• Title/Summary/Keyword: 위험변경

Search Result 301, Processing Time 0.021 seconds

Management of Change in the Chemical Industries Based on Risk Assessment (위험성 평가에 기반한 화학산업의 변경관리)

  • Yoo, Jin Hwan;Lee, Heon Seok;Choi, Jeong Woo;Seo, Jae Min;Ko, Jae Wook
    • Korean Chemical Engineering Research
    • /
    • v.46 no.1
    • /
    • pp.156-163
    • /
    • 2008
  • Process change and modification, which are caused by process failure, equipment life cycle and economic environment, have been generated in the chemical plants. And the MOC (management of change) base on the reasonable process safety technology such as change judgment, hazard identification by accurate technical references and risk assessment. But it is difficult to carry out the MOC because of lack of experience, shortage of knowledge and none of process safety specialists. In this study, the MOC system which could make enhancement of safety by finding and complementing weakness of MOC in chemical facilities was developed. This developed MOC system based on QRA was recommended the obvious standard for decision-making process, MOC procedure based on risk assessment and risk estimation of the process modification. The study based on the above way sought the enhancement of safety by performing Risk Based MOC for chemical plants.

The Effect of Type of Largest Shareholder Change on Losses: Focusing on Firm Risk (최대주주 변경의 유형이 적자보고에 미치는 영향: 기업위험을 중심으로)

  • Kim, Hye-Ri
    • Journal of Digital Convergence
    • /
    • v.18 no.6
    • /
    • pp.237-244
    • /
    • 2020
  • The purpose of this study is to empirically analyze the effect of information related to the largest shareholder's change on the likelihood of reporting a loss for firms listed on the Korea Exchange. Specifically, this study conducts a logit regression analysis to examine the firm's loss reporting with frequent changes in the largest shareholder among the largest shareholder change types. So, it controls the impact of a firm's loss reporting, such as the previous year's loss reporting and discretionary accruals. As a result of the analysis, firms whose largest shareholder have changed more than 2 times in the accounting period are found to have higher firm risk in loss reporting than other firms. The results of this analysis confirm that frequent changes in the largest shareholder, which are disclosures of investment risks on the Korea Exchange, may result in investment risk situations such as loss reporting.

The Impact of Corporate's Name Change on Cost of Capital (상호변경이 내재자본비용에 미치는 영향)

  • Yu, Soon-Mi
    • Management & Information Systems Review
    • /
    • v.33 no.4
    • /
    • pp.21-38
    • /
    • 2014
  • This study investigates whether and how a firm's cost of equity is influenced by the extent of a firms's name change. Even though corporate name change doesn't give any benefit to investors, it can be a signaling about firm's future valuation. And also, if that signaling has high credibility, it can be decrease information cost and the firm's cost of equity. on the contrary to this, if corporate name change is kind of break with the past and corporate image laundering, it is bad signaling to investors. So it can be increase information risk and the firm's cost of equity. Using yearly cross-sectional regressions of the cost of equity on our proxies for corporate name change, size, beta, market-to-book ratio and other innate risk factor over the 2005-2010, we find that the cost of capital is positively associated with corporate name change after controlling for all other factors. This result implies that corporate name change increase information risk of the business, and thus increase information asymmetries between managers and outside investors with respect to a firm's true future value. This increases information risk, and creates an adverse selection problem, on the part of outside investors. Rational investors therefore demand a premium for bearing this corporate name change-related information risk, which in turn leads us to observe a positive relation between the intensity of corporate name change and the cost of equity.

  • PDF

A Vehicle Detection Algorithm for a Lane Change (차선 변경을 위한 차량 탐색 알고리즘)

  • Ji, Eui-Kyung;Han, Min-Hong
    • Journal of the Institute of Convergence Signal Processing
    • /
    • v.8 no.2
    • /
    • pp.98-105
    • /
    • 2007
  • In this paper, we propose the method and system which determines the condition for safe and unsafe lane changing. To determine the condition, first, the system sets up the Region of Interest(ROI) on the neighboring lane. Second, a dangerous vehicle is extracted during the line changing. Third, the condition is determined to wm or not by calculating the moving direction, relative distance md relative velocity. To set up the ROI, the only one side lane is detected and the interested region is expanded. Using the coordinate transformation method, the accuracy of the ROI raised. To correctly extract the vehicle on the neighboring lane, the Adaptive Background Update method and Image Segmentation method which uses the feature of the travelling road are used. The object which is extracted by the dangerous vehicle is calculated the relative distance, the relative velocity and the moving average. And then in order to ring, the direction of the vehicle and the condition for safe and unsafe is determined. As minimizes the interested region and uses the feature of the travelling road, the computational quantity is reduced and the accuracy is raised and a stable result on a travelling road images which demands a high speed calculation is showed.

