• Title/Summary/Keyword: 위험비용

Search Result 1,003, Processing Time 0.029 seconds

A Study on Cost Prediction of Highway Operating Risk through a Case Study of Power Failure (정전사고 사례분석을 통한 고속도로 운영 위험비용 산정에 대한 연구)

  • Kwon, Yong-Hoon;Kim, Kyong-Ju;Lim, Won-Seok;Park, Chan-Jin;Chae, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.78-90
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

Study on the Development of Social Evaluation Model for Aids to Navigation Accident (항로표지사고의 사회적비용 평가모델 개발에 관한 연구(I))

  • Moon, Beom-Sik;Gug, Seung-Gi;Lee, Young-Tae
    • Journal of Navigation and Port Research
    • /
    • v.42 no.3
    • /
    • pp.187-194
    • /
    • 2018
  • Aids to Navigation (AtoN) is a marine traffic safety facility used to facilitate the safe and efficient movement of shipping and enhance the protection of the marine environment by the regulations or guidelines of The International Association of Marine Aids to Navigation and Lighthouse Authorities (IALA). Our country is managing AtoN to provide consistent services for AtoN users, although an average of 141 AtoN accidents occur annually. An AtoN accident forces non-planned work on the managers to resort the function, and causes psychological anxiety for its users, ultimately resulting in economic losses. This study developed the Social Cost evaluation model of AtoN accidents. The model can be used to quantify the manager's economic activities related to the shutdown and recovery, as well as the cost associated with the inconvenience to AtoN users. The Social Cost evaluation model of AtoN accidents is proposed as the sum of the encounter cost, administration cost and risk cost.

위험물저장소의 화재방호 비용효과 분석

  • Yun, Jong-Cheol
    • 방재와보험
    • /
    • s.106
    • /
    • pp.27-32
    • /
    • 2005
  • 이 글은 The Hazardous Installation Directorate의 최우수 조사관인 Alan Tyldestey와 Atkins에서 화재안전 컨설턴트로 근무하고 있는 Peter Rew와 Richard Houlding가 위험물저장소의 화재방호 비용효과분석에 관해 발표한 연구보고서를 번역한 것이다.

  • PDF

The Effects of Bank Mergers in Korea (국내 은행간 합병의 효과분석)

  • Kim, Dae-Ho
    • The Korean Journal of Financial Management
    • /
    • v.17 no.1
    • /
    • pp.283-306
    • /
    • 2000
  • 최근 국내에서는 은행산업의 구조조정과 부실은행의 정리과정에서 은행합병이 실시되었다. 1998년 6월 5개 은행이 퇴출되었고 이들 은행의 우량자산과 부채는 계약이전 방식에 의하여 우량은행들에게 인수되었다. 이어 1999년 1월부터 상업은행과 한일은행이 한빛은행으로, 하나은행과 보람은행이 하나은행으로 그리고 국민은행과 한국장기신용은행이 국민은행으로 합병되었다. 1999년 9월에는 조흥은행, 강원은행 및 충북은행이 합병을 실시하였다. 본 연구에서는 최근 실시된 국내 은행간 합병의 효과를 살펴보기 위하여 합병시점을 전후하여 위험성과 수익성 및 비용효율성을 비교 분석하였다. 합병은행과 자산부채이전(P&A) 방식의 인수은행으로 표본은행을 구분하고 합병효과를 분석하였는데 합병은행의 경우 합병후 수익성이 대체로 증가하나 위험도 증가하는 것으로 나타났다. 자산부채이전방식의 경우 합병후 위험이 증가하였으며 수익성은 대체로 악화되는 것으로 나타났다. 비용효율성 분석에 있어서 합병은행의 경우 합병전 기간에 비용감소를 보였으나 합병후에는 뚜렷한 비용감소가 없었는데 자산 부채이전 방식의 인수은행은 합병후 비용감소를 보였다.

