• Title/Summary/Keyword: 원가 산정

Search Result 210, Processing Time 0.027 seconds

원가 산정법에 기반한 인터넷 입찰 시스템의 효율적 입찰가 생성 에이전트 (An Efficient Bid Pricing Agent for Internet Bid Systems Based on Costing Methods)

  • 박성은;이용규
    • Journal of Information Technology Applications and Management
    • /
    • 제11권3호
    • /
    • pp.23-33
    • /
    • 2004
  • Internet bid systems have been widely used recently. In those systems, the bid price is provided by the seller. When the bid price is set too high compared with the normal price, the successful bid rate can be decreased. Otherwise, when it is set too low based on inaccurate information, it can result in a successful bid with no profit at all. To resolve this problem, we propose an agent that automatically generates bid prices for sellers based on various costing methods such as the high-low point method, the scatter diagram method, and the learning curve method. Through performance experiments, we have found that the number of successful bids with appropriate profit can be increased using the bid pricing agent. Among the costing methods, the learning curve method has shown the best performance. Also, we discuss about how to design and implement the bid pricing agent.

  • PDF

전단보강된 기초의 지반에서의 거동해석 (Nonlinear Finite Element Analysis of Foundation with Shear Reinforcements on the Ground)

  • 이원호;이용재;황보석;양원직;허갑수;진성찬
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2011년도 정기 학술대회
    • /
    • pp.615-618
    • /
    • 2011
  • 최근 건설공사에서 많은 물량이 투입되는 기초구조의 자재비 및 원가절감을 위해 여러 가지 기초구조시스템이 개발되고 있으나, 보편적으로 현장에 적용하기에는 다소 무리가 있는 것으로 지적받고 있다. 본 연구는 강판을 ㄷ자형으로 절곡한 기초전단보강시스템을 개발하기 위한 해석적 연구의 일환으로 진행되었다. 현행 전단머리 보강식에서는 기초판에 대한 전단내력 산정을 위한 기준식이 마련되어 있지 않으며 플랫플레이트 슬래브의 기준식에 따르도록 되어져있다. 그러나 기초판은 지반에 지지되는 구조물로 플랫플레이트 슬래브와는 경계조건이 다르다. 따라서 본 연구에서는 지반에 지지된 경우와 플랫플레이트 슬래브와 같이 모멘트 제로지점을 단순지지한 형태로 기초구조물을 모델링하여 해석을 실시하였다. 해석프로그램은 유한 요소기법이 적용된 ABAQUS를 사용하여 두 지지조건의 차이가 구조물에 미치는 영향을 비교분석하였다.

  • PDF

전기부문 표준품셈 체계개편과 전기공사업계의 영향분석 (System reorganization of electrical standard Production Units and effect analysis of electrical construction business)

  • 임승학;황민수;신경수;김종인;선안숙
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.2060-2061
    • /
    • 2007
  • 본 논문에서는 국가 경제성장률과 국내 전기공사실적 증가률에 대한 상관관계를 비교분석하였으며, 연간 전기공사 실적에 대한 항목별 구성비율 중 노무비가 차지하는 비율을 분석하였다. "국가를 당사자로 하는 계약에 관한 법률 시행령 및 시행규칙"과 회계예규인 "예정가격 작성기준"에 근거하여 원가계산에 의한 전기공사 예정가격 산정의 기초자료로 활용되는 전기부문 표준품셈 체계개편이 전기공사업에 미치는 영향을 최근 발주된 대형공사에 체계개편 전과 체계개편 후 공사금액을 비교하여 종합적으로 분석하였다.

  • PDF

자동차 부품산업의 견적원가 산정을 위한 표준 프로세스 합리화 방안 연구 (Standard Process Rationalization Research of Estimation Cost for Automotive Parts Industry)

  • 김영철;강경식
    • 대한안전경영과학회지
    • /
    • 제18권4호
    • /
    • pp.115-122
    • /
    • 2016
  • Price quotations for SOR / RFQ from OEM clients is a very important process in the automotive parts industry. However, OEM clients are demanding a price quote on short duration but it takes long delivery time due to sales, research and development, purchasing, production and cost management departments role and jobs focused on detail and responsibility. And to provide a reasonable alternative with eliminating the waste of non-value processes is to achieve OEM clients satisfaction through standardized and parallel processing, IT system based on the systems and processes of global benchmark companies.

현장실태 조사를 통한 가로수전정 원가기준 마련 연구 (A Study on the Cost Criteria for Street Tree Pruning through Field Survey)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 봄 학술논문 발표대회
    • /
    • pp.210-211
    • /
    • 2022
  • Pruning is the most important work for the growth and aesthetics of street trees. It is also the most actively conducted maintenance work. However, the specifications, application methods, and cost criteria for pruning have not been systematically established. This has recently caused a lot of confusion in the practice of street tree pruning, such as indiscriminate pruning and lack of construction costs. Therefore, this study clarified the contents of work according to the form of pruning. It added 'aesthetic pruning,' which takes into account design. In addition, It revised equipment not in conformity with the law and excluded personnel necessary for on-site traffic control so that they could be reflected separately. As a result, this study is expected to contribute a lot to securing appropriate construction costs for maintaining street trees.

