• 제목/요약/키워드: 유닛 모듈러

검색결과 51건 처리시간 0.021초

주거시설로서 모듈러건축 활용화 방안 (The Practical Application of Modular Construction for Residential Facilities)

  • 김지현;박일민
    • 한국주거학회논문집
    • /
    • 제24권3호
    • /
    • pp.19-26
    • /
    • 2013
  • The purpose of this research is to provide basic data for the promotion strategy to activate modular construction system as residential facilities, through a study on the architectural planning, institutions and policies and research on connection details, for the use as residential facilities of the modular construction that is not actively supplied for the general residential facilities. As a result, I suggest sample model plan of domestic and foreign case analysis and characteristic of modular construction and practical application of modular construction for Residential Facilities. Owing to many advantages including short construction period structural stability and economic benefits, modular construction is expected to play a role as residential alternative of socially controversial affordable housing and weekend homes, and potential housing shortage after reunification; and to contribute to the development of design automation and industrialized constructions. Though Korea is still lacking development of the system that meets the domestic context, if supported by ongoing researches on the development of construction methods, materials and details, the settlement of appropriate modular residential facilities to suit the national situation will serve a possible alternative solution for many housing and environmental problems.

모듈러 건축물의 거주환경 성능기준 설정에 관한 연구;음환경 성능을 중심으로 (A Study on the Establishment of Housing Performance Criteria for Modular Building)

  • 고광일;김용인;이찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.628-631
    • /
    • 2006
  • 모듈러 건축공법은 공장 생산된 박스형의 모듈러 유닛을 현장으로 운반, 조립하여 건축물을 완성하는 건축공법으로, 공기단축, 이동 및 재사용, 환경친화성과 같은 이점을 가지고 있어 점차 그 수요가 증가할 것으로 예상된다. 모듈러 건축공법을 도입${\cdot}$적용하기 위해서는 합리적이고 객관적인 성능기준의 정립이 필요하다. 본 논문은 모듈러 건축물의 성능기준 중 음환경 성능에 대한 성능기준을 설정하는데 목적이 있다. 이를 위해 관련 제도 및 법적 기준을 검토하고 시험 시공된 건축물을 대상으로 성능평가와 설문조사를 실시 분석하였다. 이 성능기준은 발주자가 설계지침서 등을 통하여 요구수준을 명확하게 제시할 수 있고, 설계자${\cdot}$시공자로 하여금 목표성능을 확보하도록 유도하여 모듈러 건축물의 성능 수준을 향상시킬 수 있을 것이다.

  • PDF

모듈러 공공주택의 하자분석을 통한 품질 개선 방안 (Quality Improvement Measures of Modular Public Rental Apartment Houses through Defects Analysis)

  • 이순구;김규용;남정수
    • 한국건축시공학회지
    • /
    • 제24권4호
    • /
    • pp.425-436
    • /
    • 2024
  • 국내 공공주택으로 활용되고 있는 모듈러 공동주택은 도입 초기 단계에 있다. 그 발생된 입주단계 하자와 입주 후 유지보수 단계의 하자를 구분하여 분석한 결과 입주단계에서 높은 비율을 차지하는 도배 및 바닥재 공사는 보양 등의 품질관리가 요구된다. 유지보수단계에서는 많이 발생하는 누수하자에 대해서 지붕공사의 노출방수공법 보완과 저층부 콘크리트 골조와 모듈러 연결부위, 그리고 모듈러 발코니 부위의 철저한 설계 및 시공관리가 필요하다. 또한 골조 및 유닛모듈 시공업체를 1개 업체로 발주하여 전체 시공 관리를 일원화하는 것이 요구된다. 이로써 모듈러 공공주택의 품질을 향상시킬 수 있을 것으로 판단되며 모듈러 공법의 활성화에도 기여할 수 있을 것으로 기대된다.