  • PDF

Economic Assessment of Coal-fired & Nuclear Power Generation in the Year 2000 -Equal Health Hazard Risk Basis- (2000년대 원자력과 유연탄 화력 발전의 경제성 평가 -동일 보건 위험도 기준-)

  • Seong, Ki-Bong;Lee, Byong-Whi
    • Nuclear Engineering and Technology
    • /
    • v.21 no.3
    • /
    • pp.171-185
    • /
    • 1989
  • On the basis of equal health hazard risk, economic assessment of nuclear was compared with that of coal for the expansion planning of electric power generation in the year 2000. In comparing health risks, the risk of coal was roughly ten times higher than that of nuclear according to various previous risk assessments of energy system. The zero risk condition can never be achievable. Therefore, only excess relative health risk of coal over nuclear was considered as social cost. The social cost of health risk was estimated by calculation of mortality and morbidity costs. Mortality cost was $250,000 and morbidity cost was $90,000 in the year 2000.(1986US$) Through Cost/Benefit Analysis, the optimal emission standards of coal-fired power generation were predicted. These were obtained at the point of least social cost for power generation. In the year 2000, the optimal emission standard of SOx was analyzed as 165ppm for coal-fired power plants in Korea. From this assessment, economic comparison of nuclear and coal in the year 2000 showed that nuclear would be more economical than coal, whereas uncertainty of future power generation cost of nuclear would be larger than that of coal.

  • PDF

A method of SW development cost estimation for SBA's cost-effectiveness analysis (SBA 효과도 분석을 위한 소프트웨어 개발 비용 산정기법 연구)

  • Choi, Dal-Nim;Kim, Hyung-Jong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.04a
    • /
    • pp.337-339
    • /
    • 2011
  • M&S 기반의 가상환경 설계운영은 자원절약 및 위험성 감소 등 다양한 측면에서 효율성을 지니고 있다. 국방은 현실세계에서 실시하기 어려운 군사작전 시뮬레이션 운영을 위해 국방 M&S 개념을 도입하고, 이를 기반으로 무기체계의 소요도출부터 전력화 단계까지 프로세스 전반에 걸쳐 가상 환경에서의 설계 운영 및 검증을 수행하는 SBA 를 도입하였다. 그러나 모델링 및 시뮬레이션 과정에서 발생되는 고비용, 위험성 등의 문제점은 SBA 도입 효율성에 대한 논란의 요인이 된다. 따라서 SBA 도입 효과를 입증할 수 있는 지표 제시가 요구되며, 이 연구에서는 입증 지표로서 비용, 시간, 품질 및 위험도의 4 가지 요소를 분석한다. 또한 소프트웨어 개발비용 산정의 어려움 및 SBA의 고비용 가능성을 이유로 SBA 에 대한 개발비용 산정의 필요성을 제기한다. SBA 개발비용 산정을 위해 기존에 제시된 소프트웨어 개발비용 산정 모델 적용을 제안하고, COCOMO 모델, Putnam 모델, FP모델, 전문가의 감정 및 델파이 기법 등 소프트웨어 개발비용 산정모델을 기반으로 SBA 개발비용 산정에 적합한 모델을 분석한다.

효과적인 정보시스템 아웃소싱을 위한 개념적 모형에 관한 연구

  • 사공혜숙
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2000.11a
    • /
    • pp.17.2-25
    • /
    • 2000
  • 국내에서 아웃소싱은 선진국들과 다르게 비용절감을 목적으로 도입되고 있는 것으로 알려져 있다. 아웃소싱을 하는 기업들 중에는 서비스 인력을 충분히 내부화 할 수 있음에도 불구하고 단순히 관리상의 편의를 위해 아웃소싱을 하는 기업들도 적지 않다. 그리고 실제 기업에서 아웃소싱을 할 경우 기대치에 미치지 못하는 위험성이 대두되고 있다. 이에 본 연구의 목적은 선행연구에서 여러 학자들의 견해를 정리해서 아웃소싱의 성공에 영향을 미칠 수 있는 요인인 기술적 위험과 통제적 위험, 비용적 위험과 업무 유연성, 신뢰성, 시스템 확장성, 우수한 정보기술, 전문화된 인력으로 분류하여 연구모형과 가설을 설정하고 향후 실증연구 분석을 위한 토대를 마련하고자 한다.

