• Title/Summary/Keyword: 위험도 허용기준

Search Result 98, Processing Time 0.024 seconds

Ship Collision Risk Analysis of Bridge Piers (선박충돌로 인한 교각의 위험도 분석)

  • Lee, Seong-Lo;Bae, Yong-Gwi
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.9 no.4
    • /
    • pp.169-176
    • /
    • 2005
  • An analysis of the annual frequency of collapse(AF) is performed for each bridge pier exposed to ship collision. From this analysis, the impact lateral resistance can be determined for each pier. The bridge pier impact resistance is selected using a probability-based analysis procedure in which the predicted annual frequency of bridge collapse, AF, from the ship collision risk assessment is compared to an acceptance criterion. The analysis procedure is an iterative process in which a trial impact resistance is selected for a bridge component and a computed AF is compared to the acceptance criterion, and revisions to the analysis variables are made as necessary to achieve compliance. The distribution of the AF acceptance criterion among the exposed piers is generally based on the designer's judgment. In this study, the acceptance criterion is allocated to each pier using allocation weights based on the previous predictions.

Case Study on the Effluent Guidelines of Foreign Cases for the Development of Hazardous Noxious Substances (HNS) from Marine Industrial Facilities Management Guidelines, Korea: Focusing on the US EPA Guidelines (국내 해양산업시설의 위험유해물질 배출 관리 지침개발을 위한 국외 사례 검토: US EPA 배출지침을 중심으로)

  • Ki-young Choi;Chang-joon Kim;Young-Il Kim;Won-Soo Kang;Moonjin Lee
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.spc
    • /
    • pp.44-49
    • /
    • 2022
  • It is necessary to establish a marine environment management system in Korea for hazardous noxious substances (HNS) effluent from marine industrial facilities because the Marine Environment Management Act primarily focuses on pollution control from vessels and offshore man-made structures. In this study, we investigated the effluent guidelines of foreign cases focusing on the US Environmental Protection Agency (US EPA), which provides detailed information on the action levels and establishing principles for the industrial wastewater discharge of HNS. Based on the review, we also considered appropriate options for establishing new guidelines for Korea.

A Study on the Calculation and Application of the Risk in the Hydrogen Stations (수소충전소의 위험도 산출 및 적용에 대한 고찰)

  • Seo, Doo-Hyoun;Kim, Tae-Hun;Rhi, Kwang-Won
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.5
    • /
    • pp.1-9
    • /
    • 2020
  • In Korea, hydrogen stations are being promoted and commercialized. However, the risk assessment for the hydrogen station is not clear. In particular, it is not clear how to calculate the risk and acceptable criteria for a hydrogen station. Therefore, in this study, three hydrogen stations being installed were selected and general risks were calculated and the social risk of each hydrogen station was calculated. In general, the method of risk assessment is individual/social risk. This is an individual's death rate considering the frequency of accidents, And the likelihood of death according to the number of nearby residents. These can be used to calculate the level of risk for a hydrogen station. However, this method of calculate risks is the criteria for judging whether it is acceptable are unclear. For this reason, this study investigated the allowable standards for foreign risks and considered that they were acceptable by applying the risks of selected domestic hydrogen stations.

Ship Collision Risk Assessment for Bridges (교량의 선박충돌위험도 평가)

  • Lee, Seong Lo;Bae, Yong Gwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.1-9
    • /
    • 2006
  • An analysis of the annual frequency of collapse(AF) is performed for each bridge pier exposed to ship collision. From this analysis, the impact lateral resistance can be determined for each pier. The bridge pier impact resistance is selected using a probability-based analysis procedure in which the predicted annual frequency of bridge collapse, AF, from the ship collision risk assessment is compared to an acceptance criterion. The analysis procedure is an iterative process in which a trial impact resistance is selected for a bridge component and a computed AF is compared to the acceptance criterion, and revisions to the analysis variables are made as necessary to achieve compliance. The distribution of the AF acceptance criterion among the exposed piers is generally based on the designer's judgment. In this study, the acceptance criterion is allocated to each pier using allocation weights based on the previous predictions. To determine the design impact lateral resistance of bridge components such pylon and pier, the numerical analysis is performed iteratively with the analysis variable of impact resistance ratio of pylon to pier. The design impact lateral resistance can vary greatly among the components of the same bridge, depending upon the waterway geometry, available water depth, bridge geometry, and vessel traffic characteristics. More researches on the allocation model of AF and the determination of impact resistance are required.

Design Vessel Selection of Maritime Bridges using Collision Risk Allocation Model (충돌위험분배모델을 이용한 해상교량의 설계선박 선정)

  • Lee, Seong-Lo;Lee, Byung Hwa;Bae, Yong-Gwi;Shin, Ho-Sang
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.3
    • /
    • pp.123-134
    • /
    • 2006
  • In this study ship collision risk analysis is performed to determine the design vessel for collision impact analysis of the maritime bridge. Method II which is a probability based analysis procedure is used to select the design vessel for collision impact from the risk analysis results. The analysis procedure, an iterative process in which a computed annual frequency of collapse(AF) is compared to the acceptance criterion, includes allocation method of acceptance criterion of annual frequency of bridge component collapse. The AF allocation by weights seems to be more reasonable than the pylon concentration allocation method because this AF allocation takes the design parameter characteristics quantitatively into consideration although the pylon concentration allocation method brings more economical results when the overestimated design collision strength of piers compared to the strength of pylon is moderately modified. From the assessment of ship collision risk for each bridge pier exposed to ship collision, a representative design vessel for all bridge components is selected. The design vessel size varies much from each other in the same bridge structure depending upon the vessel traffic characteristics.