활동기준원가계산법(Actvitiy-Based Costing)에 의한 모듈러 건축물 공장제작단계 간접비 산정 방안 (Application of Activity-Based Costing(ABC) for Modular Building Construction Indirect Costs Calculation at the Manufacturing Stage)

  • 이정훈;박문서;이현수;이광표;현호상
    • 한국건설관리학회논문집
    • /
    • 제16권4호
    • /
    • pp.139-145
    • /
    • 2015
  • 최근 건설 기업들은 노동력 부족, 원자재값 상승, 건설경기 위축 등으로 인해 새로운 건설시장 개척 및 자동화 기술도입을 적극적으로 추진하고 있다. 이러한 노력의 일환으로 최근 제조업의 생산프로세스와 건설생산프로세스가 결합된 모듈러 건축공법이 부각되고 있으며 이와 관련된 연구가 활발히 진행되고 있다. 모듈러 건축프로세스에서 공장제작의 가장 큰 장점 중 하나는 기존 건축프로세스에서 사용하기 어려웠던 제조업의 생산설비시스템을 활용한 생산원가(공사원감)절감이 가능하다는 것 있다. 이를 뒷받침하기 위해서는 대다수의 건축공종이 집중되어있는 공장제작단계에서의 원가산정이 정확해야 하며 특히 직접적인 계산이 어려운 간접비에 대한 구체적인 산정방인 필요하다. 그러나 국내 모듈러 건축산업이 시장도입단계로 이와 관련된 연구가 한정적으로 이루어지고 있어 모듈러 건축물의 원가왜곡현상이 나타날 수 있는 문제가 있다. 따라서 본 연구는 모듈러 건축물의 공장제작단계에서 국내계약법상에서 명시된 제조업과 건설업에서의 간접비 정의를 고찰하고 활동기준원가계산법을 통해 모듈러 건축물을 구성하는 모듈러 유닛별 간접비 산정방식을 제시하였다. 본 연구는 공장제작단계에서의 전 과정 뿐만 아니라 모듈러 건축물의 설계, 제작, 운송, 시공의 간접비 배분에 대한 기초자료로서 활용될 수 있으며 향후 모듈러 건축물의 공장제작단계에서의 원가산정 정확도 향상 및 모듈러 건축물의 전 생애주기에 따른 원가산정방안 마련에 기여할 것으로 기대된다.

모듈러 건축물의 특성을 반영한 공공발주 방식의 개발 (Development of Project Delivery System in Public Sector for Modular Building)

  • 남성훈;김경래
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.49-56
    • /
    • 2016
  • 최근 모듈러 건축물 관련 연구가 활발하게 진행되고 있으나, 실제 건설산업에서 모듈러 건축물을 활용한 건축공사의 발주는 아직 활성화되지 못하고 있다. 이에 대한 여러 가지 원인들이 분석되고 있으나 그 중 중요한 것은 모듈러 건축물은 기존 현장중심의 건설생산체계를 공장제작-운송-현장설치 새로운 체계로의 전환을 요구하고 있다는 것이다. 하지만 국내 공공공사의 기존 발주방식은 전기통신공사업 등 개별법에서 분리발주를 의무화하고 있기 때문에 모듈러 건축물 장점을 살릴 수 있는 새로운 건설생산체계를 수용하기 어렵다. 따라서 기존 발주방식은 모듈러 건축물을 현장중심의 공사로 분리발주(건축 토목, 전기, 통신, 소방 등) 계약할 수밖에 없고, 건축 토목공사의 계약 범위 안에서 모듈러 유닛을 물품으로 구매할 수밖에 없기 때문에 이러한 분리발주로 인한 모듈러 건축물의 공장제작 비율을 저하시키고 공사비 상승, 품질저하 등의 문제를 발생시켜서 모듈러 건축물의 장점을 발휘하지 못하도록 하는 장애요인이 된다. 본 논문에서는 모듈러 건축물에서 요구하는 새로운 건설생산체계를 적극적으로 수용할 수 있는 새로운 발주방식을 개발하여 제안하고자 한다.

