• Title/Summary/Keyword: 육상 건조 공법

Search Result 2, Processing Time 0.015 seconds

Design of quay mooring rope of Floating Dock against Typoon (태풍 시 플로팅도크 안벽 계류 로프 설계)

  • Kim, Ho-Kyeong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.9
    • /
    • pp.569-574
    • /
    • 2020
  • A floating dock is the main facility for launching ships. In the early 2000s, ship-launching technology using floating docks was developed in Korea. Therefore, the opportunity to participate in new construction projects without investment in dry docks has expanded. In this paper, a basic calculation for the safe mooring of a floating dock was performed, and a mooring system was designed based on this. This study was conducted considering the typhoon situation, which is the most serious environmental requirements of Daebul Pier, a site to be installed and operated, for a floating dock. The design load was calculated by wind load, tidal load, and wave-induced load in accordance with the internationally accepted standards. After performing the initial arrangement of the mooring line of the floating dock using the existing mooring facilities of Daebul Pier, the minimum breaking load for each mooring line was calculated for the given load. Based on the calculation, the mooring arrangement was modified to minimize the breaking load, and a final specification of each mooring line was selected.

해양 설비 시장에 관하여

  • Cho, Kab-Rae
    • Proceedings of the Korea Committee for Ocean Resources and Engineering Conference
    • /
    • 2003.10a
    • /
    • pp.5-11
    • /
    • 2003
  • This paper present a review of trends in world energy demand and a close outlook over the offshore market, especially in deepwater developments. The market requirements, characteristics and risks involved in the contract type of offshore projects are explained, followed by the strategic approaches of Korean main yards along with, the HHI's development and introduction of innovative construction methodologies to be a competitive contractor.

  • PDF