• Title/Summary/Keyword: 위험도 기반 우선순위 선정

Search Result 25, Processing Time 0.028 seconds

Development of an Inundation Risk Evaluation Method Based on a Multi Criteria Decision Making (다기준 의사결정기법을 기반으로 하는 침수위험 평가기법의 개발)

  • Park, Moo-Jong;Choi, Sung-Wook
    • Journal of Korea Water Resources Association
    • /
    • v.41 no.4
    • /
    • pp.365-377
    • /
    • 2008
  • In this study, PROMETHEE(Preference Ranking Organization METHod for Enrichment Evaluations) which is one of the multi criteria decision making methods is applied to estimate the relative inundation risk of the urban subcatchment. For this purpose, several factors which have an effect on the inundation risk are selected and used to perform PROMETHEE. Those are elevation average, slope average, density of conduit, population and sediment yields per unit area of each subcatchment. Based on them, PROMETHEE is performed and the relative inundation risk for each subcatchment is estimated. For the validation of the suggested method, the results from the suggested method are compared with the historical inundation records occured on 1998 and the relative inundation risk estimated by the method considering sediment yields per unit area only. From the comparison, it is found that the suggested method may generate better results to estimate the relative inundation risk of each subcatchment than the method considering sediment yields per unit area only. Also, it can be applied to establish a rehabilitation order of subcatchments for mitigating the inundation risk.

A Method for Calculating Exposure Risks of Privacy Information based on Website Structures (웹사이트의 구조를 고려한 개인정보 노출 위험도 계산 기법)

  • Lee, Sue Kyoung;Son, Jin Sik;Kim, Kwanho
    • The Journal of Society for e-Business Studies
    • /
    • v.21 no.1
    • /
    • pp.1-14
    • /
    • 2016
  • This research proposes a method that aims to evaluate the risk levels of websites based on exposure risks of privacy information. The proposed method considers two aspects as follows. First, we define the risk levels of each privacy information according to its own inherent risk. Second, we calculate the visiting probability of a webpage to measure the expected of the actual exposure of privacy information on that webpage. In this research, we implemented an system to prove that automatically collects websites and calculates their risk levels. For the experiments, we used a real world dataset consisting of a total of websites for 4 categories such as university, bank, central government agency, and education. The experiment results show that the websites in the bank category are relatively well managed, while the others are needed to cope with the exposure of privacy information. Finally, the proposed method in this research is expected to be further utilized in establishing a priority-based approach to alleviate of the privacy information exposure problems.

Risk Analysis Method for Deriving Priorities for Detailed Inspection of Small and Medium-sized Fill Dam (중소형 필댐의 정밀점검 우선순위 도출을 위한 간이 위험도 분석 방법)

  • Kim, Jinyoung;Kang, Jaemo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.21 no.10
    • /
    • pp.11-16
    • /
    • 2020
  • Korea's agricultural reservoir is one of the country's major infrastructures and plays an important role in people's lives. However, aging reservoirs are a risk for life and property. Currently, large and small dams and reservoirs have been constructed nationwide for more than 40 years of aging. Dams and reservoirs built nationwide are managed by various institutions. Therefore, it is difficult to manage all dams and reservoirs due to cost and time. Managers in the field with less management personnel and lack of expertise should be able to quickly identify risk factors for multiple reservoirs. In this study, risk factors such as seepage, leakage, settlement slide, crack and erosion were selected. To assess the risk of the items, we used the analytical hierarchical process (AHP), one of the Multi-Criteria Decision Making (MCDM) methods. The analysis showed that seepage has the greatest impact on reservoir collapse. It is judged that the priority of detailed diagnosis can be determined by evaluating the risk of dam reservoir collapse in a convenient way in advance using the calculated weight.

Analysis of Effectiveness on Improving Hazardous Roads (위험도로 개선사업에 따른 효과 분석에 관한 연구)