Determination Method of Target Residual Risk for Proper Information Security Level Determination (조직의 적정 정보 보안 수준 결정을 위한 목표 잉여 위험의 결정 방법)

  • 김정덕;이성일
    • Proceedings of the Korea Database Society Conference
    • /
    • 1999.10a
    • /
    • pp.129-139
    • /
    • 1999
  • 현재의 조직 환경에서 정보 보호 수준의 결정은 필수 불가결한 이슈가 되고 있지만 정보 보호 수준 구축을 위한 기준은 상대적으로 부족한 실정이다. 이에 본 논문에서는 정보 보호 수준 결정에 있어서 기준이 될 수 있는 중요한 요소인 위험에 대해서 기존의 위험 평가 프로세스를 분석하여 개선된 위험평가 프로세스를 제시하고 허용 가능한 위험을 결정하기 위한 중요 기준인 목표 잉여 위험의 결정 방법에 대해 논하고자 한다.

  • PDF

Ship Collision Risk of Suspension Bridge and Design Vessel Load (현수교의 선박충돌 위험 및 설계박하중)

  • Lee, Seong Lo;Bae, Yong Gwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1A
    • /
    • pp.11-19
    • /
    • 2006
  • In this study ship collision risk analysis is performed to determine the design vessel for collision impact analysis of suspension bridge. Method II in AASHTO LRFD bridge design specifications which is a more complicated probability based analysis procedure is used to select the design vessel for collision impact. From the assessment of ship collision risk for each bridge pier exposed to ship collision, the design impact lateral strength of bridge pier is determined. The analysis procedure is an iterative process in which a trial impact resistance is selected for a bridge component and a computed annual frequency of collapse(AF) is compared to the acceptance criterion, and revisions to the analysis variables are made as necessary to achieve compliance. The acceptance criterion is allocated to each pier using allocation weights based on the previous predictions. This AF allocation method is compared to the pylon concentration allocation method to obtain safety and economy in results. This method seems to be more reasonable than the pylon concentration allocation method because AF allocation by weights takes the design parameter characteristics quantitatively into consideration although the pylon concentration allocation method brings more economical results when the overestimated design collision strength of piers compared to the strength of pylon is moderately modified. The design vessel for each pier corresponding with the design impact lateral strength obtained from the ship collision risk assessment is then selected. The design impact lateral strength can vary greatly among the components of the same bridge, depending upon the waterway geometry, available water depth, bridge geometry, and vessel traffic characteristics. Therefore more researches on the allocation model of AF and the selection of design vessel are required.

The Patient Specific QA of IMRT and VMAT Through the AAPM Task Group Report 119 (AAPM TG-119 보고서를 통한 세기조절방사선치료(IMRT)와 부피적세기조절회전치료(VMAT)의 치료 전 환자별 정도관리)

  • Kang, Dong-Jin;Jung, Jae-Yong;Kim, Jong-Ha;Park, Seung;Lee, Keun-Sub;Sohn, Seung-Chang;Shin, Young-Joo;Kim, Yon-Lae
    • Journal of radiological science and technology
    • /
    • v.35 no.3
    • /
    • pp.255-263
    • /
    • 2012
  • The aim of this study was to evaluate the patient specific quality assurance (QA) results of intensity modulated radiation therapy (IMRT) and volumetric modulated arc therapy (VMAT) through the AAPM Task Group Report 119. Using the treatment planning system, both IMRT and VMAT treatment plans were established. The absolute dose and relative dose for the target and OAR were measured by using an ion chamber and the bi-planar diode array, respectively. The plan evaluation was used by the Dose volume histogram (DVH) and the dose verification was implemented by compare the measured value with the calculated value. For the evaluation of plan, in case of prostate, both IMRT and VMAT were closed the goal of target and OARs. In case of H&N and Multi-target, IMRT was not reached the goal of target, but VMAT was reached the goal of target and OARs. In case of C-shape(easy), both were reached the goal of target and OARs. In case of C-shape(hard), both were reached the goal of target but not reached the goal of OARs. For the evaluation of absolute dose, in case of IMRT, the mean of relative error (%) between measured and calculated value was $1.24{\pm}2.06%$ and $1.4{\pm}2.9%$ for target and OAR, respectively. The confidence limits were 3.65% and 4.39% for target and OAR, respectively. In case of VMAT the mean of relative error was $2.06{\pm}0.64%$ and $2.21{\pm}0.74%$ for target and OAR, respectively. The confidence limits were 4.09% and 3.04% for target and OAR, respectively. For the evaluation of relative dose, in case of IMRT, the average percentage of passing gamma criteria (3mm/3%) were $98.3{\pm}1.5%$ and the confidence limits were 3.78%. In case of VMAT, the average percentage were $98.2{\pm}1.1%$ and the confidence limits were 3.95%. We performed IMRT and VMAT patient specific QA using TG-119 based procedure, all analyzed results were satisfied with acceptance criteria based on TG-119. So, the IMRT and VMAT of our institution was confirmed the accuracy.