• Title/Summary/Keyword: 응력분포

Search Result 1,821, Processing Time 0.038 seconds

Design and Full Size Flexural Test of Spliced I-type Prestressed Concrete Bridge Girders Having Holes in the Web (분절형 복부 중공 프리스트레스트 콘크리트 교량 거더의 설계 및 실물크기 휨 실험 분석)

  • Han, Man Yop;Choi, Sokhwan;Jeon, Yong-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3A
    • /
    • pp.235-249
    • /
    • 2011
  • A new form of I-type PSC bridge girder, which has hole in the web, is proposed in this paper. Three different concepts were combined and implemented in the design. First of all, a girder was precast at a manufacturing plant as divided pieces and assembled at the construction site using post-tensioning method, and the construction period at the site will be reduced dramatically. In this way, the quality of concrete can be assured at the manufacturing factory and concrete curing can be well controlled, and the spliced girder segments can be moved to the construction site without a transportation problem. Secondly, a numerous number of holes was made in the web of the girder. This reduces the self-weight of the girder. But more important thing related to the holes is that about half of the total anchorages can be moved from the girder ends into individual holes. The magnitude of negative moment developed at girder ends will be reduced. Also, since the longitudinal compressive stresses are reduced at ends, thick end diaphragm is not necessary. Thirdly, Prestressing force was introduced into the member through multiple stages. This concept of multi-stage prestressing method overcomes the prestressing force limit restrained by the allowable stresses at each loading stage, and maximizes the magnitude of applicable prestressing force. It makes the girder longer and shallower. Two 50 meter long full scale girders were fabricated and tested. One of them was non-spliced, or monolithic girder, made as one piece from the beginning, and the other one was assembled using post-tensioning method from five pieces of segments. It was found from the result that monolithic and spliced girder show similar load-deflection relationships and crack patterns. Girders satisfied specific girder design specification in flexural strength, deflection, and live load deflection control limit. Both spliced and monolithic holed web post-tensioned girders can be used to achieve span lengths of more than 50m with the girder height of 2 m.

A study on the effect of tunnelling to adjacent single piles and pile groups considering the transverse distance of pile tips from the tunnel (말뚝의 횡방향 이격거리를 고려한 터널굴착이 인접 단독말뚝 및 군말뚝에 미치는 영향에 대한 연구)

  • Jeon, Young-Jin;Kim, Sung-Hee;Lee, Cheol-Ju
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.637-652
    • /
    • 2015
  • In the present work, a number of three-dimensional (3D) parametric numerical analyses have been carried out to study the influence of tunnelling on the behaviour of adjacent piles considering the transverse distance of the pile tip from the tunnel. Single piles and $5{\times}5$ piles inside a group with a spacing of 2.5d were considered, where d is the pile diameter. In the numerical modelling, several key issues, such as the tunnelling-induced pile settlements, the interface shear stresses, the relative shear displacements, the axial pile forces, the apparent factors of safety and zone of influence have been rigorously analysed. It has been found that when the piles are inside the influence zone, the pile head settlements are increased up to about 111% compared to those computed from the Greenfield condition. Larger pile settlements and smaller axial pile forces are induced on the piles inside the pile groups than those computed from the single piles since the piles responded as a block with the surrounding ground. Also tensile pile forces are induced associated with the upward resisting skin friction at the upper part of pile and the downward acting skin friction at the lower part of pile. On the contrary, when the piles were outside the influence zone, tunnelling-induced compressive pile forces developed. Based on computed load and displacement relation of the pile, the apparent factor of safety of the piles was reduced up to about 45%. Therefore the serviceability of the piles may be substantially reduced. The pile behaviour, when considering the single piles and the pile groups with regards to the influence zone, has been analysed by considering the key features in great details.