  • 하태준;박제진;장안상;박찬모
    • Journal of Korean Society of Transportation
    • /
    • v.20 no.4
    • /
    • pp.213-222
    • /
    • 2002
  • 교통사고가 중요한 사회 문제로 대두되어 정부는 교통안전대책의 실질적인 추진 방안으로 "교통사고 잦은 곳"과 "위험도로" 개선사업을 제시·시행하고 있다. 이에 "교통사고 잦은 곳" 개선사업은 추진현황에 따라 각 년도별 기본 개선계획의 평가 및 경제적 타당성에 대한 효과분석이 이루어지고 있다. "위험도로"'의 경우 모든 사업을 건설교통부 산하 국도유지사무소에서 진행을 하고 있으나, 광범위한 사업으로 인한 업무과중 및 개선사업비 조달 등의 문제로 개선된 현황의 체계적인 효과분석이 이루어지지 못하고 있는 실정이다. 이에 따라 본 연구에서는 "위험도로" 개선사업에 대한 효과분석을 수행하여 보다 비용-효율적인 개선사업이 될 수 있는 기반을 마련하고자 한다. 이를 위해 전체 위험도로 구간 중에서 '광주국도유지사무소' 및 '순천국도유지사무소' 관할 구역 내의 "위험도로"로 선정(1995년)된 도로구간 중 1999년 이전에 도로개선공사가 완료된 후 현재 교통소통이 원활하게 진행되는 18개 도로구간을 연구 대상으로 선택하였다. 선택되어진 18개 구간에 대한 도로개선공사 전후의 교통사고건수 및 교통사고율을 효과척도로 삼고 각 사고에 대한 소요비용을 기준으로 경제성 평가를 실시하였다. 이를 근거로 "위험도로" 개선사업에 대한 타당성조사 및 효과분석을 실시한 결과 "위험도로" 개선사업의 타당성이 입증되었다. 연구 분석결과가 전라도 권역의 사업을 중심으로 진행되어져 전국적인 개선사업에 대한 대표성을 가지고 있다고 볼 수는 없으나, 체계적인 분석을 통한 개선사업의 효과를 구체화 할 수 있는 대안을 제시할 수 있을 것으로 사료된다. 더불어 공사 완료된 도로구간에 대한 상세한 공사비 내역과 다수의 개선방안별 자료가 갖추어지면 위험도로의 사고율과 개선방안별 상관관계를 관련 비용을 중심으로 도출함으로서 비용-효율적인 개선 방안을 제시할 수 있을 것이다. 또한 비용-효율적인 개선 방안을 기반으로 한 각각의 사업 투자우선 순위 결정방안에 관한 지속적 인 연구가 요망된다.

FMEA for rotorcraft landing system using Dempster-Shafer evidence theory (Dempster-Shafer 증거 이론을 이용한 회전익 항공기 착륙장치의 FMEA)

  • Na, Seong-Hyeon;So, Hee-Soup
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.22 no.2
    • /
    • pp.76-84
    • /
    • 2021
  • The quality assurance activities can detect the factors that affect the quality based on risk identification in the course of mass production. Risk identification is conducted with risk analysis, and the risk analysis method for the rotorcraft landing system is selected by failure mode effects analysis (FMEA). FMEA is a method that detects the factors that can affect the product quality by combining severity, occurrence, and detectability. The results of FMEA were prioritized using the risk priority number. On the other hand, these methods have certain shortcomings because the severity, occurrence, detectability are weighted equally. Dempster-Shafer evidence theory can conduct uncertainty analysis for the opinions with personal reflections and subjectivity. Based on the theory, the belief function and the plausibility function can be formed. Moreover, the functions can be utilized to evaluate the belief rate and credibility. The system is exposed to impact during take-off and landing. Therefore, experts should manage failure modes in the course of mass production. In this paper, FMEA based on the Dempster-Shafer evidence theory is discussed to perform risk analysis regarding the failure mode of the rotorcraft landing system. The failure priority was evaluated depending on the factor values. The results were derived using belief and plausibility function graphs.

Decision Making of Seismic Performance Management for the Aged Road Facilities Based on Road-Network and Fragility Curve (취약도곡선을 이용한 도로망기반 노후도로시설물 내진성능관리 의사결정)

  • Kim, Dong-Joo;Choi, Ji-Hae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.5
    • /
    • pp.94-101
    • /
    • 2021
  • According to the Facility Management System (FMS) operated by the Korea Authority of Land & Infrastructure Safety, it is expected that the number of aging facilities that have been in use for more than 30 years will increase rapidly to 13.9% in 2019 and 34.5% in 2929, and end up with a social problem. In addition, with the revision of "Common Application of Seismic Design Criteria" by the Ministry of Public Administration and Security in 2017, it is mandatory to re-evaluate all existing road facilities and if necessary seismic reinforcement should be done to minimize the magnitude of earthquake damage and perform normal road functions. The seismic performance management-decision support technology currently used in seismic performance management practice in Korea only determines the earthquake-resistance reinforcement priority based on the qualitative index value for the seismic performance of individual facilities. However with this practice, normal traffic functions cannot be guaranteed. A new seismic performance management decision support technology that can provide various judgment data required for decision making is needed to overcome these shortcomings and better perform seismic performance management from a road network perspective.

