• Title/Summary/Keyword: 위성발사(launch)

Search Result 404, Processing Time 0.023 seconds

The Launch of the COMS by Ariane-5 Launch Vechicle (아리안-5 발사체를 이용한 통신해양기상위성 발사)

  • Lee, Ho-Hyung;Kim, Bang-Yeop;Choi, Jung-Su;Han, Cho-Young
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.36 no.3
    • /
    • pp.291-297
    • /
    • 2008
  • The launch of the COMS by using Ariane-5 launch vehicle is introduced. First, the COMS is introduced briefly, and then, the Ariane-5 launch vehicle is introduced including detail description of the improvement of Vulcain-1 engine of Ariane-5G to Vulcain-2 engine of Ariane-5ECA for 20% increase of thrust. Then, the launch process of the COMS is introduced. The COMS will be launched from the Guiana Space Center in Kourou, French Guiana. After the final check at PPF the COMS is transferred to HPF in the same building for fueling, and it is integrated to the launch vehicle adaptor at HPF, too. Then, this assembly is transferred to Final Assembly Building. After the satellites to be launched together are integrated to the launch vehicle on the launch table in the Final Assembly Building, the launch table loaded with the launch vehicle is moved to the launch pad for launch. The events during the launch vehicle flight is also introduced.

Geostationary Satellite Launch Site and Orbit Injection (정지궤도위성 발사위치와 궤도투입에 관한 고찰)

  • DONG-SUN KIM
    • Journal of Aerospace System Engineering
    • /
    • v.18 no.3
    • /
    • pp.27-33
    • /
    • 2024
  • According to the success of the Nuri Space Launch Vehicle (KSLV-II) and the development goal of the next generation space launch vehicle (KSLV-III), it is expected that the domestic geostationary satellite capability will be increased from (1 to 3.7) ton. Also, it is predicted that substantial ability of about 1 ton can be provided for the space exploration of the Moon, Mars, asteroids, etc. The Goheung space launch site is optimized for sun-synchronous small satellites, and due to the essential precondition that the launch trajectory does not impinge another country's sovereign airspace, it is not satisfactory as a geostationary satellite launching site. Its latitude also requires more energy to shape the rotating orbital plane from the initial injection status. This results in a decreasing factor of economic feasibility, including the operating complexity. Therefore, in parallel with the development of a next generation space launch vehicle, the practical process for acquisition of oversea land or sea space launch site near the Earth's equator and research for the optimization of orbiting methods of geostationary satellite injection must be continued.

KSLV-II Cost Estimate using TRANS COST 7.1 (TRANSCOST 7.1을 적용한 실용위성 발사체 비용추정)

  • Seo, Yun-Kyoung;Oh, Bum-Seok
    • Aerospace Engineering and Technology
    • /
    • v.6 no.2
    • /
    • pp.119-125
    • /
    • 2007
  • Space launch vehicle development needs many kinds of technologies synthetically. Nowadays, KARI (Korea Aerospace Research Institute) has developed a space launch vehicle, KSLV-I (Korea Space Launch Vehicle-I), that is able to load with an 100kg payload. After that it plans to develop Korean Space Launch Vehicle. As space launch vehicle becomes more complicate and larger, it needs a scientific and analytic development cost estimation. In this paper a cost estimation for KSLV-II using TRANSCOST 7.1 was studied.

  • PDF

Impacts of Payload Weights on the Cost Effectiveness of Reusable Launch Vehicles (재사용발사체의 비용 효용성에 미치는 임무중량의 영향)

  • Yang, Soo Seok
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.23 no.4
    • /
    • pp.1-9
    • /
    • 2019
  • Recently, in the space market, there has been a rapid reduction of the launch price. The major reason is that a few commercial companies, especially SpaceX, began to enter into the space market about ten years ago, which has changed the space market from monopolization to competition, and accelerated the adoption of commercial efficiency in the technology and management. Also, the successful landing and recovery of a first stage in 2016 by SpaceX proved to be a prelude to opening a new era of reusable launch vehicles, and SpaceX declared the groundbreaking launch price through using the reusable launch vehicle. This study calculates the total launch cost required to put a certain satellite into the LEO, compares the launch cost in three cases with different payload weights, and reviews the impacts of the payload on the cost effectiveness of a reusable vehicle. The total launch cost is divided into 6 subsections cost, namely development cost, production cost, refurbishment cost, operation cost, fixed-cost of factory and launch site, and insurance cost. The cost estimation relationships used in the calculation are taken from the commonly proven cost models such as TRANSCOST.

The design of Ground Flight Termination System for Space Launch Application (위성발사를 위한 지상국비행종단지령장비 설계)

  • Lee, Sung-Hee;Bae, Young-Jo;Oh, Chang-Yul;Lee, Hyo-Keun
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.229-235
    • /
    • 2008
  • The ground flight termination system(GFTS) could be used for the termination of launch vehicle in flight motion when the launch vehicle deviates from the designated route due to the system malfunction or failure as well as the launch vehicle can't be tracked by the ground tracking system. This paper introduces the basic concept and design of the ground flight termination system to be used for KSLV launch mission in NARO space center. In order to design the optimal ground flight termination system for KSLV launch application, the operational concept reflected on the flight trajectory and system characteristics of KSLV launch vehicle should be considered. Moreover the RF link budget analysis, and the analysis for system availability and reliability are done. Based on the analysis above, the each subsystem of ground flight termination to transmit the termination signal in stable is designed for KSLV launch mission.