THE THREE DIMENSIONAL FINITE ELEMENT ANALYSIS OF STRESS DISTRIBUTION AND DEFORMATION IN MANDIBLE ACCORDING TO THE POSITION OF PONTIC IN TWO IMPLANTS SUPPORTED THREE-UNIT FIXED PARTIAL DENTURE (두 개의 임플란트를 이용한 3본 고정성 국소의치에서 가공치 위치에 따른 하악골에서의 응력 분포 및 변형에 관한 삼차원 유한요소법적 연구)

  • Kim, Dong-Su;Kim, Il-Kyu;Jang, Keum-Soo;Park, Tae-Hwan;Kim, Kyu-Nam;Son, Choong-Yul
    • Journal of the Korean Association of Oral and Maxillofacial Surgeons
    • /
    • v.34 no.2
    • /
    • pp.166-179
    • /
    • 2008
  • Excessive concentration of stress which is occurred in occlusion around the implant in case of the implant supported fixed partial denture has been known to be the main cause of the crestal bone destruction. Therefore, it is essential to evaluate the stress analysis on supporting tissue to get higher success rates of implant. The purpose of this study was to evaluate the effects of stress distribution and deformation in 3 different types of three-unit fixed partial denture sup-ported by two implants, using a three dimensional finite element analysis in a three dimensional model of a whole mandible. A mechanical model of an edentulous mandible was generated from 3D scan, assuming two implants were placed in the left premolars area. According to the position of pontic, the experiments groups were divided into three types. Type I had a pontic in the middle position between two implants, type II in the anterior posi-tion, and type III in the posterior position. A 100-N axial load was applied to sites such as the central fossa of anterior and posterior implant abutment, central fossa of pontic, the connector of pontic or the connector between two implants, the mandibular boundary conditions were modeled considering the real geometry of its four-masticatory muscular supporting system. The results obtained from this study were as follows; 1. The mandible deformed in a way that the condyles converged medially in all types under muscular actions. In comparison with types, the deformations in the type II and type III were greater by 2-2.5 times than in the type I regardless of the loading location. 2. The values of von Mises stresses in cortical and cancellous bone were relatively stable in all types, but slightly increased as the loading position was changed more posteriorly. 3. In comparison with type I, the values of von Mises stress in the implant increased by 73% in Type II and by 77% in Type III when the load was applied anterior and posterior respectively, but when the load was applied to the middle, the values were similar in all types. 4. When the load was applied to the centric fossa of pontic, the values of von Mises stress were nearly $30{\sim}35%$ higher in the type III than type I or II in the cortical and cancellous bone. Also, in the implant, the values of von Mises stress of the type II or III were $160{\sim}170%$ higher than in the type I. 5. When the load was applied to the centric fossa of implant abutment, the values of von Mises stress in the cortical and cancellous bone were relatively $20{\sim}25%$ higher in the type III than in the other types, but in the implant they were 40-45% higher in the type I or II than in the type III. According to the results of this study, musculature modeling is important to the finite element analysis for stress distribution and deformation as the muscular action causes stress concentration. And the type I model is the most stable from a view of biomechanics. Type II is also a clinically accept-able design when the implant is stiff sufficiently and mandibular deformation is considered. Considering the high values of von Mises stress in the cortical bone, type III is not thought as an useful design.

Oxide Films Formed on Hot-Dip Aluminized Steel by Plasma Electrolytic Oxidation and Their Films Growth Stages (플라즈마 전해 산화법에 의해 용융알루미늄도금 강판 상 형성한 산화층과 그 성장 과정)