Evaluation of hydrological drought impact according to future population change (미래 인구변화에 따른 수문학적 가뭄 영향 평가)

  • Shin, Ji Yae;Son, Ho Jun;Kwon, Hyun-Han;Kim, Tae-Woong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.299-299
    • /
    • 2022
  • 수문학적 가뭄 발생의 직접적 영향은 강수부족량이나, 다양한 사회경제적 인자들은 수문학적 가뭄에 간접적으로 영향을 미치고 있다. 물관리 선진기관에서는 인간의 활동 및 물관리 방식에 따라 수문학적 가뭄을 심화시키거나 완화시킬 수 있음을 인지하고, 인간의 물사용이 가뭄에 미치는 영향을 평가하기 위한 다양한 연구가 이루어지고 있다. 본 연구에서는 강수량 및 미래의 인구변화에 따른 수문학적 가뭄의 영향의 정도를 판단함으로써, 인간의 활동이 가뭄에 미치는 영향을 정량적으로 제시하고자 한다. 충정북도 시군지역을 대상지역으로 선정하였으며, 시군 장래인구 추정값을 미래 인구자료로, 미래 유출량이 산정되어 제공되는 RCP 4.5와 RCP 8.5시나리오를 활용하여 미래 가뭄상황 예측하였다. 강수량 및 인구변화가 수문학적 가뭄에 미치는 영향 평가를 위하여 코플라함수 기반의 베이지안 네트워크 모형이 활용하였다. 베이지안 네트워크는 강수량, 인구밀도, 수문학적 가뭄사이의 관계 도출을 위하여 활용되었으며, 베이지안 네트워크 내의 결합확률의 산정을 위하여 코플라 함수가 활용되었다. 미래의 강수량 및 인구밀도의 변화에 따른 수문학적 가뭄의 영향 관계를 분석한 결과는 다음과 같다. 강수량이 인구밀도보다 수문학적 가뭄의 발생에 영향을 미치며, 약 0.2~0.3 정도 발생확률이 크게 산정되었다. 두 인자를 동시에 고려할 경우, 강수량이 적고, 인구밀도가 높아지는 조건(F(강수량)=0.1, F(인구밀도)=0.9)에서는 조건부 CDF 변화율이 크게 나타나, 곧 수문학적 가뭄의 위험성이 높음을 확인할 수 있었다. 인구밀도는 수문학적 가뭄의 발생 위험성을 높이 알려져 있으나, 정량적으로 그 값을 제시한 연구 사례는 찾기 어렵다. 이에 따라 본 연구에서는 가뭄의 영향정도를 정량적으로 표현하였으며, 한 인자만의 영향이 아닌 두 개 이상의 인자들의 복합적인 영향 정도를 제시함으로써 수치적인 비교가 가능하게 하였다. 미래 추정 인자가 인구자료가 한정적이라 인구 자료만을 활용하여 수문학적 가뭄에 미치는 영향을 분석하였으나, 다른 사회경제적 지표를 활용하여 미래 변화에 따른 미래 수문학적 가뭄의 영향 정도의 비교 및 분석 결과를 바탕으로 가뭄 대응 우선순위 선정을 위한 연구자료로 활용 가능할 것으로 사료된다.

  • PDF

Study for implementation of smart water management system on Cisangkuy river basin in Indonesia (인도네시아 찌상쿠이강 유역의 지능형 물관리 시스템 적용 연구)

