• Title/Summary/Keyword: 인공수압파쇄공법

Search Result 2, Processing Time 0.016 seconds

Improving Groundwater Recovery by Hydrofracturing (인공수압파쇄기법에 의한 지하수 양수량 증대)

  • 한정상;안종성;윤윤영;김형수;백건하
    • Journal of Soil and Groundwater Environment
    • /
    • v.7 no.2
    • /
    • pp.23-33
    • /
    • 2002
  • There are two case history. One is the case of 3 wells-group well system-drilled and artificially hydrofractured for dewatering to help to excavate and treat deep building foundation. The recoveries of groundwater of 3 wells are increased 29%, 42% and 110% respectively through hydrofracturing. Simultaneous pumping test reveals that 3 wells are geohydrologically interconnected considering lowered specific capacity comprising influence of additional drawdown effect by other 2 wells compared to single well test. Response time effect during single well test shows that dorminant lineaments are more expandable to other geological structures. The other one is the case of 28% increasing of groundwater productivity for domestic use by hydrofracturing.

Development of Intelligent System to Select Production Method in Coalbed Methane Reservoir (석탄층 메탄가스 저류층의 생산방법 선정을 위한 지능형 시스템 개발)

  • Kim, Chang-Jae;Kim, Jung-Gyun;Lee, Jeong-Hwan
    • Journal of the Korean Institute of Gas
    • /
    • v.18 no.2
    • /
    • pp.1-9
    • /
    • 2014
  • To develop a coalbed methane(CBM) reservoir, it is important to apply production methods such as drilling, completion, and stimulation which coincide with coal properties. However, the reliability of the selected resulted in most of CBM field is not enough to accept because the selection of production method has been done by empirical decision. As the result, the empirical decision show inaccurate results and need to prove using simulation whether it was true exactly. In this study, the intelligent system has been developed to assist the selection of CBM production method using artificial neural network(ANN). Before the development of the system, technical screening guideline was analyzed by literature survey and the system to select drilling and completion method, and hydraulic fracture fluid was developed by utilizing the guideline. The result as a validation of the developed system showed a high accuracy. In conclusion, it has been confirmed that the developed system can be utilized as a effective tool to select production method in CBM reservoir.