  • Choe, In-Hye;Kim, Chang-Min;Park, Jun-Mu;Park, Jae-Hyeok;Hwang, Seong-Hwa;Lee, Myeong-Hun
    • Proceedings of the Korean Institute of Surface Engineering Conference
    • /
    • 2017.05a
    • /
    • pp.165-165
    • /
    • 2017
  • 지난 수 십 년 동안, 전 세계적으로 자원의 소비가 급격히 증가하게 되면서 최근 자원 고갈은 물론 환경오염이 커다란 이슈로 문제가 되고 있다. 이에 따라 재료 관련 분야에 있어서는 보다 효율적이고 친환경적인 방법으로 자원을 활용해야 된다는 필요성이 대두되었고 이와 같은 관점에서 목적하는 성분이 우수하고 환경 친화적인 표면처리 재료 개발연구가 활발하게 진행되고 있는 실정이다. 그 중 플라즈마 전해 산화(Plasma Electrolytic Oxidation, PEO)는 알루미늄, 마그네슘 등의 경금속의 경도를 향상시키고 높은 내마모성, 내식성을 갖게 하는 표면처리로써 그 관심이 증가하고 있다. 이 플라즈마 전해 산화는 일반적으로 공정비용 대비 효과적이고 환경 친화적이며 코팅 성능 면에서 우수하다고 알려져 있다. 이러한 고유한 특성으로 인해 플라즈마 전해 산화 코팅은 최근 몇 년 동안 기계, 자동차, 우주항공, 의학 및 전기 산업 등의 분야에서 그 적용이 점차 증가하고 있는 상황이다. 한편, 플라즈마 전해 산화 코팅을 하는 모재들의 경우 부동태 산화피막을 용이하게 형성할 수 있는 특성의 모재에 한정되고 있어서 그 응용확대에 한계가 있는 것이 사실이다. 따라서 본 연구에서는 플라즈마 전해 산화법을 사용하여 용융알루미늄도금 강판 상에 산화피막 형성을 시도하였다. 전원공급 장치의 양극은 전해질 속에 잠겨있는 작동전극에 연결하고 음극은 대전극 역할을 하는 스테인레스강 전해질 용기에 연결되었다. 전해질은 Sodium Aluminate 및 기타 첨가제를 함유한 것을 사용하였고 온도는 열교환기를 사용하여 $30^{\circ}C$ 이하로 유지되었다. 또한 여기서 전류밀도는 $5{\sim}10A/dm^2$, 실험 주파수는 700Hz, Duty cycle은 30 및 90%의 각 조건에서 공정처리 시간을 각각 30분 및 60분 동안 진행하였다. 이와 같은 조건에서 형성한 막들에 대해서는 주사형전자현미경(SEM)을 이용하여 코팅 막의 표면 및 단면의 모폴로지를 관찰하였음은 물론 EDS 및 XRD 측정을 통하여 원소조성분포 및 결정구조를 각각 분석하였다. 또한 이 코팅 막들에 대한 내식성은 5% 염수분무 환경 중 노출시험(Salt spray test), 3% NaCl 용액에서의 침지 시험 및 전기화학적 동전위 양극분극(Potentiodynamic Polarization) 시험을 진행하여 평가하였다. 이상의 실험결과에 의하면, 제작조건별 플라즈마 전해 산화 코팅 막의 모폴로지 및 결정구조가 상이하게 나타나는 것을 알 수 있었다. 코팅 막의 모폴로지 관찰 결과, 공정 시간에 비례하여 표면에 존재하는 원형 기공의 수는 감소하였으나 그 크기가 커지고 크레이터의 직경 또한 커진 것이 확인되었다. 이 기공은 마이크로 방전에 의해 형성된다고 알려져 있는데 공정 시간이 증가함에 따라 코팅 두께가 점차 증가하여 마이크로 방전의 빈도수가 줄어들고 그 강도는 증가하게 되어 기공 크기가 증가한 것으로 사료된다. 또한 공정시간이 긴 시편에서 표면에 크랙이 다수 존재하는 것으로 확인되었다. 이것은 방전에 의해 고온이 된 소재가 차가운 전해질과 만나게 되어 생긴 큰 온도구배로 인해 강한 열응력이 발생하여 균열을 초래한 것으로 보인다. 조성원소 분석 결과 원형 기공 주변의 크레이터 영역에는 알루미늄이 풍부하였으며 그 주변에 결절상을 갖는 구조에서는 전해질 성분의 원소가 포함되어 있는 것이 확인되었다. 이러한 코팅 막의 표면 특성은 내식성에 영향을 주게 된 원인으로 사료된다. 동전위 분극측정 결과에 의하면 플라즈마 전해 산화 공정 시간이 길어질수록 부식전류밀도가 증가하였다. 이것은 공정시간이 길어짐에 따라 강한 방전이 발생하여 기공의 크기가 증가하고 크랙이 발생하게 되면서 내식성이 저하된 것으로 판단된다. 종합적으로 재료특성 분석 및 내식성 평가를 분석한 결과, 플라즈마 전해 산화의 공정 시간이 너무 길게 되면 오히려 내식성은 저하되는 것이 확인되었다. 이상의 연구를 통하여 고내식 특성을 갖는 플라즈마 전해 산화 막의 유효성을 확인하였으며 용융알루미늄강판 상에 실시한 플라즈마 전해 산화 처리에 대한 기초적인 응용 지침을 제시할 수 있을 것으로 사료된다.