  • PDF

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

자원기준 상대가치를 이용한 혈액투석실 간호원가 산정;중증 대상자를 중심으로 (Estimation of Nursing Cost for Hemodialysis Using RBRVS(Resource Based Relative Value Scale);Severe Hemodialysis Patients)

  • 김문실;한수정;김정아;김지현
    • 간호행정학회지
    • /
    • 제11권1호
    • /
    • pp.33-44
    • /
    • 2005
  • Purpose: This study was aimed to estimate nursing cost for hemodialysis of tertiary hospitals using Resource Based Relative Value Scale(RVRBS). Method: First, we calculated nursing workload of the each hemodialysis-nursing behaviors compared with basic nursing behavior(check vital sign) for the most severe hemodialysis patients in general hospitals. Second, we measured each spent time according to each nursing behaviors. Third, we computed Resource Based Relative Value(RBRV) scores and nursing expenses of each 14 nursing behavior for hemodialysis. Finally, we estimated nursing cost of each hemodialysis-behavior for the most severe hemodialysis-patients in general hospitals. Result: The mean RBRV scores for each nursing behaviors were from 218.9 to 383.9 points. The highest RBRV socres were 383.9(Complication during hemodialysis). The Nursing behavior that spent the most time was "access the vascular( 31.7 minutes)". Nursing cost per hemodialysis for the patient with severe condition was estimated 63,455(won). Conclusion: Total average workload was 347.6 points and total spent time was 306.5 minutes for 14 hemodialysis nursing behaviors provided to severe patients. There were clear differences in nursing workload and cost according to patient's severity-mild, moderate and severe class.

  • PDF

상대가치(Resource-Based Relative Value)를 이용한 간호행위별 간호원가 산정 (Estimation of nursing costs for hospitalized patients using the resource-based relative value scale)

  • 박정호;송미숙;성영희;조정숙;심원희
    • 간호행정학회지
    • /
    • 제5권2호
    • /
    • pp.253-280
    • /
    • 1999
  • A cost analysis for hospitalized patients was performed based on the RBRVS in order to determine an appropriate nursing fee schedule. The study was conducted through three phases as follows: 1) Nursing activities provided for the inpatients currently in Korea were identified and classified using a taxonomy which was developed by our research team through the Delphi process. 2) The resource-based relative points for every nursing activity according to nursing time, mental effort and judgement, technical skill, physical effort and stress were determined through a survey of 300 clinical RNs working at 5 tertiary hospitals from May 25 to July 25. 1998. 3) The nursing cost of every nursing activity for hospitalized patients was estimated based on the RBRVS. As a result, 136 nursing activities were identified and classified by nursing processes and nursing domains. However, our classification system of nursing activities should continue to be refined, and all nursing practices should be standardized. The nursing activities were given resource-based relative points ranging from 100 to 400 points, then each nursing activity was assigned a value for the RBRVS, which was determined by the exponential function of 2resource-based relative point/100. Thus, a value of 2 was calculated for 100 points, 4 for 200 points, 8 for 300 points, and 16 for 400 points. Meanwhile, the unit cost of nursing was calculated as 170 Won. The nursing cost of 136 nursing activities was estimated using the RBRVS as shown in

    . A proper nursing fee schedule for a new reimbursement system based upon the results of the above study should be prepared in the near future.

  • PDF
  • 임상특수분야 간호원가 산정;응급실, 수술실, 외래를 중심으로 (Estimation of nursing cost for selected special nursing services;operative nursing, emergency nursing, and ambulatory nursing)

    • 박정호;성영희;김을순;박광옥;박정숙;성일순;송미숙;조문수
      • 간호행정학회지
      • /
      • 제8권2호
      • /
      • pp.309-321
      • /
      • 2002
    • Purpose: A cost analysis for nursing services in operative nursing unit, emergency nursing unit, and ambulatory nursing unit was performed using patient classification system by nursing intensity in order to determine an appropriate nursing fee schedule. Method: The data were collected from 4 secondary hospitals and 5 tertiary hospitals from November 14th 2000 to January 15th 2001. The study was conducted through four phases as follows: 1) Nursing hours of each nursing service in special nursing units were measured using three kinds of patient classification systems by nursing intensity. 2) The nursing cost of nursing services in operative nursing unit, emergency nursing unit, and ambulatory nursing units was estimated based on patient classification system by nursing intensity. Results: As a result, nursing hours by nursing intensity of each special nursing unit were measured, and every nursing cost by nursing intensity in operation room and emergency room was estimated, meanwhile, the cost of nursing services in ambulatory care units was estimated only per visit as shown in chapter 4. Conclusion: Future research on nursing cost should be extended to other special nursing units such as various intensive nursing care units, delivery room, and so on. In addition, the patient classification system should be refined for its appropriateness to apply all levels of medical institutions.

    • PDF

    일반강도 콘크리트의 효과적인 유동성 증진 및 품질안정성 확보를 위한 감수제 성능에 대한 연구 (Study on Water Reducer Performance for Efficient Fluidity Development and Securing Robustness of Normal Strength Range Concrete)

    • 손배근;한동엽
      • 한국건축시공학회지
      • /
      • 제17권5호
      • /
      • pp.429-435
      • /
      • 2017
    • 본 연구의 목적은 일반강도 콘크리트 배합에 있어서 다양한 감수제에 따른 유동성과 품질 안정성을 평가하는 데에 있다. 감수제의 사용은 골재 품질이 저하되는 최근의 상황에서 피할 수 없지만 적절한 성능의 감수제 사용이 중요하다. 이에 본 연구에서는 일반강도 수준의 모르타르에 대하여 세 가지 종류의 감수제에 대하여 유동성 증진성능과 더불어 품질안정성을 레올로지적으로 평가하였다. 또한 콘크리트 배합에 있어서 단위수량 변화에 따른 유동성 변화를 측정하였으며 단위수량 저감효과와 그에 따른 제조원가를 산정하고 비교하였다. 본 연구를 통해 실제 현장에서 적절한 성능의 감수제를 선택할 수 있는 사례를 제공하고 이를 통해 경제적이고 효과적으로 유동성을 발휘하며 안정적인 품질을 확보할 수 있는 환경 마련에 기여하고자 한다.