is more difficult to maintain and requires detailed management than a general track type. The purpose of this study is to analyze the effect on the deformation of the turnout system of the ground section due to the excavation work adjacent to the serviced urban railways. In this study, based on finite element analysis for each stage of adjacent excavation, the track deformation for each major location of turnout system was analyzed in consideration of the layout of the turnout system installed on the ground section, and the safety and stability was confirmed by comparing it with the track irregularity regulation. As a result of the study, it was found that the major construction stage affecting the track deformation of the turnout system on the ground section was the final stage of excavation. In addition, although the vertical displacement which is a vertical irregularity occurred relatively large, it was analyzed that the horizontal deformation was dominant overall, because of the excavation site is located on the side of the turnout system. In addition, it was analyzed that the amount of displacement at each major location of the turnout system is different, and there is a possibility that there may be a twist irregularity due to the deviation of the track deformation for each location according to the distance from the excavation site. Therefore, it was analyzed that it is necessary to classify and manage the importance of the track deformation of the turnout system of actual operating line, including additional displacement due to adjacent excavation, based on the track irregularity that has occurred at each location where the major deformation characteristics occur.

Analysis of Perimetrical Ground Settlement Behavior for Deep Excavations in Urban Areas (도심지 깊은 굴착으로 발생하는 인접 지반 지표침하 분석)

  • 양구승;김명모
    • Geotechnical Engineering
    • /
    • v.13 no.2
    • /
    • pp.101-124
    • /
    • 1997
  • Adjacent ground surface settlements by deep excavations are analyzed by field observations in the areas where excavations are performed in sandy soils or weathered soils underlain by rocks, First, the magnitude and the distribution of ground surface settlements, which are developed before main excavation activities (e. g., diaphragm wall installation and center pile installation) , are measured and analyzed. Secondly, the magnitude and the distribution of ground surface settlements by main excavation are measured and analyzed. And the results are compared with the predictions obtained by the empirical methods. Through case studies performed on the excavation sites where adjacent ground surfaces or structures are damaged by excavation activities, upper limit location of ground surface cracks are investigated.

  • PDF

Evaluation of Structural Stability of Tunnel due to Adjacent Excavation on Urban Transit (도시철도 인접굴착공사에 따른 터널구조물의 구조 안정성 평가)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.503-508
    • /
    • 2020
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, As a result of analyzing the track deformation level of the existing tunnel due to the excavation work adjacent to the urban transit, it was found that the evaluation criteria (allowed values) of conventional railways lines were satisfied. Based on the numerical analysis, it was analyzed that the results of the prediction of the tunnel structural stability of due to the excavation work and the level of the tunnel deformation occurring at the actual site could be approximated as closely as possible.

A Model Test on the Settlements of Adjacent Structures by Excavation (모형실험을 통한 굴착시 인접 구조물의 침하량 평가)

  • 석정우;최광철;김운영;김명모
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.2
    • /
    • pp.17-27
    • /
    • 1999
  • It comes to be an important point to judge precisely the effects of excavation on adjacent ground and structures. It is incorrect to evaluate the ground settlement by excavation without considering the adjacent structure. In this study, laboratory scale tests were carried out by varying the position of structure under the condition of different system stiffness and wall friction to evaluate the behavior of adjacent structures and ground by excavation. When the distance between the structures and the wall was less than 0.3 times of the excavation depth, the ground settlement increased by 181%. No additional effect was observed when the distance was more than 1.0H. As the embedded depth was deeper, the influence zone was smaller, and few additional settlements and angular displacement were observed when the embedded depth was more than 0.75H.

  • PDF

Evaluation of Track irregularity due to Adjacent Excavation Work on Serviced Urban Transit (도시철도 인접굴착공사에 따른 운행선 궤도의 궤도틀림 분석)

  • Choi, Jung-Youl;Lee, Ho-hyun;Kang, You-Song;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.6 no.2
    • /
    • pp.481-487
    • /
    • 2020
  • In this study, finite element analysis was performed to evaluate the track irregularity of the existing track system on urban transit according to the large-scale excavation work that is constructed adjacent to the serviced line. Based on the numerical analysis, the effect of track irregularity generated during the step-by-step construction process was analytically derived, and the stability in terms of track deformation was evaluated through comparison with related standards. As the results, in the case of track irregularity items evaluated based on the relative displacement difference at a certain distance, such as alignment and vertical irregularity, it occurred most clearly at the location where deformation of the existing structure begins, such as the end point of adjacent excavation work. On the other hand, the overall vertical and horizontal displacement of the track was the largest deformation at the center of the construction section. The vulnerable position of the deformed side of the existing structure due to adjacent excavation is analytically proven that the both of the end point section and the center of the construction can be a vulnerable position in terms of track irregularity.

구조물 및 시설물이 인접한 구릉지 암반굴착 발파설계

  • 류창하;선우춘;신희순;정소걸;최병희
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 1994.03a
    • /
    • pp.81-88
    • /
    • 1994
  • 본 연구는 S시의 택지개발사업지역을 대상으로 암반굴착 작업을 위한 발파설계 기준의 마련과 효율적인 발파공법을 도출하기 위한 목적으로 수행되었다. 대상지역은 구획 정리사업이 본격화됨에 따라 풍화암을 포함한 리핑가능한 부분에 대한 절토작업이 거의 완료되고 리핑방법을 적용하기 어려운 암굴착을 위하여 화약발파를 이용한 암발파 작업이 요구되고 있으나 인접한 지역에 주요 구조물들과 micron/sec 단위의 허용수준을 요구하는 진동에 매우 민감한 시설물들이 있어 발파작업으로 인한 지반진동의 영향문제가 매우 심각한 지역이다. (중략)

  • PDF