  • PDF

Human Papillomavirus Risk Classification by Cost-Sensitive Learning (비용 의존 학습에 의한 인유두종 바이러스의 분류)

  • 황소현;박성배;장병탁
    • Proceedings of the Korean Information Science Society Conference
    • /
    • 2003.04c
    • /
    • pp.401-403
    • /
    • 2003
  • 인유두종 바이러스는 표피세포에 감염되는 DNA 바이러스로 자궁경부암을 일으키는 가장 큰 요인이다. 현재까지 100 여개의 종류가 알려져 있고 악성종양 유발 가능성에 따라 위험군을 나누는데. 여기서 중요한 것은 고위험군을 저위험군으로 잘못 분류하는 것을 최소화하는 것이다. 본 논문에서는 분류를 위한 데이터로 인유두종 바이러스에 관한 문서 자료들을, 기계 학습 방법으로 분류 비용을 고려해 줄 수 있는 비용 의존 학습을 이용하였다. 실험결과. 비용을 고려해 주는 것이 고려하지 않았을 때보다 더 종은 성능을 나타내었다.

  • PDF

Risk Management for Casuality Accident at Urban Railway Stations (도시철도 역사 내 철도안전사상사고 위험도 관리 방안)

  • Kim, Jin Tae;Kim, Si Gon;Kim, Yeon Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.529-534
    • /
    • 2016
  • The paper suggests risk management methodology for alleviating casuality accidents at urban railway stations. Risk management deals with countermeasures for reducing accident probability or consequences to reach at the certain level of risk. First of all, Economic evaluations using cost and benefit for all the alternatives are performed. The alternatives exceeding B/C ratio greater than 1, each alternative is applied in the order of higher B/C ratio. this process is repeated when the level of risk is reduced as low as reasonably practical (ALARP). In order to determine the level of ALARP, Level of Service (LOS) for casuality risk at urban railway stations is proposed. The ALARP level is set to the LOS "C". Finally, a case study is applied to the Jongno 3-ga station, which is a highest risky station among all the stations operated by Seoul Metro and Seoul Metropolitan Rapid Transit Cooperation (SMRT).

The Study of the Integrated Cost Audit Model for the Efficiency of IT project risk management (통합비용감리모델을 통한 IT사업위험관리 효율성에 관한 연구)

  • Yoon, Seong-Jeong;Han, Gi-Jun;Kim, Dong-Su
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2009.05a
    • /
    • pp.266-269
    • /
    • 2009
  • 현재 대한민국 사업(IT Project)수행 시 다양한 관리 방법론이 연구 활용 되고 있다. 그러나 다양한 사업(IT Project)관리 방법론을 적용한다 하더라도 효과 효율성 측면에 대한 실증분석이 필요하다. 왜냐하면 그러한 방법론으로 비용적 측면에서 효과 효율 성을 발휘할 것인지 측정이 없었기 때문이다. 본 논문에서 시뮬레이션 하는 비용측정은 사업초기에 책정한 비용과, 분석/설계가 끝나는 시점의 비용, 사업 종료 후 비용을 측정할 것이다. 이때, 사업관리의 위험관리요소와 통합비용감리모델을 제시하여 감리점검항목을 도출할 것이다. 이를 통하여 효과 효율 성을 도출할 것인지 검증할 것이다. 효과 성 및 효율 성이 본 논문에서 제시한 통합비용감리모델을 통하여 비용에 대한 누수 및 과다산출이 도래를 막을 수 있는지 논하고자 한다.

  • PDF