한국형 모듈러 주택 시공의 시나리오 개발 (Development of a Korean Modular Housing Construction Scenario)

  • 김균태;김창한;이두헌;이영호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

대규모 모듈러 건축 프로젝트 현장 시공 시 공장 생산량 및 현장 시공량 관리 모델 (Quantity Management Model for Manufacturing and Assembly of Large-scale Modular Construction Projects during Construction Phase)

  • 최원규;이현수;박문서;현호상
    • 한국건설관리학회논문집
    • /
    • 제19권1호
    • /
    • pp.43-53
    • /
    • 2018
  • 모듈러 건축은 공장 생산 과정을 토해서 품질과 정확도를 향상 시킬 수 있고 같은 유닛을 반복적으로 만들어내기 때문에 대규모 생산과 비용 절감이 가능하다. 특히, 현장 작업과 공장 생산을 동시에 진행 할 수 있기 때문에 공기 단축이 가능하다. 그러나 실제 모듈러 건축 프로젝트 조사 보고서에 따르면 모듈러 건축과 기존 건축의 평균 공사 기간에서는 큰 차이를 보이고 있지 못하다. 이는 모듈러 건축 프로젝트의 실제 시공 시 발생하는 공기 지연 문제 때문이다. 따라서 실제 시공 시 공기 지연 방지를 위한 대안 선택이 필요하며, 특히 대규모 모듈러 건축 프로젝트 현장 시공의 경우 현장에서의 모듈 양중 및 조립 과정이 공장 생산과 동시에 진행되기 때문에 대안 파악이 공장과 현장을 동시에 고려하여 수행되어야 한다. 본 연구에서는 규모에 따른 모듈러 건축의 실제 시공 시 프로세스의 차이를 토대로 IDEF0 모델링을 통하여 대규모 모듈러 건축의 관리 요소를 파악하였고 이를 이용하여 공기 지연을 판단할 수 있는 공장 생산량과 현장 시공량 관리 모델을 개발하였다. 이를 이용하여 대규모 모듈러 건축 실제 시공 시 발생하는 공기 지연 문제를 감소시킬 수 있을 것이다.

유닛모듈 운송 방법의 개선방향 연구 (Study of Improved Transporting Methods on Unit Module)

  • 박수열;김균태;박남천;정인수
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.243-244
    • /
    • 2012
  • Recently, research has been actively conducted for getting interested in unit module housing. However, the domestic unit modular housing research in the early stages yet, so the major process for research is lacking. Explore all these reasons fit with domestic unit housing development this paper, focusing on the process of shipping cargo by truck, transport unit module was studied. The purpose of this paper is to present new ideas and derive the direction of the development of the equipment safely and effectively fixed to the unit module of the transport unit module that will be helpful in the development of the equipment required for the transport process of the next unit module.

  • PDF

유닛모듈 운반을 위한 고정장치의 시뮬레이션 분석 (Simulation analysis of Transporting Fixation Equipment on Unit Module)

  • 박수열;김균태;박남천;채명진
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 추계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2013
  • Unit module system produce units in the factory and assemble in the field. This unit module system has advantages of shortening the process of construction. However, it is still in the early research related to setting the unit module which is transported by truck to the field. Therefore, when transporting the unit module, this goal of study develops fixed devices. And suggesting device were performed that simulations analyzed maximum stress and assessed the safety.

  • PDF

모듈러 유닛 골조용 비대칭 합성기둥의 설계강도 (Design Strength of Non-symmetric Composite Column for Modular Unit Frames)

  • 박금성;이상섭;문지호
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제22권5호
    • /
    • pp.101-109
    • /
    • 2018
  • 모듈형 구조시스템은 학교 및 아파트 건물과 같은 저층 및 중층 구조물에 점점 더 많이 사용되고 있다. 최근에는 고층 건물에 모듈러 구조시스템을 적용하는 방법에 대한 연구가 수행되고 있다. 고층 모듈러 구조시스템에 대해 충분한 저항력과 경제적인 구조를 제공하기 위해 복합모듈 구조시스템이 제안되었다. 본 연구에서는 일련의 실험을 통해 단위 복합모듈 구조에 적용하기 위한 목적으로 비대칭 복합 기둥의 강도를 평가하고자 하였다. 실험적 연구는 기둥의 세장비, 편심율 및 관통바 유무에 따라 기둥의 강도에 미치는 영향에 중점을 두었다. 단위 모듈구조에 대한 비대칭 기둥단면의 설계식을 제안하였다. 결과로부터, 설계식은 단위 복합모듈 구조에서 비대칭 기둥단면의 적절한 강도 예측을 제공한다는 것을 알 수 있다.