  • PDF

A Study on the Behaviour of Prebored and Precast Steel Pipe Piles from Full-Scale Field Tests and Class-A and C1 Type Numerical Analyses (현장시험과 Class-A 및 C1 type 수치해석을 통한 강관매입말뚝의 거동에 대한 연구)

  • Kim, Sung-Hee;Jung, Gyoung-Ja;Jeong, Sang-Seom;Jeon, Young-Jin;Kim, Jeong-Sub;Lee, Cheol-Ju
    • Journal of the Korean GEO-environmental Society
    • /
    • v.18 no.7
    • /
    • pp.37-47
    • /
    • 2017
  • In this study, a series of full-scale field tests on prebored and precast steel pipe piles and the corresponding numerical analysis have been conducted in order to study the characteristics of pile load-settlement relations and shear stress transfer at the pile-soil interface. Dynamic pile load tests (EOID and restrike) have been performed on the piles and the estimated design pile loads from EOID and restrike tests were analysed. Class-A type numerical analyses conducted prior to the pile loading tests were 56~105%, 65~121% and 38~142% respectively of those obtained from static load tests. In addition, design loads estimated from the restrike tests indicate increases of 12~60% compared to those estimated in the EOID tests. The EOID tests show large end bearing capacity while the restrike tests demonstrate increased skin friction. When impact energy is insufficient during the restrike tests, the end bearing capacity may be underestimated. It has been found that total pile capacity would be reasonably estimated if skin friction from the restrike tests and end bearing capacity from the EOID are combined. The load-settlement relation measured from the static pile load tests and estimated from the numerical modelling is in general agreement until yielding occurs, after which results from the numerical analyses substantially deviated away from those obtained from the static load tests. The measured pile behaviour from the static load tests shows somewhat similar behaviour of perfectly-elastic plastic materials after yielding with a small increase in the pile load, while the numerical analyses demonstrates a gradual increase in the pile load associated with strain hardening approaching ultimate pile load. It has been discussed that the load-settlement relation mainly depends upon the stiffness of the ground, whilst the shear transfer mechanism depends on shear strength parameters.

Geophysical Studies on Major Faults in the Gyeonggi Massif : Gravity and Electrical Surveys In the Gongju Basin (경기육괴내 주요 단층대의 지구물리학적 연구: 공주분지의 중력 및 지전기 탐사)

  • Kwon Byung-Doo;Jung Gyung-Ja;Baag Chang-Eob
    • The Korean Journal of Petroleum Geology
    • /
    • v.2 no.2 s.3
    • /
    • pp.43-50
    • /
    • 1994
  • The geologic structure of Gongju Basin, which is a Cretaceous sedimentary basin located on the boundary of Gyeonggi Massif and Ogcheon Belt, is modeled by using gravity data and interpreted in relation with basin forming tectonism. The electrical survey with dipole-dipole array was also conducted to uncover the development of fractures in the two fault zones which form the boundaries of the basin. In the process of gravity data reduction, the terrain correction was performed by using the conic prism model, which showed better results specially for topography having a steep slope. The gravity model of the geologic structure of Gongju basin is obtained by forward modeling based on the surface geology and density inversion. It reveals that the width of the basin at its central part is about $4{\cal}km$ and about $2.5{\cal}km$ at the southern part. The depth of crystalline basement beneath sedimentary rocks of the basin is about $700{\~}400{\cal}m$ below the sea level and it is thinner in the center than in margin. The fault of the southeastern boundary appears more clearly than that of the northwestern boundary, and its fracture zone may extended to the depth of more than $1{\cal}km$. Therefore, it is thought that the tectonic movement along the fault in the southeastern boundary was much stronger. These results coincide with the appearance of broad low resistivity anomaly at the southeastern boundary of the basin in the resistivity section. The fracture zones having low density are also recognized inside the basin from the gravity model. The swelling feature of basement and the fractures in sedimentary rocks of the basin suggest that the compressional tectonic stress had also involved after the deposition of the Cretaceous sediments.