  • Kim, Eugene;Ko, Ick Hwan;Park, Chan Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.469-469
    • /
    • 2017
  • 기후 변화 및 환경오염으로 인하여 물부족 국가가 세계적으로 증가하고 있는 추세이며, 특히 집중형 강우의 형태가 많아짐에 따라 홍수피해 및 상수공급의 문제가 사회적으로 큰 이슈가 되고 있다. 최근 20여 년간의 급속한 경제성장과 도시화 과정에서 인도네시아는 인구와 산업의 과도한 도시집중으로 지난 1960-80년대 한국이 산업화 과정에서 겪었던 것보다 훨씬 심각한 환경문제에 직면하고 있으며, 자카르타와 반둥을 포함하는 광역 수도권 지역의 물 부족과 수질 오염, 환경문제가 이미 매우 위험한 수준에 도달하고 있는 실정이다. 특히, 찌따룸강 중상류에 위치한 인도네시아 3대 도시인 반둥시는 고질적인 용수부족 문제를 겪고 있다. 2010년 현재 약 일평균 15 CMS의 용수가 부족한 상황이며, 2030년에는 지속적인 인구증가로 약 23 CMS의 용수가 추가로 더 필요한 것으로 전망된다. 이러한 용수공급 문제 해결을 위해 반둥시 및 찌따룸강 유역관리청은 댐 및 지하수 개발, 유역 간 물이동 등의 구조적인 대책뿐만 아니라 비구조적인 대책으로써 기존 및 신규 저수지 연계운영을 통한 용수이용의 효율성을 높이는 방안을 모색하고 있다. 이에 따라 본 연구에서는 해당유역의 용수공급 부족 문제를 해소할 수 있는 비구조적인 대책의 일환으로써 다양한 댐 및 보, 소수력 발전, 취수장 등 유역 내 수리 시설물의 운영 최적화를 위한 지능형 물관리 시스템 적용 방안을 제시하고자 한다. 본 연구의 지능형 물관리 시스템은 센서 및 사물 인터넷(Internet of Things, IoT), 네트워크 기술을 바탕으로 시설물 및 운영자, 유관기관 간의 양방향 통신을 통해 유기적인 상호연계 체계를 제공 할 수 있다. 또한 유역의 수문상황과 시설물의 운영현황, 용수공급 및 수요 현황을 실시간으로 확인함으로써 수요에 따른 즉각적인 용수공급량의 조절이 가능하다. 또한, 빅데이터 분석 및 기계학습(Machine Learning)을 통해 개별 물관리 시설물에 대한 최적 운영룰을 업데이트할 수 있으며, 유역의 수문상황과 용수 수요 현황을 고려하여 최적의 용수공급 우선순위를 선정할 수 있다. 지능형 물관리 시스템 개발의 목적은 찌상쿠이 유역의 수문현황을 실시간으로 모니터링하고, 하천시설물의 운영을 분석하여 최적의 용수공급 및 배분을 통해 유역의 수자원 활용 효율성을 향상시키는 데 있다. 이를 위해 수문자료의 수집체계를 구축하고 기관간 정보공유체계를 수립함으로써 분석을 위한 기반 인프라를 구성하며, 이를 기반으로 유역 유출을 비롯한 저수지 운영, 물수지 분석을 수행하고, 분석 및 예측결과, 과거 운영 자료를 토대로 새로운 물관리 시설 운영룰 및 시설물 간 연계운영 방안, 용수공급 우선순위 의사결정 등을 지원하고자 한다. 본 연구의 지능형 물관리 시스템은 통합 DB를 기반으로 수리수문 현상의 모의 분석을 통해 하천 시설물 운영의 합리적 기준을 제시함으로써 다양한 관리주체들의 시설물운영에 대한 이견 및 분쟁을 해소하고, 한정된 수자원과 다양한 수요 간의 효율적이고 합리적인 분배 및 시설물 운영문제를 해결하기 위한 의사결정도구로써 활용할 수 있을 것으로 기대된다.

  • PDF

Development of Maintenance Scenario Method for Small and Medium-sized Bridges Using Risk Matrix (리스크매트릭스를 활용한 중소규모 교량의 유지관리 시나리오 기법 개발)

  • Park, Hyun-Chan;Shin, Byoung-Gil;Cho, Choong-Yuen;Kim, Young-Min;Chang, Buhm-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.161-168
    • /
    • 2021
  • This paper is a maintenance system for bridge represented by Class 3 and other than by law bridges. Domestic bridge are divided into Class 1 & 2 bridges and Class 3 & other than by law bridges. The number of type 3 and other than by law bridges is very large. But, it is considered to be of relatively low importance compared to Class 1 & 2 Bridge Bridge. So, in this paper is propose a maintenance system and procedure for small & medium-sized bridges. However, because the number of small & medium-sized bridges is large, it is not possible to evaluate the performance of all bridges like Class 1 & 2 bridge. The reason is the lack of manpower and budget. Based on the Risk Matrix method, a maintenance procedure was created to select the bridge for which performance evaluation should be performed first. For this purpose, basic information of the bridge is used. And, the developed maintenance procedures were applied to the bridges in actual use.

Mapping Technique for Flood Vulnerable Area Using Surface Runoff Mechanism (지표유출메커니즘을 활용한 홍수취약지구 표출 기법)

  • LEE, Jae-Yeong;HAN, Kun-Yeun;KIM, Hyun-Il
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.22 no.4
    • /
    • pp.181-196
    • /
    • 2019
  • Floods can be caused by a variety of factors, and the main cause of floods is the exceeding of urban drainage system or river capacity. In addition, rainfall frequently occurs that causes large watershed runoff. Since the existing methodology of preparing for flood risk map is based on hydraulic and hydrological modeling, it is difficult to analyse for a large area because it takes a long time due to the extensive data collection and complex analysis process. In order to overcome this problem, this study proposes a methodology of mapping for flood vulnerable area that considered the surface runoff mechanism. This makes it possible to reduce the time and effort required to estimate flood vulnerabilities and enable detailed analysis of large areas. The target area is Seoul, and it was confirmed that flood damage is likely to occur near selected vulnerable areas by verifying using 2×2 confusion matrix and ROC curve. By selecting and prioritizing flood vulnerable areas through the surface runoff mechanism proposed in this study, the establishment of systematic disaster prevention measures and efficient budget allocation will be possible.