  • PDF

A Study on the Verifying Structural Safety of Satellite Structure by Coupled Load Analysis (연성하중해석을 통한 위성구조체의 구조안정성 검증 연구)

  • Kim, Kyung-Won;Kim, Sun-Won;Lim, Jae-Hyuk;Kim, Chang-Ho;Hwang, Do-Soon
    • Journal of Satellite, Information and Communications
    • /
    • v.5 no.1
    • /
    • pp.63-68
    • /
    • 2010
  • Satellite structure should be designed to support safely the payload and several actuators under launch and on-orbit environments. After the configuration design of satellite, the structural analysis is performed using quasi-static load provided by launch vehicle manufacturer for detail design of satellite. In order to verify the safety of satellite structure designed using quasi-static loads, launch vehicle manufacturer performs coupled load analysis with satellite and launch vehicle models. For developing satellite, satellite model was reduced into the Craig-Bampton model for coupled load analysis, and delivered to the launch vehicle manufacturer. Launch vehicle manufacturer have done the coupled load analysis, and offered the acceleration and displacement results to the satellite manufacturer. From the analysis results, we have confirmed that satellite is designed safely and there is no possibility of interference and conflict in the inner/outer side of satellite.

Air-based Launch Trends and Development of Upward-maneuver Air-Launch Technology (항공기 탑재 기반 공중발사 기술 동향 및 상방발사 기술 개발 방안)

  • Yu-jin Lee;Jae-Won Jung;Jin-Shik Lim;Kil-Hun Kim
    • Journal of Advanced Navigation Technology
    • /
    • v.27 no.5
    • /
    • pp.519-527
    • /
    • 2023
  • Air-launch means launching from aircraft such as fighter jets, and has various advantages, such as cost reduction and less environmental/weather impact during launch. However, there are no air-launch satellite in Korea. Examining air-based launch satellite and anti-satellite missiles operated and developed by foreign private companies and various countries confirmed the necessity of domestic research and development. In South Korea, various research activities, including satellite launch system design and development approaches for different launch platforms, have been carried out mainly by academia. Development of upward maneuver air launch technology which is launched in the air when the aircraft is moving upward is suggested. Additionally, an introduction to wind tunnel tests for safety separation verification is provided. A new concept for a test facility has been suggested to conduct drop tests.

Design of Deep Space Missions Using a Dedicated Small Launch Vehicle (소형위성 전용 발사체를 이용한 심우주 임무 설계)

  • Choi, Su-Jin;Loucks, Mike;West, Stephen;Seo, Daeban;Lee, Keejoo
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.50 no.12
    • /
    • pp.877-888
    • /
    • 2022
  • Recently, as the CAPSTONE, a precursor mission for Lunar Gateway, was launched on a small launch vehicle for the purpose of demonstrating communications and navigation technology in the NRHO, large attention was brought to this event that enabled high-impact deep space mission using dedicated small launch vehicle and small spacecraft. In this study, we introduced the concept of a dual launch operation and examined the capability of the new concept in the exploration of the Moon, Mars and asteroid. It turned out a single launch is sufficient for the lunar low orbit mission up to around 247 kg, and the dual launch option can transport 215 kg and 183 kg to nearby destinations as such as Mars and astroid Apophis respectively.

Foreign Launch Vehicle Upper Stage Collision and Contamination Avoidance Maneuver Analysis (해외 발사체 상단의 충돌 및 오염 회피 기동 분석)

  • Park, Chang-Su;Cho, Sang-Bum;Song, Eun-Jung;Roh, Woong-Rae
    • Aerospace Engineering and Technology
    • /
    • v.7 no.1
    • /
    • pp.194-201
    • /
    • 2008
  • The launch vehicle upper stage generally executes collision and contamination avoidance maneuver after the satellite separation. Through this maneuver the satellite safely settles in its orbit and the launch vehicle moves away from the satellite with minimum contamination. In this paper collision and contamination avoidance maneuvers by foreign launch vehicles are analyzed. Criteria for satellite contamination during the avoidance maneuver is given for KSLV-I upperstage.

  • PDF

Case Studies and Lessons Learned from Launch Environmental Test for Nanosatellites (나노급 초소형위성 발사환경시험 사례 및 교훈)

  • Kim, Min-Ki;Kim, Hae-Dong;Choi, Won-Sub;Kim, Jin-Hyung;Kim, KiDuck;Kim, Ji-Seok;Cho, Dong-Hyun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.50 no.6
    • /
    • pp.423-433
    • /
    • 2022
  • This paper introduces the case studies of launch environmental test for cube nanosatellites and lessons learned of the design and integration from those. Generally, nanosatellites are launched and deployed in space while being contained in nanosatellite deployers, mechanical loads of launch are transferred through the deployer. This characteristic make nanosatellites under larger loads and higher possibilities of mechanical failure. This study represents guidelines of the design and the integration of the nanosatellites by showing the cases of launch environmental test of nanosatellite system. Moreover, it is suggested that the modern nanosatellite deployer with the capability of fixing the internal nanosatellite be preferable to conventional deployer by comparing the test results with those deployers.