  • PDF

A Study on Decision of Cut Rock Slope Angle Applied Shear Strength of Continuum Rock Mass Induced from Hoek-Brown Failure Criterion (Hoek-Brown 파괴기준에서 유도된 연속체암반의 전단강도를 적용한 깎기 암반사면 경사 결정 연구)

  • Kim, Hyungmin;Lee, Byokkyu;Woo, Jaegyung;Hur, Ik;Lee, Junki;Lee, Sugon
    • Journal of the Korean GEO-environmental Society
    • /
    • v.20 no.5
    • /
    • pp.13-21
    • /
    • 2019
  • There are many cuts or natural rock slopes that remain stable for a long time in the natural environment with steep slopes ($65^{\circ}$ to $85^{\circ}$). In terms of design practice, the rock mass consisting of similar rock condition and geological structures is defined as a good continuum rock slope, and during the process of decision making angle of this rock slope, it will be important to establish the geotechnical properties estimating method of the continuum rock on the process of stability analysis in the early stages of design and construction. In this study, the stability analysis of a good continuum rock slope that can be designed as a steep slope proposed a practical method of estimating the shear strength by induced from the Hoek-Brown failure criterion, and in addition, the design applicability was evaluated through the stability analysis of steep rock slope. The existing method of estimating the shear strength was inadequate for practical use in the design, as the equivalent M-C shear strength corresponding to the H-B envelope changes sensitively, even with small variations in confining stress. To compensate for this problem, it was proposed to estimate equivalent M-C shear strength by iso-angle division method. To verify the design applicability of the iso-angle division method, the results of the safety factor and the displacement according to the change in angle of the cut slope constructed at the existing working design site were reviewed. The safety factor is FS=16~59 on the 1:0.5 slope, FS=12~52 on the 1:0.3 slope, most of which show a 10~12 percent reduction. Displacement is 0.126 to 0.975 mm on the 1:0.5 slope, 0.152 to 1.158 mm on the 1:0.3 slope, and represents an increase of 10 to 15%. This is a slightly change in normal proportion and is in good condition in terms of stability. In terms practical the working design, it was confirmed that applying the shear strength estimated by Iso-angle division method derived from the H-B failure criterion as a universal shear strength for a good continuum rock mass slope was also able to produce stable and economic results. The procedure for stability analysis using LEM (Limit Equilibrium Analysis Method) and FEM (Finite Element Analysis Method) will also be practical in the rock slope where is not distributed fault. The study was conducted by selecting the slope of study area as a good rock condition, establishing a verification for which it can be applied universal to a various rock conditions will be a research subject later on.

Coupled Hydro-Mechanical Modelling of Fault Reactivation Induced by Water Injection: DECOVALEX-2019 TASK B (Benchmark Model Test) (유체 주입에 의한 단층 재활성 해석기법 개발: 국제공동연구 DECOVALEX-2019 Task B(Benchmark Model Test))

  • Park, Jung-Wook;Kim, Taehyun;Park, Eui-Seob;Lee, Changsoo
    • Tunnel and Underground Space
    • /
    • v.28 no.6
    • /
    • pp.670-691
    • /
    • 2018
  • This study presents the research results of the BMT(Benchmark Model Test) simulations of the DECOVALEX-2019 project Task B. Task B named 'Fault slip modelling' is aiming at developing a numerical method to predict fault reactivation and the coupled hydro-mechanical behavior of fault. BMT scenario simulations of Task B were conducted to improve each numerical model of participating group by demonstrating the feasibility of reproducing the fault behavior induced by water injection. The BMT simulations consist of seven different conditions depending on injection pressure, fault properties and the hydro-mechanical coupling relations. TOUGH-FLAC simulator was used to reproduce the coupled hydro-mechanical process of fault slip. A coupling module to update the changes in hydrological properties and geometric features of the numerical mesh in the present study. We made modifications to the numerical model developed in Task B Step 1 to consider the changes in compressibility, Permeability and geometric features with hydraulic aperture of fault due to mechanical deformation. The effects of the storativity and transmissivity of the fault on the hydro-mechanical behavior such as the pressure distribution, injection rate, displacement and stress of the fault were examined, and the results of the previous step 1 simulation were updated using the modified numerical model. The simulation results indicate that the developed model can provide a reasonable prediction of the hydro-mechanical behavior related to fault reactivation. The numerical model will be enhanced by continuing interaction and collaboration with other research teams of DECOVALEX-2019 Task B and validated using the field experiment data in a further study.