  • PDF

변경관리 (Management of Change) 전산시스템 개발에 관한 연구

  • 황호근;백종배;서영민;김윤화;이재열;고재욱
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.179-184
    • /
    • 2003
  • 화학공장의 경우 각종 장치 및 설비가 상호간의 상관관계를 가지고 운영되기 때문에 공정의 변경은 해당 설비 및 공정전반에 걸쳐 안전성의 심각한 문제를 가져올 수 있다. 이러한 설비의 변경 사항이 발생한 경우 변경으로 인하여 주변 설비와 공정전반에 대한 안전성 및 생산성 향상을 정확하게 판단할 수 있는 변경관리 시스템은 매우 중요하다. 화학공장의 특성상 안전성이 검토되지 않은 공정의 변경은 중대산업사고를 유발할 수 있는 매우 위험한 행위라고 할 수 있으며, 영국의 Flixborough에서 발생한 사이클로 헥산(Cyclohexane) 폭발사고는 대표적인 변경관리 오류에 의한 사고라 할 수 있다.(중략)

  • PDF

제조업종의 위험성 평가적용실태 및 대책방안에 관한 연구

  • 김두환
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 1998.05a
    • /
    • pp.285-291
    • /
    • 1998
  • 산업안전보건법 제48조에 의거 사업장의 유해위험시설을 보유하기 위해 신설, 증설, 변경 또는 이전시에 유해위험물질의 누출, 화재, 폭발 등으로 인하여 사업장내 근로자나 인근 주민들에게 피해를 줄 수 있는 사고를 사전에 예방하기 위하여 유해위험방지계획서나 공정안전보고서를 작성하여 노동부장관에게 제출토록 의무화가 되어있다. 각 사업장은 이러한 사전예방에 활용하기 위한 위험성 평가방법을 어떤 기법으로 어떻게 도입하여 적용시키고 있으며, 또 할 예정인가 사내에는 어떤 제도화가 되어 있는가 대책은 어떻게 반영되고 실시에 어떤 문제점이 있는가 등의 사실을 업종별로 파악하여 제조업종의 위험성 평가도입에 따른 문제점과 대책을 제시할 필요가 있다. (중략)

  • PDF

Key Change in the Mix System (믹스 시스템에서의 키 변경)

  • Yi Ju-Hyeong;Hong Man-Pyo
    • Proceedings of the Korea Institutes of Information Security and Cryptology Conference
    • /
    • 2006.06a
    • /
    • pp.377-381
    • /
    • 2006
  • 익명통신을 위한 믹스 시스템에서 공격의 위험에 대응하기 위하여 효과적인 키 관리가 중요하다. 공개키 암호 시스템을 사용할 경우, 믹스 노드의 비밀 키가 노출된 것으로 의심됐을 때, 또는 노출의 예방을 위해서 주기적으로 키를 변경할 필요가 있다. 믹스 시스템의 특성상 메시지의 송수신 사이에는 전송딜레이 이상의 딜레이 시간을 갖게 되고, 키 변경 이후에 일정 시간 동안에는 예전의 키를 적용한 메시지와 새로운 키를 적용한 메시지가 동시에 나타날 수 있다. 이러한 키 교차 시간을 충분히 가질 경우 공격에 노출될 위험이 커지고, 반대로 짧은 교차 시간을 갖는 것은 정상적인 메시지의 드랍을 증가시킨다. 믹스 시스템의 환경을 고려하여, 메시지의 평균적인 딜레이 시간을 알아내고 적당한 교차 시간을 적용해 볼 수 있겠다.

  • PDF

A review of using Function Point for the successful project (성공적인 프로젝트 수행을 위한 FP의 활용방안 검토)

  • Hwang, In-Soo;Oh, Eun-Sung;Kim, Heung-Shik
    • 한국IT서비스학회:학술대회논문집
    • /
    • 2002.06a
    • /
    • pp.165-172
    • /
    • 2002
  • 전통적으로 소프트웨어 프로젝트는 납기지연, 예산초과, 높은 결함율 등으로 타 산업분야의 프로젝트에 비해 매우 높은 실패율을 기록하고 있는 것으로 알려져 있다. 이 같은 소프트웨어 프로젝트의 실패원인에 대한 많은 연구결과는 소프트웨어가 갖고 있는 범위와 요구사항 정의의 어려움, 비가시성으로 인한 초기견적의 부정확성, 역시 가시성의 부족으로 진행상황파악의 어려움에 따른 진척관리의 애로, 더욱 큰 문제는 변경의 용이성과 변경에 대한 추적의 어려움 등을 지적하고 있다. 실패한 프로젝트들의 내용을 보면 대부분 계획의 부정확성이나 위험에 대한 대처의 부족 또는 진행 중 발생하는 변경에 대한 통제의 실패에서 찾아 볼 수 있다. 정확한 예측과 위험 예방 그리고 효과적인 통제대책이 소프트웨어 프로젝트를 성공으로 이끄는 3두 마차라는 지적이다. 정확한 예측의 핵은 프로젝트 산출물인 제품에 대한 정확한 규모측정에 있고, 위험 예방은 복잡도가 높거나 불확실성이 높은 컴포넌트의 자원소요에 대한 예측과 이에 대한 준비의 소홀에서 찾을 수 있으며, 효과적인 통제대책은 프로젝트 관리 프레임워크가 튼튼하지 못하거나 이의 준수를 위한 노력의 결핍에서 찾을 수 있을 것이다. 본 논문에서는 이 3두 마차 중 가장 근간이 되고 시발점이 되는 제품의 규모에 대한 예측에 초점을 맞추어 규모측정에 가장 합리적이고 객관적이며 실용성이 높다고 현재 국제적으로 높은 평가를 받고 있는 기능점수를 프로젝트 관리에 어떻게 활용해야 프로젝트를 성공시킬 수 있을 지의 방법에 대한 검토 결과를 제시고자 한다.

  • PDF