Journal of Information Technology Applications and Management
/
제11권3호
/
pp.23-33
/
2004
Internet bid systems have been widely used recently. In those systems, the bid price is provided by the seller. When the bid price is set too high compared with the normal price, the successful bid rate can be decreased. Otherwise, when it is set too low based on inaccurate information, it can result in a successful bid with no profit at all. To resolve this problem, we propose an agent that automatically generates bid prices for sellers based on various costing methods such as the high-low point method, the scatter diagram method, and the learning curve method. Through performance experiments, we have found that the number of successful bids with appropriate profit can be increased using the bid pricing agent. Among the costing methods, the learning curve method has shown the best performance. Also, we discuss about how to design and implement the bid pricing agent.
최근 건설공사에서 많은 물량이 투입되는 기초구조의 자재비 및 원가절감을 위해 여러 가지 기초구조시스템이 개발되고 있으나, 보편적으로 현장에 적용하기에는 다소 무리가 있는 것으로 지적받고 있다. 본 연구는 강판을 ㄷ자형으로 절곡한 기초전단보강시스템을 개발하기 위한 해석적 연구의 일환으로 진행되었다. 현행 전단머리 보강식에서는 기초판에 대한 전단내력 산정을 위한 기준식이 마련되어 있지 않으며 플랫플레이트 슬래브의 기준식에 따르도록 되어져있다. 그러나 기초판은 지반에 지지되는 구조물로 플랫플레이트 슬래브와는 경계조건이 다르다. 따라서 본 연구에서는 지반에 지지된 경우와 플랫플레이트 슬래브와 같이 모멘트 제로지점을 단순지지한 형태로 기초구조물을 모델링하여 해석을 실시하였다. 해석프로그램은 유한 요소기법이 적용된 ABAQUS를 사용하여 두 지지조건의 차이가 구조물에 미치는 영향을 비교분석하였다.
본 논문에서는 국가 경제성장률과 국내 전기공사실적 증가률에 대한 상관관계를 비교분석하였으며, 연간 전기공사 실적에 대한 항목별 구성비율 중 노무비가 차지하는 비율을 분석하였다. "국가를 당사자로 하는 계약에 관한 법률 시행령 및 시행규칙"과 회계예규인 "예정가격 작성기준"에 근거하여 원가계산에 의한 전기공사 예정가격 산정의 기초자료로 활용되는 전기부문 표준품셈 체계개편이 전기공사업에 미치는 영향을 최근 발주된 대형공사에 체계개편 전과 체계개편 후 공사금액을 비교하여 종합적으로 분석하였다.
Price quotations for SOR / RFQ from OEM clients is a very important process in the automotive parts industry. However, OEM clients are demanding a price quote on short duration but it takes long delivery time due to sales, research and development, purchasing, production and cost management departments role and jobs focused on detail and responsibility. And to provide a reasonable alternative with eliminating the waste of non-value processes is to achieve OEM clients satisfaction through standardized and parallel processing, IT system based on the systems and processes of global benchmark companies.
Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.
In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.
Purpose: This study was aimed to estimate nursing cost for hemodialysis of tertiary hospitals using Resource Based Relative Value Scale(RVRBS). Method: First, we calculated nursing workload of the each hemodialysis-nursing behaviors compared with basic nursing behavior(check vital sign) for the most severe hemodialysis patients in general hospitals. Second, we measured each spent time according to each nursing behaviors. Third, we computed Resource Based Relative Value(RBRV) scores and nursing expenses of each 14 nursing behavior for hemodialysis. Finally, we estimated nursing cost of each hemodialysis-behavior for the most severe hemodialysis-patients in general hospitals. Result: The mean RBRV scores for each nursing behaviors were from 218.9 to 383.9 points. The highest RBRV socres were 383.9(Complication during hemodialysis). The Nursing behavior that spent the most time was "access the vascular( 31.7 minutes)". Nursing cost per hemodialysis for the patient with severe condition was estimated 63,455(won). Conclusion: Total average workload was 347.6 points and total spent time was 306.5 minutes for 14 hemodialysis nursing behaviors provided to severe patients. There were clear differences in nursing workload and cost according to patient's severity-mild, moderate and severe class.
A cost analysis for hospitalized patients was performed based on the RBRVS in order to determine an appropriate nursing fee schedule. The study was conducted through three phases as follows: 1) Nursing activities provided for the inpatients currently in Korea were identified and classified using a taxonomy which was developed by our research team through the Delphi process. 2) The resource-based relative points for every nursing activity according to nursing time, mental effort and judgement, technical skill, physical effort and stress were determined through a survey of 300 clinical RNs working at 5 tertiary hospitals from May 25 to July 25. 1998. 3) The nursing cost of every nursing activity for hospitalized patients was estimated based on the RBRVS. As a result, 136 nursing activities were identified and classified by nursing processes and nursing domains. However, our classification system of nursing activities should continue to be refined, and all nursing practices should be standardized. The nursing activities were given resource-based relative points ranging from 100 to 400 points, then each nursing activity was assigned a value for the RBRVS, which was determined by the exponential function of 2resource-based relative point/100. Thus, a value of 2 was calculated for 100 points, 4 for 200 points, 8 for 300 points, and 16 for 400 points. Meanwhile, the unit cost of nursing was calculated as 170 Won. The nursing cost of 136 nursing activities was estimated using the RBRVS as shown in
. A proper nursing fee schedule for a new reimbursement system based upon the results of the above study should be prepared in the near future.
Purpose: A cost analysis for nursing services in operative nursing unit, emergency nursing unit, and ambulatory nursing unit was performed using patient classification system by nursing intensity in order to determine an appropriate nursing fee schedule. Method: The data were collected from 4 secondary hospitals and 5 tertiary hospitals from November 14th 2000 to January 15th 2001. The study was conducted through four phases as follows: 1) Nursing hours of each nursing service in special nursing units were measured using three kinds of patient classification systems by nursing intensity. 2) The nursing cost of nursing services in operative nursing unit, emergency nursing unit, and ambulatory nursing units was estimated based on patient classification system by nursing intensity. Results: As a result, nursing hours by nursing intensity of each special nursing unit were measured, and every nursing cost by nursing intensity in operation room and emergency room was estimated, meanwhile, the cost of nursing services in ambulatory care units was estimated only per visit as shown in chapter 4. Conclusion: Future research on nursing cost should be extended to other special nursing units such as various intensive nursing care units, delivery room, and so on. In addition, the patient classification system should be refined for its appropriateness to apply all levels of medical institutions.
본 연구의 목적은 일반강도 콘크리트 배합에 있어서 다양한 감수제에 따른 유동성과 품질 안정성을 평가하는 데에 있다. 감수제의 사용은 골재 품질이 저하되는 최근의 상황에서 피할 수 없지만 적절한 성능의 감수제 사용이 중요하다. 이에 본 연구에서는 일반강도 수준의 모르타르에 대하여 세 가지 종류의 감수제에 대하여 유동성 증진성능과 더불어 품질안정성을 레올로지적으로 평가하였다. 또한 콘크리트 배합에 있어서 단위수량 변화에 따른 유동성 변화를 측정하였으며 단위수량 저감효과와 그에 따른 제조원가를 산정하고 비교하였다. 본 연구를 통해 실제 현장에서 적절한 성능의 감수제를 선택할 수 있는 사례를 제공하고 이를 통해 경제적이고 효과적으로 유동성을 발휘하며 안정적인 품질을 확보할 수 있는 환경 마련에 기여하고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.