Granite Dike Swarm and U-Pb Ages in the Ueumdo, Hwaseong City, Korea (경기도 화성시 우음도 일원의 화강암 암맥군과 U-Pb 연령)

  • Chae, Yong-Un;Kang, Hee-Cheol;Kim, Jong-Sun;Park, Jeong-Woong;Ha, Sujin;Lim, Hyoun Soo;Shin, Seungwon;Kim, Hyeong Soo
    • Journal of the Korean earth science society
    • /
    • v.43 no.5
    • /
    • pp.618-638
    • /
    • 2022
  • The Middle Jurassic granite dike swarm intruding into the Paleoproterozoic banded gneiss is pervasively observed in Ueumdo, Hwaseong City, mid-western Gyeonggi Massif. Based on their cross-cutting relationships in a representative outcrop, there are four dikes (UE-A, UE-C, UE-D, UE-E), and depending on the direction, there are three granite dike groups, which are NW- (UE-A dike), NW to WNW- (UE-C dike), and NE-trending (UE-D and UE-E dikes). These granite dikes are massive, medium-to coarse-grained biotite granites, and their relative ages observed in outcrops are in the order of UE-A, UE-D (=UE-E), and UE-C. The geometric analysis of the dikes indicates that the UE-A and UE-C dikes intrude under approximately NE-SW trending horizontal minimum stress fields. The UE-A dike, which showed a relatively low average SiO2 content by major element analysis, is a product of early magma differentiation compared to other dikes; therefore, it is consistent with the relative age of each dike. The 206Pb/238U weighted mean ages for each dike obtained from SHRIMP zircon U-Pb dating were calculated to be 167 Ma (UE-A), 164 Ma (UE-C), 167 Ma (UE-D), and 167 Ma (UE-E), respectively. The samples of the UE-A, UE-D, and UE-E dikes showed very similar ages. The UE-C dike shows the youngest age, which is consistent with the results of the relative age in the outcrops and major element analysis. Therefore, the granite dikes intruded into the Middle Jurassic (approximately 167 and 164 Ma), coinciding with those of the Gyeonggi Massif, where the Middle Jurassic plutons are geographically widely distributed. This result indicates that the wide occurrence of the Middle Jurassic plutons on the Gyeonggi Massif was formed as a result of igneous activity moving in the northwest direction with the shallower subduction angle of the subducting oceanic plate during the Jurassic.

The Interrelationship between Riparian Vegetation and Hydraulic Characteristics during the 2020 Summer Extreme Flood in the Seomjin-gang River, South Korea (2020 여름 섬진강 대홍수시 하안식생과 수리 특성의 상호관계)

  • Lee, Cheolho;Lee, Keonhak;Kim, Hwirae;Baek, Donghae;Kim, Won;Kim, Daehyun;Lee, Hyunjae;Woo, Hyoseop;Cho, Kang-Hyun
    • Ecology and Resilient Infrastructure
    • /
    • v.8 no.2
    • /
    • pp.79-87
    • /
    • 2021
  • Because active interactions occur among vegetation, hydrology, and geomorphology in riparian systems, any changes in one of these factors can significantly affect the other two. In this study, we evaluated these interactions at four sites (two in Gajeong and two in Hahan) along the Seomjin-gang River that was substantially devastated by an extreme flood in 2020. We examined the relationship between the riparian vegetation and the hydraulic characteristics of the flood using remote sensing, hydraulic modeling, and field surveys combined. The evaluation results showed that the floods caused a record-breaking rise of up to 43.1 m above sea level at the Yeseong-bridge stage gauge station (zero elevation 27.4 m) located between the Gajeong and Hahan sites, with the shear stress being four times higher in Hahan than in Gajeong. Additionally, the water level during the flood was estimated to be a maximum of 1 m higher depending on the location in the presence of riparian plants. Furthermore, both sites underwent extensive biological damage due to the flood, with 78-80% loss in vegetation, with preferential damage observed in large willow species, compared to Quercus acutissima. The above findings imply that all plant species exhibit different vulnerabilities towards extreme floods and do not induce similar behavior towards events causing a disturbance. In conclusion, we developed strategies for effectively managing riparian trees by minimizing flood hazards that could inevitably cause damage.